RIA Laurel Street Stormwater Upgrades - Addendum 2
Project Information
- Bid Title
- RIA Laurel Street Stormwater Upgrades - Addendum 2
- Issuing Agency
- City of Conway
- Location
- South Carolina
- Published Date
- Mar 24, 2026
- Closing Date
- Mar 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- RIA Laurel Street Stormwater Upgrades - Addendum 2
- Attachment Preview
-
AECOM Technical Services, Inc.1831 W Evans StreetSuite 200Florence, SC 29501Phone: (843) 254-4400Sent via Duncan ParnellMarch 24, 2026RE: Laurel Street Storm Water UpgradesRIA Grant No.: R-25-1391AECOM Project No. 60751558ADDENDUM NO. 2 – March 24, 2026TO: ALL HOLDERS OF RECORD OF BID DOCUMENTSAcknowledge receipt of this addendum by inserting its number and date in the Bid Form.Failure to do so may subject bidder to disqualification. This addendum forms a part ofthe Contract Documents. It modifies them as follows:Specifications:Section 00311 – Bid FormReplace Bid Form in its entirety with the attached.Clarification:1. Since the location and extent of SCDOT signal wiring is not known, it is to belocated and verified by the contractor as they verify existing conditions. If anyconflicts are noted, the engineer shall be notified immediately for resolution. Assuch, Base Bid Item 45 has been removed from the bid form.Attachments:Specifications00311 – Bid Form – Unit PriceEND OF ADDENDUM NO. 2SECTION 00311BID FORMLAUREL STREET STORM WATERUPGRADESAECOM PROJECT NO.: 60751558FEBRUARY 2026Date:Conway, SCProject No. 60751558PROPOSAL OF, doingbusiness as a corporation / a partnership / an individual (Strike out inapplicable terms), with itsprincipal office in the City of, County of, Stateof, (hereinafter called "Bidder").TO: City of Conway(hereinafter called “Owner”),To all potential bidders:The Bidder, in compliance with your invitation for bids for the construction of the Laurel StreetStorm Water Upgrades having examined the plans and specifications with related documentsand the site of the proposed work, and being familiar with all of the conditions surrounding theconstruction of the proposed project, including the availability of materials and labor, herebyproposes to furnish all labor, materials and supplies, and to construct the project in accordancewith the Contract Documents, within the time set forth therein, and at the prices stated below.These prices are to cover all expenses incurred in performing the work required under theContract Documents, of which this proposal is a part.Bidder hereby agrees to commence work under this contract on or before a date to be specifiedin written "Notice to Proceed" of the Owner and to fully complete the project within 120consecutive calendar days thereafter as stipulated in the specifications. Bidder further agreesto pay as liquidated damages the sum of $500.00 for each consecutive calendar day thereafteras hereinafter provided in Paragraph 9 of the General Conditions.The drawings, specifications and addenda are complementary of each other. What is called forby one shall be as binding as if called for by all. If a conflict between any of the above isdiscovered by the contractor, the problem shall be referred to the Engineer as soon as possiblefor resolution by the Engineer. Should a conflict occur which is not resolved before bid timeand/or is necessary to comply with mandatory requirements (i.e., codes, ordinances, etc.), itshall be the contractor's responsibility to price and bid the more expensive method.Bidder acknowledges receipt of the following addendum:BID FORM - UNIT PRICE00311-112/12No.DatedNo.DatedNo.DatedNo.DatedBidder agrees to perform all of thedescribed in the specifications and shown on the plans for the following unit prices:BASE BIDItem EstNo. Qty1. 12. 13. 14. 175. 106. 487. 2868. 5109. 2210. 611. 112. 113. 25514. 115. 516. 72017. 118. 219. 220. 321. 1222. 123. 124. 125. 8UnitDescriptionUnitPriceLS Traffic Control$_______LSCamera Storm Drainage & UtilityPotholing$_______LS Erosion Control$_______EARemove Drainage Structure (CB, JB,etc)$_______EA Remove Trees$_______LF Remove 12" SD$_______LF Remove 15" SD$_______LF Remove 18" SD$_______LFGravity Sewer Relocation 8" DIP thruConflict Box$_______EA Sewer Service Remove & Replace$_______LSReplace 4" DIP Sewer Service ThroughCatch Basin$_______LSReplace 8" DIP Sewer Line ThroughCatch Basin$_______LF 6" Restrained Joint DIP$_______EA 6"x6" Tapping Sleeve & Valve$_______EA Tie to Ex. Water Line$_______LBS Ductile Iron Fittings$_______EA Temporary Blowoff$_______EA Abandon Existing Gate Valves$_______EA Abandon Existing Water Line$_______EA1" Water Service Conflict- Remove &Replace$_______EA2" Water Service Conflict- Remove &Replace$_______EARemove & Relocate 6" Fire Line/ HydrantLead$_______LS Gas Line Relocation Allowance$ 80,000.00EA Drop Inlet (22x34)$_______EA Catch Basin - Type 1$_______Total$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$ 80,000.00$________$________BID FORM - UNIT PRICE00311-212/1226. 427. 328. 129. 530. 14331. 38432. 33433. 3734. 4235. 236. 56937. 56038. 4839. 165440. 389041. 442. 143. 1EA Catch Basin - Type 17EA Junction BoxEA Junction Box (Large)EA Conflict BoxLF 18" RCPLF 24" RCPLF 30" RCPLF 14" x 23" Elliptical RCPLF Clean Existing 15" RCPEA Tie to Ex. Junction BoxLFRemove & Replace Concrete Curb &GutterLF Remove & Replace Concrete SidewalkLFRemove & Replace Brick PaverSidewalkLF Remove & Replace Asphalt PavementSY Mill & Resurface Asphalt PavementEARemove & Replace Handicap AccessRampLS Pavement MarkingsLS Intersection Traffic Loop Repairs$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$_______$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________$________TOTAL OF BASED BID:$__________________Item EstNo. Qty1. 1ALTERNATE 1UnitDescriptionLS Nightwork PremiumsUnitPrice$_______Total$________TOTAL OF ALT. 1:TOTAL OF BASE BID + ALT. 1:ALTERNATE 2$__________________$__________________BID FORM - UNIT PRICE00311-312/12Item EstNo. Qty1. 10UnitDescriptionEA Replace TreesUnitPrice$_______Total$________TOTAL OF ALT. 2:$__________________TOTAL OF BASE BID + ALT. 1 +2:$__________________Item EstNo. Qty1. 1362.43.1ALTERNATE 3UnitUnitDescriptionPriceRehab Gravity Sewer by Pipe burstingLF with 8" HDPE or by Open Cut Methodwith 8” DR18 for the Main line$_______EAReconnect Sewer Service to RehabbedMain Sewer line$_______LS Bypass Pumping$_______Total$________$________$________TOTAL OF ALT. 3:$__________________TOTAL OF BASE BID + ALT. 1 +2+3:$__________________The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead,profit, insurance, taxes, etc., to cover the finished work of the several kinds called for.The Bidder declares that he understands that the quantities shown in the Proposal are subjectto adjustment by either increase or decrease and that should the quantities of any of the itemsof the work be increased, the undersigned proposed to do the additional work at the unit pricesstated herein, and should the quantities be decreased, he also understands that payment will bemade on actual quantities at the unit price bid, and will make no claim for anticipated profits forany decrease in the quantities and that actual quantities will be determined upon completion ofthe work, at which time adjustment will be made to the contract amount by direct increase ordecrease.The Bidder also understands that it is his/her responsibility to account for the value of any omitteditems that may be necessary to complete the work. The value of such items shall be includedin the price bid for the most applicable item.It is the Owner’s intention to award the project as a single contract to the low bidder based onthe Total Base Bid plus Alternates 1, 2, & 3. However, if bid prices exceed the available funds,the Owner will have the choice to remove any Alternates until the total project cost is within theavailable funds. The bid will be awarded to the low bidder with the lowest base bid and anyalternates selected.BID FORM - UNIT PRICE00311-412/12
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Snow Hill Water Project (Divi...
Project Name: Snow Hill Water Project (Division 2 - Tank) Agency/Owner: Town of
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
HopeHealth Medical Plaza Door...
Project Name: HopeHealth Medical Plaza Door Installation Project Agency/Owner: HopeHealth Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026