RFP - Grinder Pump System Installation for Half Bath Connection
Project Information
- Bid Title
- RFP - Grinder Pump System Installation for Half Bath Connection
- Issuing Agency
- City of Independence
- Location
- Kansas
- Published Date
- Feb 6, 2026
- Closing Date
- Mar 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFP - Grinder Pump System Installation for Half Bath Connection
Category: Park/Zoo/Cemetery Status: Open Description: The City of Independence, Kansas (the “City”), is requesting proposals from qualified and licensed contractors for the design, furnishing, and installation of a sewer grinder pump system to serve a half bath restroom facility. The system will convey wastewater approximately 100 yards to an existing municipal sewer main located uphill from the structure. Location is the Garden House, at Riverside Park and the sewer main is located by the main restroom in the playground to the East of the Garden House.
Publication Date/Time: 2/6/2026 8:00 AM Closing Date/Time: 3/27/2026 12:00 PM Contact Person: Scott Patton 620.205.7527
scottp@independenceks.govMiscellaneous: A site visit is required prior to proposal submission. Please coordinate a time with Scott Patton by calling 620.205.7527 or scottp@independenceks.gov. Proposals shall be submitted electronically or in hard copy as follows:
Electronic: davids@independenceks.gov
Hard copy: City of Independence – 120 N. 6th – Independence, Ks. 67301 – Attn: Garden House
Related Documents: - Attachment Preview
-
“Delivering Excellence”Office of the Assistant City Manager120 North 6th StreetIndependence, KS 67301REQUEST FOR PROPOSALSGrinder Pump System Installation for Half BathConnectionGarden HouseRiverside ParkINDEPENDENCE, KS. 67301Posted on Website:www.independence.gov/bidsFebruary 6, 2026RESPONSE DUE: Prior to 12 PM, March 27, 2026Office of City ClerkRFP – Garden House Grinder Pump120 N. 6th StreetIndependence, Ks. 67301“Delivering Excellence”Office of the Assistant City Manager120 North 6th StreetIndependence, KS 67301Introduction: The City of Independence, Kansas (the “City”), is requesting proposalsfrom qualified and licensed contractors for the design, furnishing, and installation of asewer grinder pump system to serve a half bath restroom facility. The system will conveywastewater approximately 100 yards to an existing municipal sewer main located uphillfrom the structure. Location is the Garden House, at Riverside Park and the sewer main islocated by the main restroom in the playground to the East of the Garden House.Project Overview:The project consists of installing a complete grinder pump system capable of serving a halfbath (toilet and sink), including but not limited to the pump basin, grinder pump, dischargepiping, electrical connections, controls, and all associated appurtenances necessary for afully operational system.Key project characteristics include: - Waste source: Half bath (toilet and lavatory sink) - Approxi-mate discharge distance: 100 yards - Topography: Uphill/incline to sewer main - Connectionpoint: Existing municipal sewer mainScope of Work:The selected contractor shall provide all labor, materials, equipment, and permits requiredto complete the project, including:1. Site evaluation and verification of existing conditions2. Design and sizing of an appropriate grinder pump system3. Furnishing and installation of grinder pump basin and pump4. Installation of force main piping from the pump to the sewer main5. Electrical service, controls, and alarm system (audible and/or visual)6. Connection to the existing sewer main in accordance with City standards7. Restoration of disturbed areas8. Startup, testing, and commissioning of the system9. Provision of as-built drawings and system documentation10. Training for City staff or owner, if applicableOffice of the Assistant City Manager120 North 6th StreetIndependence, KS 67301“Delivering Excellence”Technical RequirementsProposed systems shall meet or exceed the following minimum requirements. Final sizingshall be based on the proposer’s calculations and site-verified conditions. City of Inde-pendence is under the 2018 Uniform Plumbing Code.Design Basis (Minimum)• Fixture load: one (1) water closet and one (1) lavatory (half bath).• Estimated wastewater profile: intermittent, low-volume domestic sewage.• Horizontal discharge distance: approximately 100 yards (≈300 linear feet) frompump basin to connection point.• Static lift: uphill to municipal main (proposer shall field-verify vertical rise and in-clude in TDH).Pump Performance Requirements• Package grinder pump system rated for residential/light commercial pressuresewer service.• Minimum motor: 1 HP (higher HP acceptable if required by calculated TDH).• Grinder pump shall be capable of handling raw domestic sewage and solids associ-ated with a toilet and lavatory.• The grinder pump and controls shall be capable of delivering, at a minimum:o 25 gpm at the calculated Total Dynamic Head (TDH); ando 10 gpm at TDH + 10 ft (design margin) or as otherwise justified by the pro-poser.• Proposer shall submit the following as part of the proposal:o Pump curve clearly identifying the operating point;o TDH calculation including static lift, friction losses, and minor losses;o Assumed duty cycle and estimated run time per event.Note: For installations of this nature, TDH commonly ranges between 40–90 feet, depend-ing on vertical rise and pipe diameter. Proposers shall field-verify all assumptions.Force Main (Discharge Piping) Requirements• Provide a dedicated pressurized force main from the pump basin to the municipalsewer main.• Nominal pipe size:o Preferred minimum: 1.5-inch pressure-rated pipe;Office of the Assistant City Manager120 North 6th StreetIndependence, KS 67301“Delivering Excellence”o 2-inch pipe acceptable if proposer demonstrates adequate scouring velocityat operating flow rates.• Force main shall be designed to maintain a target velocity of 2–8 ft/s during pumpoperation.• Acceptable materials include:o HDPE pressure pipe (e.g., SDR11/DR11) with heat-fused joints; oro PVC pressure pipe (e.g., C900/C905 as applicable) with restrained joints.• Provide bedding and backfill suitable for pressure piping and frost protection per lo-cal practice.• Install continuous tracer wire and detectable marking tape along the full length ofall non-metallic force main piping.• Piping installed at a depth of 24” minimum.Valves, Appurtenances, and ControlsThe grinder pump system shall include the following minimum appurtenances:• Check valve installed on the discharge line to prevent backflow.• Isolation (shutoff) valve installed downstream of the check valve to allow mainte-nance.• Quick disconnects and/or unions to allow removal of the grinder pump without ex-cavation.• High-water alarm with local audible and visual indication.• Pump failure alarm (may be combined with high-water alarm).• Alarm devices shall be mounted in a readily visible and accessible location.• Optional remote/telemetry alarm systems may be proposed as an alternate.Electrical Requirements• Provide a dedicated electrical circuit for the grinder pump system.• Electrical installation shall comply with the National Electrical Code (NEC) and allapplicable local requirements.• Provide a lockable disconnect means and weatherproof control panel/enclosure asrequired.• All electrical work shall be performed by a licensed electrician.Sewer Main Connection• Will be completed by the City of Independence, contractor responsible for exposingthe main and backfilling per City Standards.Office of the Assistant City Manager120 North 6th StreetIndependence, KS 67301“Delivering Excellence”Contractor QualificationsProposers shall demonstrate:• Experience with grinder pump installations of similar scope• Proper licensing and insurance in the State of Kansas• At least three (3) references for comparable projects completed within the last fiveyears• Bid and performance bond for 100% of the contracted amountProposal RequirementsProposals shall include, at a minimum:1. Company information and primary contact2. Description of proposed grinder pump system (manufacturer, model, specifica-tions)3. Narrative describing approach and methodology4. Project schedule and estimated duration5. Lump-sum cost proposal with itemized breakdown6. Warranty information for equipment and workmanship7. Proof of insurance and licensing8. ReferencesEvaluation CriteriaProposals will be evaluated based on the following criteria:• Technical approach and system suitability• Contractor experience and qualifications• Cost• Schedule• ReferencesThe City reserves the right to reject any or all proposals.Schedule• RFP Issuance Date: February 6, 2026• Questions Due: March 13, 2026• Proposal Due Date: March 27, 2026
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.