Request for Proposal for Lawn Care Maintenance
Project Information
- Bid Title
- Request for Proposal for Lawn Care Maintenance
- Issuing Agency
- Vernal city
- Location
- Utah
- Published Date
- Jan 2, 2026
- Closing Date
- Mar 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Request for Proposal for Lawn Care Maintenance
Category: Lawn Mowing Status: Open Description: Click here for full RFP PDF document. Subject: Request for Proposal (RFP)
Vernal City is seeking proposals from qualified Contractors to carry out the lawn care maintenance for the Freestone Walking Park(6), the city owned area of Aggie blvd and intersecting Main st. areas(1), Memory Grove located on Robinwood lane(2), New Cobble Rock block 100 South 100 East patch(3), T-Rex and adjacent “Welcome” sign grass(4), (7)City Hall 100 South patch and East side of PD (7), and the 500 North 500 West two triangle parcels(5). (See corresponding maps and descriptions included below). Your company is invited to submit a proposal in response to this Request for Proposal (RFP).
Sealed Bid Requirement:
Proposals must be submitted in a sealed envelope and clearly marked "Proposal for Lawn Care Maintenance", to ensure the integrity and confidentiality of the submission. The sealed bid requirement is mandatory for all vendors participating in this RFP process. Email submissions are not permitted.
Proposal Due Date:
Proposals must be received no later than March 15, 2026 , by 4:00 P.M. Late submissions will not be accepted or considered. Please allow sufficient time for your proposal to be delivered and received by the due date.
Submission Method:
Proposals can be submitted by mail, or delivered in person, to the following address:
Vernal City Finance Director
Nick Rousseau
374 East Main
Vernal, UT 84078
Project Specifications:
Mowing: Contractor will mow all turf areas at the areas referred to above, once a week - theWalking Park every other week -from April 15th to September 30th during the contract period. During the rest of the year, the contractor will mow as needed to keep the grass from growing more than 1 ½” above the mowing height. Mowing height shall be no less than three inches and no higher than three and one half inches (3 ½”) as measured to the mower blade from a flat, paved surface. Walking Park grass length may be mowed at 4 ½ inches because it is a field. Clippings may be left on the turf as long as no visible clumps remain on the grass surface after mowing. Otherwise, clippings must be collected and disposed of by the Contractor. Please provide the following:
Weekly costs for all areas except the Freestone Walking Park, and
Bi-weekly cost for the walking park, (i.e., every other week), and
Cost per mowing before April 15, 2026, and
Cost per mowing after September 30, 2025
Edging and Trimming: All areas except Freestone Walking Park to be edged weekly along the edges, sidewalks, driveways, and around trees, fence edges etc. during the period of mowing contract for the same areas listed for mowing. Grass around sprinkler heads shall be trimmed so that grass does not interfere with or interrupt the irrigation system.
Freestone walking Park to be edged every other week.
Contractor shall have all debris blown off paved and or concrete areas when done each week.
Proposal Requirements:
All proposals shall include the maintenance specifications for the lawn care mowing and trimming. Along with the requested billing schedule.
Proposal Evaluation Criteria:
The selection of the vendor will be based on various factors, including but not limited to:
How well the proposal meets the needs of Vernal City and the guidelines of the RFP.
Price and other considerations of value.
Please note that the lowest or any proposal will not necessarily be accepted. Vernal City reserves the right to reject any or all proposals received. Proposals that do not meet the required specifications will not be considered.
Timeline:
RFP Released January 2, 2026
Deadline for Questions: Feb 14, 2026
Proposal Due Date: March 15, 2026 at 4:00 pm.
Evaluation Period: Approximately 1 Week
Contract Award: Anticipated week of April 8-12th
Questions and Clarifications:
All questions or requests for clarifications regarding this RFP should be submitted to Wayne Smith via email at For security reasons, you must enable JavaScript to view this E-mail address. by phone at 435-218-1887.
Ownership of Proposal:
All materials submitted in response to this RFP will become the property of Vernal City and will not be returned to the vendor.
We look forward to receiving your proposal and appreciate your interest in working with Vernal City. Should you require any additional information or have any questions, please do not hesitate to contact Wayne Smith at 435-218-1887 or For security reasons, you must enable JavaScript to view this E-mail address. .
Thank you for your attention to this matter.
Sincerely,
Nick Rousseau
Finance Director
Vernal City
435-781-7103
For security reasons, you must enable JavaScript to view this E-mail address.
Publication Date/Time: 1/2/2026 12:00 AM Closing Date/Time: 3/15/2026 4:00 PM Contact Person: Wayne Smith at 435-218-1887 or wsmith@vernal.gov. - Commodity Codes
-
- NAICS 561730Landscaping Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Integrated Solid Waste Manage...
Follow Integrated Solid Waste Management for Hill AFB Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 7/29/2026
Integrated Solid Waste Manage...
Follow Integrated Solid Waste Management for Hill AFB Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 7/29/2026