RFB 23-185.07 Fairfield CTC 2026 Maintenance Project
Project Information
- Bid Title
- RFB 23-185.07 Fairfield CTC 2026 Maintenance Project
- Issuing Agency
- Fairfield County
- Location
- South Carolina
- Published Date
- Mar 24, 2026
- Closing Date
- May 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Document Due Date Addendum 2nd Addendum Plan Design Bid Tabulations Bid Awarded Respondent Listing
RFB 23-185.07 Fairfield CTC 2026 Maintenance Project
05/05/2026 - Attachment Preview
-
REQUEST FOR BIDSFORFAIRFIELD CTC 2026 MAINTENANCE PROJECTAdvertisement Date: March 24, 2026Project Number: 23-185.07Bids Due: Tuesday, May 5, 2026, at 10:00 AMLength: 1.57 MilesType: Miscellaneous Maintenance of Three (3) Roads inFairfield County, SCEngineer: Infrastructure Consulting & Engineering (ICE)Contractor:Address:RFB No.: 23-185.07TABLE OF CONTENTSTABLE OF CONTENTSSECTION I: NOTICE TO CONTRACTORS: ........................................................................................4SECTION II: GENERAL CONDITIONS & CONTRACT: ........................................................................6GENERAL CONDITIONS: ......................................................................................................................................7FORM OF AGREEMENT: .................................................................................................................................... 14PERFORMANCE BOND: ..................................................................................................................................... 19PAYMENT BOND: .............................................................................................................................................. 20SECTION III: SPECIAL PROVISIONS:............................................................................................. 21DEFINITION AND TERMS:.................................................................................................................................. 22SUBSTANTIAL COMPLETION OF WORK: ........................................................................................................... 22STANDARD DRAWINGS:.................................................................................................................................... 22STANDARD DRAWING ERRATA:........................................................................................................................ 23AWARD OF CONTRACT: .................................................................................................................................... 25PROPOSAL ITEMS AND QUANTITIES:................................................................................................................ 25CONSTRUCTION STAKES, LINES, AND GRADES: ................................................................................................ 25QUALIFIED PRODUCT LISTINGS: ....................................................................................................................... 25SOUTH CAROLINA MINING ACT:....................................................................................................................... 25DBE PARTICIPATION: ........................................................................................................................................ 25CONSTRUCTION QUALITY CONTROL AND ASSURANCE TESTING: .................................................................... 25INSURANCE REQUIREMENTS:........................................................................................................................... 26RETAINAGE: ...................................................................................................................................................... 26PROMPT PAYMENT CLAUSE: ............................................................................................................................ 27MANUFACTURERS MATERIALS CERTIFICATION AND CERTIFIED TESTS:........................................................... 27REQUIRED MEDIA NOTIFICATION FOR CONSTRUCTION PROJECTS:................................................................. 27REQUIRED COMPLIANCE CONCERNING ILLEGAL ALIENS:................................................................................. 27TEMPORARY SUSPENSION OF RESURFACING WORK: ...................................................................................... 27PROSECUTION OF ROAD IMPROVEMENT WORK: ............................................................................................ 27CONTRACT TIME AND EXTENSION OF CONTRACT TIME:.................................................................................. 27FAILURE TO COMPLETE WORK ON TIME: ......................................................................................................... 27COORDINATION OF UTILITY RELOCATION WORK WITH HIGHWAY CONSTRUCTION: ...................................... 28CEMENT MODIFIED RECYCLED BASE: ............................................................................................................... 28FUEL ADJUSTMENT INDEXES: ........................................................................................................................... 28RATE OF APPLICATION:..................................................................................................................................... 28CORRECTING LOW SHOULDERS:....................................................................................................................... 28DRESSING OF SHOULDERS:............................................................................................................................... 28BORROW EXCAVATON FOR SHOULDERS:......................................................................................................... 28CLEAN UP:......................................................................................................................................................... 28WORK TO BE INCLUDED IN THIS PROJECT: ....................................................................................................... 28MAINTENANCE OF TRAFFIC:............................................................................................................................. 29MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES: ...................................................................................... 29TRAFFIC CONTROL: ........................................................................................................................................... 29CONSTRUCTION SCHEDULE:............................................................................................................................. 33FAIRFIELD COUNTYTOCRFB No.: 23-185.07TABLE OF CONTENTSTABLE OF CONTENTS CONTINUEDSURPLUS MATERIAL:......................................................................................................................................... 33SEEDING: .......................................................................................................................................................... 33MAINTENANCE STONE: .................................................................................................................................... 34STATION GRADING: .......................................................................................................................................... 34BITUMINOUS SURFACING: ............................................................................................................................... 34BITUMINOUS SURFACING – DOUBLE TREATMENT:.......................................................................................... 34BITUMINOUS SURFACING OPERATIONS: ......................................................................................................... 34PERMANENT PIPE CULVERTS : .......................................................................................................................... 35PIPE DISPOSAL: ................................................................................................................................................. 35LUMP SUM BID ITEMS: ..................................................................................................................................... 35WARRANTY:...................................................................................................................................................... 35WORK SCHEDULE: ............................................................................................................................................ 35HMA FULL DEPTH PATCHING:........................................................................................................................... 35ASPHALT BINDER ADJUSTMENT INDEX: ........................................................................................................... 35HMA SURFACE TYPE E:...................................................................................................................................... 35WATER LINE REPAIR: ........................................................................................................................................ 35EQUIPMENT:..................................................................................................................................................... 36PAVEMENT MARKING: ..................................................................................................................................... 36SECTION IV: SUPPLEMENTAL SPECIFICATIONS: .......................................................................... 37THE SOUTH CAROLINA MINING ACT:................................................................................................................ 38MAINTENANCE AND MAINTENANCE OF TRAFFIC:............................................................................................. 39FORCE MAJEURE EVENT: .................................................................................................................................. 40EROSION CONTROL MEASURES:....................................................................................................................... 42PROMPT PAYMENT CLAUSE : ........................................................................................................................... 44REMOVAL OF EXISTING ASPHALT PAVEMENT BEFORE PATCHING:.................................................................. 45TG-31 PLACEMENT OF STOP BARS & SIGNS:..................................................................................................... 46CEMENT MODIFIED RECYCLED BASE : .............................................................................................................. 48PERMANENT PIPE CULVERTS:........................................................................................................................... 56CORRECTING LOW SHOULDER CONDITIONS: ................................................................................................... 79FAILURE TO COMPLETE WORK ON TIME: ......................................................................................................... 81FUEL ADJUSTMENT INDEXES: ........................................................................................................................... 82SECTION V: BID FORMS:............................................................................................................ 83BID BOND: ........................................................................................................................................................ 89SECTION VI: PROJECT INFORMATION: ....................................................................................... 90ESTIMATED QUANTITIES BY ROAD: .................................................................................................................. 91PROJECT STANDARDS DRAWINGS:................................................................................................................... 93PROJECT MAPS: ................................................................................................................................................ 97SIGN SCHEDULE: ..............................................................................................................................................102PERMANENT CONSTRUCTION SIGNS: .............................................................................................................103FAIRFIELD COUNTYTOCRFB No.: 23-185.07NOTICE TO CONTRACTORSSECTION I: NOTICE TO CONTRACTORSPROJECT NAME: FAIRFIELD COUNTY MAINTENANCE PROJECTPROJECT NUMBER: 23-185.07PROJECT LOCATION: Fairfield County, SCBID BOND/SECURITY: Required at 5% of the bid amountPERFORMANCE BOND: Required at 100% of the bid amountPAYMENT BOND: Required at 100% of the bid amountDBE PARTICIPATION: Encouraged at 5% or greaterDESCRIPTION OF PROJECT: Miscellaneous Maintenance of Three (3) Roads in Fairfield County, SCAGENCY/OWNER: Fairfield County, 250 N. Walnut Street, Winnsboro SC 29180ENGINEER: INFRASTRUCTURE CONSULTING AND ENGINEERING, LLC (ICE): Project Manager, Brian Faulkenberry, 121Midlands Court, West Columbia, SC 29169, Email: brian.faulkenberry@ice-eng.com, Cell: 803-287-4904QUESTIONS: All questions, requests, and correspondence shall be addressed to the Project Manager, BrianFaulkenberry. All questions concerning the Bid Documents shall be in writing and submitted by COB April24, 2026.PLANS AND BID DOCUMENTS ON FILE: Fairfield County Procurement Office, INFRASTRUCTURE AND CONSULTINGENGINEERING, LLC (ICE) West Columbia, SCPLAN DEPOSIT: Bid Documents may be obtained as hard copy from the Engineer for $100.00 non-refundablefee or electronic copy for no charge.PRE-BID CONFERENCE: There will be no pre-bid conference. Any questions or concerns should be addressed byemail only to Brian Faulkenberry, at brian.faulkenberry@ice-eng.com. All questions with answers will beforwarded to all known plan holdersPUBLIC BID CLOSING AND OPENING: Tuesday, May 5, 2026, 10:00 AM at County Government Complex, 250North Walnut Street, Winnsboro SC 29180BID SUBMITTAL: Submit Sealed Bids clearly marked “RFB: 23-185.07” with the bidder’s name, address,and South Carolina contractor license number on the envelope to: Fairfield County Procurement, Attn: Ms.Timika Beaver, County Government Complex, P.O. DRAWER 60, 250 North Walnut Street, Winnsboro SC29180”SUBSTANTIAL COMPLETION: All Roadways will be completed by September 15, 2027.FAIRFIELD COUNTYPAGE 4RFB No.: 23-185.07NOTICE TO CONTRACTORSIF YOU DOWNLOAD THISDOCUMENT WITH INTENT TO BID,PLEASE EMAILBRIAN FAULKENBERRY ATBRIAN.FAULKENBERRY@ICE-ENG.COMTO RECEIVE ANYADDENDA OR OTHERMODIFICATIONS THAT MAY BEISSUED AT A LATER DATEFAIRFIELD COUNTYPAGE 5
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Snow Hill Water Project (Divi...
Project Name: Snow Hill Water Project (Division 2 - Tank) Agency/Owner: Town of
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
HopeHealth Medical Plaza Door...
Project Name: HopeHealth Medical Plaza Door Installation Project Agency/Owner: HopeHealth Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026