Project ID: CIP No. 60177

Title: Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177

Addenda: 0

Release Date: 8/7/2026

Due Date: 9/15/2026

Follow
Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
Invitation for Bids
Public Works
Project ID: CIP No. 60177
Release Date: Friday, August 7, 2026
· Due Date: Tuesday, September 15, 2026 2:00pm
Posted Friday, August 7, 2026 4:31pm
All dates & times in Pacific Time
Draft Response Events RSVP No Bid
Time Remaining: 36 days, 19 hours, 38 minutes


Post Information

Posted At:Fri, Aug 7, 2026 4:31 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, hereinafter referred to as City or AGENCY invites sealed bids for the above stated project and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package.

Scope of Work: The Work encompassed by the Project is more specifically defined in the Contract Documents, but in general consists of, but is not limited to the following Work:

Main Street Well #3:

  • Perform pre-removal testing and document existing pump and motor operating conditions.
  • Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
  • Perform downhole video inspection and submit well-condition assessment report.
  • Convert the existing oil-lubricated lineshaft system to a continuous water-lubricated configuration, where indicated and authorized.
  • Perform brushing, bailing, chemical treatment, dual-swab airlifting, redevelopment, and related well rehabilitation only when authorized by the City based on inspection results.
  • Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
  • Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
  • Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, and post-rehabilitation inspection where required.
  • Restore disturbed areas and complete closeout requirements.

Newport Well #3:

  • Perform pre-removal testing and document existing pump and motor operating conditions.
  • Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
  • Perform downhole video inspection and noninvasive electromagnetic casing-thickness/integrity analysis; submit well-condition assessment report.
  • Because Newport Well No. 3 is considered fragile, perform well cleaning, redevelopment, casing repair, or other downhole rehabilitation only when specifically authorized by the City.
  • Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
  • Install new magnetic flow meter and MOV on the waste-discharge piping.
  • Remove and replace the existing magnetic flow meter and MOV on the system-discharge piping.
  • Remove existing electrical equipment as needed and furnish/install new electrical, controls, instrumentation, PLC, and SCADA work where required.
  • Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
  • Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, meter/MOV testing, and post-work inspection where required.
  • Restore disturbed areas and complete closeout requirements.


Background

Project Schedule (contract days): 150 Days

Engineer’s Estimate: $ 775,000

Liquidated Damages: $ 1,000 Per Day

Bid Valid (calendar days): 60 Days

Contractor's License(s): Class A



Timeline

Advertisement/Release Project Date:
August 7, 2026
Pre-Bid Meeting (Mandatory):
August 20, 2026, 10:00am
Begin at Main Street Well No. 3 (235 E. Main St., Tustin)
Question Submission Deadline:
August 27, 2026, 5:00pm
Bid Opening:
September 15, 2026, 2:00pm
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 237110Water and Sewer Line and Related Structures Construction
  • NAICS 237310Highway, Street, and Bridge Construction
  • NAICS 237990Other Heavy and Civil Engineering Construction
  • NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Northeast Del Rosa Area ADA R...

Bid Solicitation # PWG127-LANDD-6542 Bid Solicitation # PWG127-LANDD-6542 Organization Name Public Works Blanket

County of San Bernardino

Bid Due: 10/22/2026

Pre-Qualification: Overhead C...

Project ID: Pre-Qual - C26152F Title: Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project

Santa Clara Valley Transportation Authority

Bid Due: 11/13/2026