Hopkins SCR Catalyst Replacement
Project Information
- Bid Title
- Hopkins SCR Catalyst Replacement
- Issuing Agency
- City of Tallahassee
- Location
- Florida
- Published Date
- Jul 2, 2025
- Closing Date
- Jul 28, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IFB-088-25-RM
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: Hopkins SCR Catalyst ReplacementRef. #: IFB-088-25-RMDepartment: ENERGY SERVICES - ELECTRIC & GASType: IFBStatus:OpenOpen Date: Jul 2nd 2025, 5:00 PM EDTQuestions Due Date: Jul 18th 2025, 5:00 PM EDTClose Date: Jul 28th 2025, 2:30 PM EDT
Project Description: The City of Tallahassee owns and operates seven (7) Wartsila reciprocating engines, each equipped with its own emissions control system. Over time, the catalyst bricks within these systems degrade and require replacement. This request for bids is for the removal and installation of catalyst bricks for the Hopkins Generating Station and Substation 12 reciprocating engines.
Hopkins Generating Station operates five (5) Wartsila 18V50SG reciprocating engines, each with its own emissions system reactor vessel. Each reactor contains four (4) rows of catalyst bricks:
• Two (2) rows of NOx catalysts
• One (1) row of ROM catalysts
• One (1) row of oxidation catalysts
Substation 12 operates two (2) Wartsila 20V34SG reciprocating engines, also each with its own emissions system reactor vessel. These reactors also contain four (4) rows of catalyst bricks with the same configuration:
• Two (2) rows of NOx catalysts
• One (1) row of ROM catalysts
• One (1) row of oxidation catalysts
It is anticipated that catalyst brick replacement will be performed annually on one or more of the engines at either Hopkins Generating Station and/or Substation 12.
It is not the Owner's intent to specify all applicable codes and technical requirements related to the removal and installation of emissions control system catalyst bricks. Nor does this request attempt to define all requirements governed by existing codes and standards. The Bidder is responsible for providing a high-quality product that meets or exceeds all relevant codes and standards. The omission or deficiency of any item in this specification does not relieve the Bidder of that responsibility.
Mandatory Pre-Bid and Site Visit: July 15, 2025 @ 10:00AM Location
Hopkins Generating Station is in Leon County, Florida, approximately 7 miles west of Tallahassee on County Route 1585 (1125 Geddie Road, Tallahassee, FL 32304).
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
LOCKS / PARTS / ACCESSORIES, ...
Description: LOCKS / PARTS / ACCESSORIES, ACCESS CONTROL, OEM, PURCHASE A Department: Purchasing
Palm Beach County
Bid Due: 9/26/2029
LOCKS / PARTS / ACCESSORIES, ...
Description: LOCKS / PARTS / ACCESSORIES, ACCESS CONTROL, OEM, PURCHASE A Department: Purchasing
Palm Beach County
Bid Due: 6/02/2030