26-22-SD IFB Spotsylvania County Fire Station 12 - Addendum 2
Project Information
- Bid Title
- 26-22-SD IFB Spotsylvania County Fire Station 12 - Addendum 2
- Issuing Agency
- County of Spotsylvania
- Location
- Virginia
- Published Date
- Jan 28, 2026
- Closing Date
- Feb 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- 26-22-SD IFB Spotsylvania County Fire Station 12 - Addendum 2
- Attachment Preview
-
Finance | Procurement Division8800 Courthouse Road | Spotsylvania, VA 22553Phone: 540-507-7599Addendum No. 2IFB No. 26-22-SDSpotsylvania County Fire Station 12January 28, 2026This Addendum is issued in accordance with the IFB Terms & Conditions and is intended to provideadditional information and clarification to Respondents.This Addendum consists of three (3) items which are listed below and is an integral part of the IFB towhich it is attached and is incorporated therein and made part thereof by this reference.Item 1 – Changes to IFB1.01 The Bid Due Date has been extended to February 17th, 2026 at 1:00 PM.1.02 REVISE IFB No.26-22-SD, § III, C. Bid Security, 2Said Bid security is given as a guarantee that the Bidder will enter into a Contract if awarded theWork and, in the case of refusal or failure to so enter into said Contract, the security shall bedeclared forfeited to the County. If no Contract has been awarded or the Bidder has not beennotified of the acceptance of their Bid, within ninety (90) days of the Bid opening, the Biddermay withdraw their Bid and request the return of their Bid security. If, at the County's request,the Bidder agrees to extend and maintain their Bid beyond the specified ninety (90) days, theirBid security will not be returned.1.03 REMOVE Attachment F to IFB 26-22-SD – Bid Form andREPLACE with Attachment F – Bid Form – REVISED, attached hereto as Attachment A.1.04 REMOVE Attachment B to IFB 26-22-SD – Owner-Contractor-Agreement Draft andREPLACE with Revised Owner-Contractor-Agreement, attached hereto as Attachment B.1.05 SPECIFICATIONSa. REPLACE specification section 01 10 00 SUMMARY in its entirety with the revised sectionincluded with this addendum (Attachment C).b. REPLACE specification section 01 21 00 ALLOWANCES in its entirety with the revisedsection included with this addendum (Attachment D).1.06 DRAWINGS (Attachment E)a. REPLACE sheet A101 with the revised sheet included with this addenduma. Corrected Master Equipment errorsAddendum 2IFB 26-22-SD | Page 1 of 4b. REPLACE sheet A601 with the revised sheet included with this addenduma. Added Mockup Wall detailsc. REPLACE sheet A821 with the revised sheet included with this addenduma. Switched passthrough locker door swingd. REPLACE sheet A900 with the revised sheet included with this addenduma. Added new door frame typee. REPLACE sheet CE124 with the revised sheet included with this addendum.a. Part of RFI responsef. REPLACE sheet CU101 with the revised sheet included with this addendum.a. Part of RFI responseg. REPLACE sheet ES302 with the revised sheet included with this addendum.a. General Notes updated – Matched with rest of set and project manualh. REPLACE sheet ET302 with the revised sheet included with this addendum.a. General Notes updated – Matched with rest of set and project manuali. REPLACE sheet E521 with the revised sheet included with this addenduma. Added Missing ATS-LS breakerj. REPLACE sheet M101B with the revised sheet included with this addenduma. Restroom transfer air changed to supply airk. REPLACE sheet ME801 with the revised sheet included with this addenduma. Updated VAV Box Schedule due to new restroom air supplyl. REPLACE sheet P801 with the revised sheet included with this addenduma. Plumbing Fixture Schedule updated for faucet to meet LEED requirementsItem 2 – Clarifications2.01 An Owner’s Trailer will not be required; Contractor shall provide and maintain a temporarytrailer per specification 01 50 00.2.02 The generator and two (2) ATSs will be provided by the Owner. One (1) ATS related to the firepump controller is included in the Contract scope and shall be furnished and installed by theContractor.2.03 Quantities shown on the drawings are approximate and are provided for reference only. TheOwner makes no representation as to their accuracy. Bidders shall review the drawings and verifyquantities as necessary to prepare their bids.2.04 Fees assessed by Rappahannock Electric Cooperative for utility coordination or serviceconnections related to this project shall be paid directly by the Owner.Item 3 – Q&A3.01 Regarding IFB No.26-22-SD, § III, C. Bid Security, 2 - We are requesting that the 180-day BidBond Guarantee requirement be revised to the industry standard 30-60 calendar days. Holdingpricing firm for six months is challenging in the current construction market due to materialvolatility and subcontractor/supplier quote limitations of 30-days or less. Maintaining a 180-dayrequirement will increase the cost across all trades and decrease competition.ANSWER: Please refer to Item 1, 1.01 of this Addendum.3.02 a) Has there been an asbestos study performed on the existing dwelling to be removed?ANSWER: No.Addendum 2IFB 26-22-SD | Page 2 of 4b) If not, is the County planning to conduct this study and have any asbestos removed prior to thecontract demo of the building?ANSWER: An asbestos study has not been completed. The owner has included an allowancefor testing and abatement of materials if required.3.03 Can the engineer provide the intended limits along the dam of the Clay core that is shown on thepipe profile?ANSWER: See the attached CE124 with the clay core boundary in red.3.04 Sheets CU 101 differs from sheets CU203 regarding hydrants, tees and other waterline items.Which sheet should be used for bidding purposes.ANSWER: The design team has reviewed Sheets CU-101 and CU-203 and did not identify anyconflicts or discrepancies related to hydrants, tees, or other waterline appurtenances. All fittingsappear to be shown in the correct locations and sizes.If the bidder believes a specific contradiction exists between the sheets, please identify the exactitem(s) and location(s) for further review.3.05 Should the contract use the structure heights for Sanitary Structures shown on the profile versusthose listed on sheet CU 101?ANSWER: The sanitary structure heights shown on Sheet CU-101 shall be used for biddingpurposes. The table previously referenced contained outdated information and has been revised.A revised Sheet CU-101 is attached hereto and supersedes the prior version. All bids shall bebased on the revised Sheet CU-101.3.06 What is the duration of this project?ANSWER: Please refer to the revised Owner-Contractor-Agreement, attached hereto asAttachment B.3.07 Are there liquidated damages associated with this project?ANSWER: Yes. Liquidated damages apply to this project. Please refer to the revised Owner-Contractor-Agreement, attached hereto as Attachment B.3.08 Contractors receive pricing from subcontractors up until the bid submission deadline; therefore,can Attachment G | Subcontractor Identification Form be submitted 48 business hours after bidsubmission?ANSWER: Attachment G of the Invitation for Bid shall be removed in its entirety. Seeattachment A Section 4.18 Subcontractors and Supplies for contractual requirements.ATTACHMENTS:a. Addendum Attachment A – IFB Attachment F – Bid Form – REVISEDb. Addendum Attachment B – IFB Attachment B – Owner-Contractor-Agreement Draft - REVISEDc. Addendum Attachment C – Revised Section 01 10 00 SUMMARYd. Addendum Attachment D – Revised Section 01 21 00 ALLOWANCEe. Addendum Attachment E – Revised Drawingsf. Addendum Attachment F – Pre-Bid Attendance LogAddendum 2IFB 26-22-SD | Page 3 of 4Respondents shall acknowledge receipt of this Addendum with Bid submission.Vendor NameDateSignatureTitleAddendum 2IFB 26-22-SD | Page 4 of 4Addendum 2 – Attachment AFinance | Procurement Division8800 Courthouse Road | Spotsylvania, VA 22553Phone: 540-507-7599Attachment FBid Form - REVISEDPROJECT NAME: Spotsylvania County Fire Station 12IFB NUMBER: 26-22-SDFROM:TOTAL BID PRICEThe Bidder agrees, if awarded the Contract, to execute the Construction of Spotsylvania County FireStation 12 as shown in the construction documents and plans titled “Spotsylvania County Fire Station12” for the lump sum amount of:A. Base Bid$B. Asbestos Study Allowance$C. Direct Capture Vehicle Exhaust System Allowance $30,000.00150,000.00Total Lump Sum Amount (A&B)$Attachment F-revisedIFB 26-22-SD | Page 1 of 2
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026 - Ewing Mountain GNA Mec...
2026 - Ewing Mountain GNA Mechanical Site Prep Rep... Status: Open QQ 122834
State Government of Virginia
Bid Due: 7/15/2026
FY24 SGR Resurfacing Capitol ...
Bid Number: IFB (SEALED) 01 4101 27 Bid Title: FY24 SGR Resurfacing Capitol
City of Williamsburg
Bid Due: 8/25/2026