Addendum 2 BDC02-26/27 Blue Spring - Restroom Replacement

Project Information

Bid Title
Addendum 2 BDC02-26/27 Blue Spring - Restroom Replacement
Issuing Agency
State Government of Florida
Location
Florida
Published Date
Oct 2, 2026
Closing Date
Oct 13, 2026
Government Level
State & Local
Status
Closed
Ref. #
BDC02-26/27
Original Source
Join to Access Full Details
Project Description

October 2, 2026

NOTICE TO APPLICANTS

ADDENDUM NO. TWO (2)

Blue Spring - Restroom Replacement

DEP BID NO. BDC02-26-27

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The bid submittal due date and bid posting date for this project have been postponed:

BID SUBMITTAL DUE DATE: No later than 3:30 PM (ET), Tuesday, October 13, 2026, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000, Attention: Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, (850) 245-2519. (For hand delivery: Carr Building, Welcome Desk.) The Department reserves the right to reject any or all bids.

BID POSTING DATE: No later than 3:30 PM (ET), Tuesday, October 20, 2026, unless extended by the Department for good cause.

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. What is the proposed height of the gravity wall the finish grade elevations directly behind the wall. There is a call out on the civil drawings but the heights don’t seem to allow enough cover for the rock and clean sand detail located on page A-302 detail 2.

Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls.

2. What type of sod is required, and is there a timeframe for watering after installation?

Response: Bahia type sod should be used water until sod has rooted.

3. The Architectural plans (page A401) show the guardrail as having wire mesh and the civil plans (Page C501) for hand rail details show a different style rail. Can you confirm which railing you want or where the wire mesh is located?

Response: Plans A401 should be used.

4. Impact and Permit Fees: Is the contractor responsible for any impact fees, permit fees, or other governmental fees associated with this project? If so, can DEP provide an estimated amount or percentage that should be carried in the contractor's bid or set an allowance for these costs?

Response: Permitting fees and estimates not provided, to be handled by contractor.

5. 15% Contractor-Performed Requirement: Please provide the exact method DEP will use to calculate and verify compliance with the 15% contractor-performed requirement. Specifically, can salaried project management, superintendent, administrative, procurement personnel, in-house labor, company-owned tools, equipment, and other direct contractor costs be included toward the 15% requirement? If so, how should these costs be converted to and documented as a dollar value?

Response: Yes. A schedule of Values is used to verify compliance with the 15% rule.

6. Construction Fencing: Is temporary chain-link fencing around the construction area mandatory to secure the site and prevent public access? If required, please provide any minimum height, screening, gate, or other fencing requirements.

Response: Site security is the Contractors responsibility, min 6’ fence height.

7. Existing Utilities: When the existing building was demolished, were all existing utilities identified, marked, properly disconnected, and capped? If so, are records or as-built information available showing the locations and termination points of these utilities?

Response: Contractor to locate and verify contractor to verify all utility line locations, sizes, and directional flows prior to construction/demolition contractor to notify engineer of located utility lines c103.

8. Builder's Risk Insurance: What are the required Builder's Risk insurance limits and deductible requirements for this project? Is the contractor required to include any existing DEP-owned buildings, structures, equipment, or other property within the Builder's Risk coverage?

Response: Builder’s risk must encompass the totality of the project’s cost. Yes.

9. Contractor Staging and Site Logistics: Can DEP designate or approve specific areas for contractor staging, material laydown, dumpsters, temporary toilets, contractor/subcontractor parking, and material deliveries? If areas have already been established, please identify them on the site plan.

Response: Yes, DEP will designate staging areas during preconstruction meeting.

10. When is the question deadline so we can let our sub-contractors know.

Response: The RFI deadline is 10 days prior to the bid opening.

11. Will there be an onsite pre-bid meeting.

Response: No.

12. Gravity wall, missing information

Section 2/A-302 shows the gravity wall but carries no dimensions for it and no reinforcing, and A-101 describes it as reinforced concrete. Please provide the stem thickness, footing size and reinforcing for the gravity wall, and confirm the top-of-wall and bottom-of-footing elevations against the spot grades on C-102.

Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls.

13. Masonry Lintels / Wall Louvers

The four wall louvers are scheduled on M-101, as 12" x 68" Greenheck EVH-501D, please provide the lintel type/size over these openings.

Response: Please see the lintel schedule provided on 7/S201. Opening is only 12” wide.

14. Footing Information

Please clarify the footing size for section 6/S-300. Please also confirm there is no top reinforcing for the strip footings shown in 6/S-300 & 7/S-300

Response: Footings in these two sections to be 2ftx2ft.

15. Finish Floor Elevations

C-102 Shows a finish floor elevation in the chase of 18.30, which is 1’ higher than the restrooms – this does not seem to match the sections on A-201 (East/South), please clarify

Response: The finished floor elevations shown on sheet C-102 are correct. Please see revised corresponding structural details on sheet S-300. A revised architectural elevation reflecting the multiple finished floors is forthcoming.

16. Erosion Control

We note the silt fence and tree removal shown on C-101, please clarify if the Tree Protection and Construction Entrance shown on C-500 are required and if so, where?

Response: Yes, tree protection will be required for the one tree noted to remain on the south side of the building. See sheet C-102. The construction entrance must be coordinated with the Park Manager and is at Manager’s discretion for location.

17. Hand Dryers

The architectural drawings show six electric hand dryers but panel P1 carries five hand dryer circuits. Please confirm the quantity and add the sixth circuit if required.

Response: Electrical Engineering comments are forthcoming.

18. Based on the positioning of the new building as shown on A-100 and the surrounding grade, it does not appear that the gravity wall/retaining wall is required from a grading standpoint. Section A-A on C-102 does not show the wall either. Please confirm the retaining wall is still required, along with the guardrails depicted on A-401

Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls.

19. If the concrete wall is deleted and the new guardrail is still required, please provide post/base mounting details?

Response: Please see revised architectural plan sheet A-302, which removes references to a gravity/retaining wall. The grading design uses slopes up to the building and walkway slabs and does not require retaining walls.

20. Does work performed by an owner or member of the LLC count toward the 15%, or must it be performed by W-2 employees on the contractor's payroll?

Response: Yes, work performed by an owner or member of the LLC count counts toward the 15%.

21. How will DEP document and verify compliance with the 15% (for example, certified payroll, a self-performance affidavit, a schedule of values identifying self-performed work, or another method)? Is anything required at bid submission, or only after award?

Response: A Schedule of Values is used. Nothing is required at bid submission.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Commodity Codes
Code Title
72121100 Commercial and office building construction services
72121101 Commercial and office building new construction service
72121400 Specialized public building construction services
72141120 Sewer line construction service
72141122 Electric power line construction service
72141125 Pumping station construction service
72141126 Underground utilities construction service
72141205 Drainage system construction service
72141510 Demolition services
72151100 Plumbing construction services
72151101 Septic system construction service
72151201 HVAC mechanical construction service
72151500 Electrical system services
72151502 Electric power system construction service
72151900 Masonry and stonework services
72151901 Foundation building service
72153609 Domestic or commercial appliance installation service
95121641 Pumping station
95121642 Sewage pumping station
95121700 Public buildings and structures
Contact Information
Name Logan Lee-Marple
Email logan.leemarple@floridadep.gov
Phone (850) 245-2519
Address 3800 Common Wealth Blvd Tallahassee FL 32399-3000
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Orange Hammock WMA- Road Repairs

The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing to procure

State Government of Florida

Bid Due: 10/21/2026

KC-46A ADAL Apron and Hydrant...

Follow KC-46A ADAL Apron and Hydrant Fueling Pits Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 10/23/2026