BID - Amended Notice for Sourdough WTP Interim Optimization
Project Information
- Bid Title
- BID - Amended Notice for Sourdough WTP Interim Optimization
- Issuing Agency
- City of Bozeman
- Location
- Montana
- Published Date
- Apr 5, 2025
- Closing Date
- Apr 10, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
BID - Amended Notice for Sourdough WTP Interim Optimization
- Department: Community%20Development%2C%20Water%20Conservation%2C%20Water%20And%20Sewer%2C%20Water%20Treatment%2C%20Stormwater%2C%20Water%20Reclamation%2C%20Building%2C%20Administration%2C%20Facilities%2C%20Engineering
- Category: Bids \ RFPs \ RFQs
- Start Date: 04/05/2025 6:00 AM
- Close Date: 04/10/2025 2:30 PM
ADVERTISEMENT FOR BIDS | Amended Notice
CITY OF BOZEMAN
BOZEMAN, MONTANA
SOURDOUGH WTP INTERIM OPTIMIZATION
General Construction
Sealed Bids for the construction of the Sourdough Water Treatment Plant Interim Optimization in Bozeman will be received by City of Bozeman (Owner), at the office of the City Clerk located at 121 N Rouse, Suite 202, Bozeman, MT 59771-1230 or mailed to P.O. Box 1230, Bozeman, MT 59771-1230 until April 10, 2025 at 2:30 PM local time. At that time the Bids received will publicly opened and read aloud.
Project Description:
The Project includes furnishing all labor, skill, equipment, and construction materials to improve safety, accessibility, operational efficiency, and process functionality at the Bozeman WTP. The scope includes:
- BID PACKAGE A: Fluoride Transfer Pump Spill Containment Improvements: Modifications to the fluoride transfer pump containment area to enhance operator accessibility, safety, and movement during maintenance. Work is defined in the Construction Drawings and Specifications.
- BID PACKAGE B: Membrane Backwash Recycle Improvements: Installing cross-connection process piping and valves to redirect backwash waste directly to the recycle lift station, bypassing the DAFT feed wet well. Work is defined in the Construction Drawings and Specifications.
- BID PACKAGE C: Pretreatment Basin Underflow Baffle Curb Modifications: Removing a concrete curb from underflow baffles to streamline sludge cleaning operations in the pretreatment basin. Work is defined in the Construction Drawings and Specifications.
- BID PACKAGE D: Headtower Recycle Flow Improvements: Improve discharge piping at the headtower to better integrate recycle flows with raw water streams, to improve reuse water capture and treatment. Work is defined in the Construction Drawings and Specifications.
Bids are requested for the following Contract:
- Contract No. 1 – General Construction
Owner anticipates that the Project’s total bid price will be approximately $204,999.00. Contractors will be given approximately 260 days to complete the project – the Contract Times can be found in the Agreement.
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541519Other Computer Related Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541690Other Scientific and Technical Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Product Development Support MSU MilTech is seeking to establish contracts for task-order-based support
State Government of Montana
Bid Due: 7/15/2026