Chapel Point Woods Reverse Osmosis Reject Water Storage Tank (UN 1269)
Project Information
- Bid Title
- Chapel Point Woods Reverse Osmosis Reject Water Storage Tank (UN 1269)
- Issuing Agency
- Charles County
- Location
- Maryland
- Published Date
- Jul 1, 2026
- Closing Date
- Aug 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Chapel Point Woods Reverse Osmosis Reject Water Storage Tank (UN 1269)
Addenda: 0
Release Date: 7/1/2026
Due Date: 8/25/2026
Chapel Point Woods Reverse Osmosis Reject Water Storage Tank (UN 1269)FollowInvitation For BidDPW - Capital Project Management24111810 , 30000000Project ID: 27-003Release Date: Wednesday, July 1, 2026· Due Date: Tuesday, August 25, 2026 11:00amPosted Wednesday, July 1, 2026 9:41amAll dates & times in Eastern TimeDraft Response Events RSVP No Bid54 days, 13 hours, 59 minutesOverview
Post Information
Posted At:Wed, Jul 1, 2026 9:41 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe Board of Commissioners for Charles County seeks qualified contractors to provide construction services for installing a new 15,000‑gallon horizontal steel tank, a waste withdrawal station, and all associated piping, heat tracing, and insulation. Work also includes upgrades to the overflow systems for Potable Water Tanks labeled No. 1 and No. 2.
Additional elements include relocating an existing shed, performing required civil site improvements, and completing all related electrical, instrumentation, and system‑integration work. All activities will take place at the Chapel Point Woods Water Treatment Plant.
BackgroundThe Chapel Point Woods Reverse Osmosis (RO) Water Treatment Facility, located at 9040 Spicewood Run in Bel Alton, Maryland, treats groundwater from an on‑site well to produce approximately 20,000 to 35,000 gallons of potable water per day. The facility uses two 25,000‑gallon storage tanks to hold finished drinking water, and these tanks discharge excess water to the ground through existing overflow piping.
The RO process also generates wastewater, which is collected in a dedicated 15,000‑gallon horizontal waste storage tank. The County contracts with a licensed waste hauling service that enters the site daily to remove the accumulated RO waste. Haulers typically use trucks with a capacity of 5,000 to 6,000 gallons, taking either full or partial loads depending on daily production.
The purpose of this project is to: 1. Supplement the existing 15,000-gallon waste storage tank with a new 15,000-gallon tank and extend the waste removal line outside the fence line and 2. Modify the overflow on the existing potable water storage tanks to discharge to grade with the required air gap and check valve.
Timeline
Release Project Date:July 1, 2026Pre-Bid Meeting Registration Deadline (Non-Mandatory):July 28, 2026, 11:00amFirms must register in advance to attend the pre-bid meeting via the County's eProcurement Portal RSVP Manager.
Pre-bid meeting will occur virtually/teleconference, unless otherwise specified. Firms that have registered timely will receive participation instructions.
If multiple attendees from your firm will be attending the meeting, please have each individual complete the eProcurement Portal RSVP Manager process.Pre-Bid Meeting (Non-Mandatory):July 29, 2026, 11:00amPre-bid meeting will occur virtually/teleconference, unless otherwise specified. Firms that register timely and via the County's eProcurement Portal RSVP Manager will receive participation instructions.
The attendance roster will be published on the County's eProcurement Portal.Site Visit (Non-Mandatory):July 30, 2026, 10:00amFirms need to register in advance to attend the site visit. Due to safety restrictions at the site, all visitors proceeding to the site location are recommended to wear steel-toed shoes/boots during the site visit portion of the meeting. The attendance roster will be published on the County's eProcurement Portal.
The site visit address is:
Chapel Point Woods Reverse Osmosis (RO) Water Treatment Facility
9040 Spicewood Run
Bel Alton, Maryland 20611Question Submission Deadline (Non-Mandatory):August 13, 2026, 11:00amQuestions shall be submitted via the eProcurement Portal Question & Answer feature prior to the due date and time specified. The County will not provide responses to questions received after the deadline.Bid Opening Registration Deadline (Non-Mandatory):August 24, 2026, 11:00amRegistration is required to attend the bid opening. Bidders interested in participating in the bid opening must register electronically via the County's eProcurement Portal RSVP Manager. Pricing will be available on the eProcurement Portal after the Bid Opening.Response Submission Deadline:August 25, 2026, 11:00amBid Opening (Non-Mandatory):August 25, 2026, 11:00amBids received timely will be opened virtually. Pricing will be available on the eProcurement Portal after the Bid Opening. - Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 333318Other Commercial and Service Industry Machinery Manufacturing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.