RFP: Clean Out of Airport Oil Water Separators
Project Information
- Bid Title
- RFP: Clean Out of Airport Oil Water Separators
- Issuing Agency
- Birmingham Airport Authority
- Location
- Alabama
- Published Date
- Dec 2, 2025
- Closing Date
- Jan 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFP: Clean Out of Airport Oil Water Separators (12/02/2025)
- Attachment Preview
-
Request for Proposal (RFP)Clean Out of Airport Oil Water Separators06081240.2Birmingham Airport AuthorityClosing Date06053205.4I. IntroductionA. Project DescriptionThe Birmingham Airport Authority (“BAA” or “Authority”) is requesting proposals (RFP)for cleaning out four (4) oil water separators at the Birmingham ShuttleworthInternational Airport.The goal of this procurement effort is to enter into a contract with the best-valuedContractor to clean out four (4) oil water separators as described in this RFP.B. Proposed Scope of WorkPerform a full assessment, cleaning and lawful disposal of solids and liquids from fouroil/water separators (2 spill-control type, 2 conventional). Provide full documentation,photographs, waste manifests, and a written step-by-step procedure for each separatorcleaned. All work will be performed in accordance with Alabama Department ofEnvironmental Management (ADEM) regulations for used oil, hazardous/solid waste,and manifest requirement. Make sure each oil/water separator is retuned back tonormal operation.1. Onsite assessment (initial site visit)o Visual inspection of each separator: type, access, inlet/outlet piping, sampleports, filter pack configuration, sludge/float depth, trap/flowmeter, andnearby drainage points.o Collect field observations and representative liquid/solid grab samples (see“Waste classification & sampling” below).o Photograph each unit and note GPS / asset ID.o Produce a written assessment that categorizes each separator condition asHigh / Moderate / Low priority for cleaning and repairs.2. Preparation for cleaningo Lay out containment (secondary containment berms, drip pans,absorbents).o Provide traffic control and signage if units are adjacent to roadways oroperations.o Establish decontamination and washdown collection points.o Lockout/tagout and confined space procedures as required.3. Cleaning & solids removal (per separator)06081240.22o Isolate the separator and remove free oils and liquids by vacuum truck orappropriate pump.o Remove accumulated float (oil) and settled solids/sludge using vac servicesand manual scraping if needed.o Remove and bag filter packs/media for characterization and replacementwhere required.o Conduct low-pressure washdown only after solids & free oil are removed;collect wash water to contained sums for treatment or transport.o If needed, conduct an internal inspection and document internal structures,baffles and invert elevations.4. Filter pack replacemento Replace filter packs/media as required (OEM or equivalent media).Used/soiled media will be containerized and characterized for disposal.5. Waste handling, characterization & disposalo Field screening (visual, odor, PID if available) and lab analysis onrepresentative samples to determine if waste is hazardous or non-hazardous used oil / solid waste. ADEM requires used oil sent for disposalto be evaluated for hazardous characteristics. ADEM+1o Generate chain-of-custody and lab reports. If waste is hazardous, handle perAlabama hazardous waste regulations and manifesting rules; if non-hazardous but not recyclable, handle per ADEM used oil/solid wastedisposal standards. Legal Information Institute+1o The airport will need documentation of disposal and receipt of disposal.o Provide required manifests (EPA Uniform Hazardous Waste Manifest ortransporter documentation) and submit copies to ADEM when required.ADEMo Document final legal off airport disposition: facility name, EPA ID (ifapplicable), dates, quantities, and transporters. Provide receipts anddisposal certificates.Please note, drawings of structural information are very limited.06081240.23C. Term of AgreementThe term of the agreement resulting from this solicitation is three (3) months.General Conditionsi. Terms and Conditions: Contractor agrees to abide by all the terms and conditionscontained in this RFP. Any exceptions to the requirements of this RFP, or the BAA’sterms and conditions of this RFP, shall be noted in writing, with detailed explanation,and included with the RFP submittal. The Contractor acknowledges that takingexceptions to this RFP may subject the response submittal to be rejected.ii. Discussions and Questions: All questions must be submitted in writing and directedto the Birmingham Airport Authority (BAA) Purchasing Department ateseoane@flybhm.com in order to be considered. The Contractor shall not attempt todiscuss any aspects of the request with any other party except for the email addressdescribed in this RFP. No verbal agreements will be considered during the proposalprocess. BAA reserves the right to reject the proposal of any Contractor violating thisprovision.iii. Completeness: All requested information and required forms must be completed,signed, and submitted with this document to constitute a proper proposal. The entire06081240.24package must be complete with all required forms, signature, and information. Failureto complete or comply with any part of the specifications or requirements in this RFPmay constitute a basis of rejection. It is within the right of the BAA to reject any RFPsubmittal in this solicitation document.iv. Errors: Contractors or their authorized representatives are expected to fully informthemselves as to the conditions, requirements, and specifications before submittingproposals. Contractors are cautioned not to obliterate, erase, or strike‐over anyprinted material as set forth in this RFP. In quoting prices, wherever Contractor hasmade an error and has corrected, all such corrections should be initialed by the personsigning this RFP. If errors occur in the extension of prices in the RFP, the unit pricesshall govern. Failure to comply with this provision may result in rejection ofContractor’s submittal. All documents submitted must be legible.v. Changes/Modifications: No changes or modifications shall be made to any BAA formswithout the approval of the BAA. If changes or modifications are made without theapproval of BAA, the proposal submitted by the Contractor may be rejected.vi. Compliance with Laws: The Contractor shall obtain and maintain all licenses,permits, liability insurance, and workman’s compensation insurance, and maintaincompliance with any other federal, state, or local requirements during the term of thecontract with BAA and in submitting a proposal.vii. Specifications: Whenever mention is made of any article, material, or workmanshipto be in accordance with any laws, ordinances, codes, regulations, etc., theserequirements shall be construed to be the minimum requirements of thesespecifications.viii. Quality: All materials used for the manufacture or construction of any supplies,materials, equipment, or service shall be new unless otherwise specified. All materialsshall be of the best quality, and to the highest grade of workmanship that meet thespecifications in this document. Materials or service must comply with all applicableFederal, State, or OSHA requirements.ix. Acceptance of Material: The materials delivered shall remain the property of theContractor pending physical inspection and acceptance to the satisfaction of theBAA. In the event the material supplied to BAA is found to be defective or does notconform to specifications, the BAA reserves the right to cancel the order upon writtennotice to the Contractor and return the product(s) to the Contractor at theContractor’s expense, and to invoke the provisions of the section titled “Default”.x. Default: Any contract made between BAA and the Contractor can be cancelled by theBAA in whole or in part via written notice, upon the Contractor’s non‐performance orviolation of contract terms. The Contractor will be given 15 days to rectify the non-performance or violation. An award may be made to the lowest quoting Contractorfor material or services specified, and purchases may be made on the openmarket. The defaulting Contractor shall be liable for costs to the BAA in excess of thedefaulted contract prices. The Contractor shall continue the performance of thecontract to the extent any part is not terminated under the provisions of this clause.xi. Termination of Agreement: In addition to any other rights and remedies allowed bylaw, BAA may terminate this Agreement at any time for any reason, or no reason, withor without cause, without penalty or expense to BAA of any kind whatsoever, by giving(15) days written notice to Contractor of such termination and specifying the effectivedate of the termination. Termination of this agreement as provided in section Xi shallrelease BAA from any further fees to be paid to contractor after the date of06081240.25
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 562211Hazardous Waste Treatment and Disposal
- NAICS 562910Remediation Services
- NAICS 562998All Other Miscellaneous Waste Management Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Brush/Shrub Clearing at Pelha...
Sourcing Project Number: SRC0000034393 Solicitation Label: Brush/Shrub Clearing at Pelham AFRC Status: Open
State Government of Alabama
Bid Due: 7/22/2026
FY26 Civil Air Patrol (CAP) M...
Follow FY26 Civil Air Patrol (CAP) Mold Remediation and Cleaning at Maxwell AFB,
DEPT OF DEFENSE
Bid Due: 7/14/2026