WD25004 Request for Proposal Professional Services for ADA Curb Ramp Installation, Project No. WD25004
Project Information
- Bid Title
- WD25004 Request for Proposal Professional Services for ADA Curb Ramp Installation, Project No. WD25004
- Issuing Agency
- City of Stockton
- Location
- California
- Published Date
- Mar 19, 2026
- Closing Date
- Mar 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- WD25004
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
General Information Due Date: Wednesday, March 25, 2025 Opening Time: 3:00 p.m. Published Date: Tuesday, March 3, 2026 Last Updated: Tuesday, March 18, 2026 Bid Orientation: N/A Description: REQUEST FOR PROPOSALS - ADA CURB RAMP INSTALLATION, PROJECT NO. WD25004
The City of Stockton Public Works Department is seeking proposals to provide professional design services to prepare plans, specifications, and estimates.Award Date: Related Links Description: URL: Insurance Requirements link Local Business Preference link Local Employment Ordinance link Prevailing Wages (2025-26) link Contacts Role: Name: Phone: Email: Project Manager Cesar Lopez-Garcia (209) 937-8346 Cesar.Lopez-Garcia@stocktonca.gov Plan Holder's List Katrina Tavares (209) 937-8676 Katrina.Tavares@stocktonca.gov Questions & Answers UPDATED 3/18/2026 Document: Questions and Answers Submittals Document: Plan Holder's List Document: Notice Document: Document: Request for Proposals Specifications Document: Plans, Attachments & Agendas Document: Attachment A - Project Map Document: Attachment B - Locations List Document: Attachment C - Instructions to Proposers Document: Attachment D - Acknowledgement of Monument Preservation Document: Attachment E - Evaluation Scoring Sheet
Last Update :
- Attachment Preview
-
DATED: MARCH 18, 2026QUESTIONS - ANSWERS - CLARIFICATIONSCITY OF STOCKTONADA CURB RAMP INSTALLATION PROJECTCITY PROJECT NO.: WD25004DEADLINES FOR QUESTIONS: March 16, 2026, 2:00 p.m.1. How should existing DICBs located in the gutter pan at the midpoint of curb returns beaddressed at the various locations where they occur? We recognize that leaving themwould be an ADA compliance issue in most of the locations and/or require a special dual-ramp curb return?Answer: Consultants will have to design around existing catch basins as they will not berelocated as part of this project. If there is an existing catch basin in the midpoint of thecurb, a dual modified ramp may have to be installed.2. Through our review, we’ve identified a few locations where utility poles will likely fallwithin the limits of the standard curb ramp. Are consultants expected to design aroundthem, or is it the City’s preference to coordinate with utility companies for relocation? Ifpoles are to remain in their current location, how much variance to Standard Plans R-65& R-66 will be allowed to design around the pole locations?Answer: Consultants will have to design around existing utility poles. For theselocations, a dual modified ramp may have to be installed.3. Can the City please share what is the limit of sidewalk removal beyond BCR/ECR toallow for ADA compliant transition? Existing sidewalk cross slope may not be compliantfor a significant distance?Answer: The limit of sidewalk removal beyond the BCR/ECR will vary depending on theexisting conditions.4. Are consultants expected to consider crosswalk cross slope in determining limit ofpavement removal for compliant transitions?Answer: Yes5. What is limit of asphalt pavement removal beyond that required to construct the ramps?Answer: The limit of asphalt pavement removal is 2’ minimum, additional asphalt mayneed to be removed depending on existing conditions.6. Can the City please confirm that all design/construction shall be within the existing R/W?Answer: Yes, all ramps should be designed and constructed within existing R/W.City of StocktonPublic Works DepartmentPage 1 of 1DATED: MARCH 18, 20267. Page 10 of 12 in the RFP, section 6.8 “Project Work Matrix” states a lot of similarlanguage to what is being requested in the separate sealed Cost Proposal. For this section,can consultants prepare a project matrix of just key staff and the expected hours per task,without the financial details going into the separate sealed cost proposal?Answer: Yes, for the project matrix only include breakdown of tasks, key staff, andexpected hours per task. The cost proposal should be submitted in a separate sealedenvelope.City of StocktonPublic Works DepartmentPage 2 of 1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541990All Other Professional, Scientific, and Technical Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RDC0015913 - East Los Angeles...
Project Summary Project ID: RDC0015913 Federal No: None Project Name: East Los Angeles
La County
Bid Due: 7/14/2026
Villa Park High School Field ...
INVITATION TYPE & NO.: BID 2526-979 DESCRIPTION: Villa Park High School Field Renovation
Orange Unified School District
Bid Due: 7/07/2026