UWVMC 2nd Floor Lab Analyzer Replacement Addendum 1
Project Information
- Bid Title
- UWVMC 2nd Floor Lab Analyzer Replacement Addendum 1
- Issuing Agency
- UCLA Capital Programs
- Location
- California
- Published Date
- Jan 13, 2026
- Closing Date
- Feb 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 40295-CP1573
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project Name UWVMC 2nd Floor Lab Analyzer Replacement Project Number 40295-CP1573 Project Description Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
UCLA has been assigned a waste load allocation (WLA) of “zero trash discharge” in its campus storm drains, as outlined by the National Pollutant Discharge Elimination System Phase II Municipal Separate Stormwater System (MS4) Permit, issued by the Los Angeles Regional Water Quality Control Board (LARWQCB). The proposed project would bring UCLA into compliance with these requirements. The zero-trash-discharge WLA requires the removal of trash greater than or equal to 5 millimeters in size from the campus stormwater conveyance system.
The project scope of work includes the demolition of (2) existing Vista chemistry analyzers and replacing them with (1) new Roche Cobas pro and (1) new Roche Cobas Pure Chemistry Analyzer in the existing operational Laboratory on the 2nd Floor of UCLA West Valley Medical Center. The University will furnish the (2) new Roche Cobas chemical analyzer equipment for Contractor to install. The improvements required include modifications to existing building electrical upgrades, plumbing and mechanical systems. One new above ceiling Fan Coil in the same Laboratory Space to be installed. The Contractor to refer to all architectural, structural, mechanical, plumbing and electrical construction documents to follow relocation sequence of equipment and required utilities so the Lab Staff has two operational analyzers at all times during the construction duration. The number of analyzers consists of the two existing Vista analyzers and two new Roche Cobas analyzers. Recent survey by a third party identifies (ACM) Asbestos Containing Material. Refer to attached Citadel EHS Survey for additional information. Contractor to include ACM abatement as part of the project scope.
TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOMEstimated Construction Cost $700,000.00 Ad for PQ Sub 942402.01 - Attachment Preview
- To access this preview, please sign up here.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Construct retaining wall, MGS...
Basic Information Title Construct retaining wall, MGS, cold plane & Pvmt widening. Agency
State Government of California
Bid Due: 9/02/2026
Follow Badger Hill Seed Orchard Well Active Contract Opportunity Notice ID 127EAW26Q0058 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/01/2026