WD25004 Request for Proposal Professional Services for ADA Curb Ramp Installation, Project No. WD25004

Project Information

Bid Title
WD25004 Request for Proposal Professional Services for ADA Curb Ramp Installation, Project No. WD25004
Issuing Agency
City of Stockton
Location
California
Published Date
Mar 19, 2026
Closing Date
Mar 25, 2026
Government Level
State & Local
Status
Closed
Ref. #
WD25004
Original Source
Join to Access Full Details
Project Description
General Information
Due Date: Wednesday, March 25, 2025
Opening Time: 3:00 p.m.
Published Date: Tuesday, March 3, 2026
Last Updated: Tuesday, March 18, 2026
Bid Orientation: N/A
Description:

REQUEST FOR PROPOSALS - ADA CURB RAMP INSTALLATION, PROJECT NO. WD25004
The City of Stockton Public Works Department is seeking proposals to provide professional design services to prepare plans, specifications, and estimates.

Award Date:
Related Links
Description: URL:
Insurance Requirements link
Local Business Preference link
Local Employment Ordinance link
Prevailing Wages (2025-26) link
Contacts
Role: Name: Phone: Email:
Project Manager Cesar Lopez-Garcia (209) 937-8346 Cesar.Lopez-Garcia@stocktonca.gov
Plan Holder's List Katrina Tavares (209) 937-8676 Katrina.Tavares@stocktonca.gov
Questions & Answers UPDATED 3/18/2026
Document: Questions and Answers
Submittals
Document:
Plan Holder's List
Document:
Notice
Document:
Document: Request for Proposals
Specifications
Document:
Plans, Attachments & Agendas
Document: Attachment A - Project Map
Document: Attachment B - Locations List
Document: Attachment C - Instructions to Proposers
Document: Attachment D - Acknowledgement of Monument Preservation
Document: Attachment E - Evaluation Scoring Sheet

Last Update :
Attachment Preview
DATED: MARCH 18, 2026
QUESTIONS - ANSWERS - CLARIFICATIONS
CITY OF STOCKTON
ADA CURB RAMP INSTALLATION PROJECT
CITY PROJECT NO.: WD25004
DEADLINES FOR QUESTIONS: March 16, 2026, 2:00 p.m.
1. How should existing DICBs located in the gutter pan at the midpoint of curb returns be
addressed at the various locations where they occur? We recognize that leaving them
would be an ADA compliance issue in most of the locations and/or require a special dual-
ramp curb return?
Answer: Consultants will have to design around existing catch basins as they will not be
relocated as part of this project. If there is an existing catch basin in the midpoint of the
curb, a dual modified ramp may have to be installed.
2. Through our review, we’ve identified a few locations where utility poles will likely fall
within the limits of the standard curb ramp. Are consultants expected to design around
them, or is it the City’s preference to coordinate with utility companies for relocation? If
poles are to remain in their current location, how much variance to Standard Plans R-65
& R-66 will be allowed to design around the pole locations?
Answer: Consultants will have to design around existing utility poles. For these
locations, a dual modified ramp may have to be installed.
3. Can the City please share what is the limit of sidewalk removal beyond BCR/ECR to
allow for ADA compliant transition? Existing sidewalk cross slope may not be compliant
for a significant distance?
Answer: The limit of sidewalk removal beyond the BCR/ECR will vary depending on the
existing conditions.
4. Are consultants expected to consider crosswalk cross slope in determining limit of
pavement removal for compliant transitions?
Answer: Yes
5. What is limit of asphalt pavement removal beyond that required to construct the ramps?
Answer: The limit of asphalt pavement removal is 2’ minimum, additional asphalt may
need to be removed depending on existing conditions.
6. Can the City please confirm that all design/construction shall be within the existing R/W?
Answer: Yes, all ramps should be designed and constructed within existing R/W.
City of Stockton
Public Works Department
Page 1 of 1
DATED: MARCH 18, 2026
7. Page 10 of 12 in the RFP, section 6.8 “Project Work Matrix” states a lot of similar
language to what is being requested in the separate sealed Cost Proposal. For this section,
can consultants prepare a project matrix of just key staff and the expected hours per task,
without the financial details going into the separate sealed cost proposal?
Answer: Yes, for the project matrix only include breakdown of tasks, key staff, and
expected hours per task. The cost proposal should be submitted in a separate sealed
envelope.
City of Stockton
Public Works Department
Page 2 of 1
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 237310Highway, Street, and Bridge Construction
  • NAICS 238990All Other Specialty Trade Contractors
  • NAICS 541330Engineering Services
  • NAICS 541611Administrative Management and General Management Consulting Services
  • NAICS 541990All Other Professional, Scientific, and Technical Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RDC0015913 - East Los Angeles...

Project Summary Project ID: RDC0015913 Federal No: None Project Name: East Los Angeles

La County

Bid Due: 7/14/2026

Villa Park High School Field ...

INVITATION TYPE & NO.: BID 2526-979 DESCRIPTION: Villa Park High School Field Renovation

Orange Unified School District

Bid Due: 7/07/2026