Blaine Marine Industrial Area Boatyard
Project Information
- Bid Title
- Blaine Marine Industrial Area Boatyard
- Issuing Agency
- Port of Bellingham
- Location
- Washington
- Published Date
- Dec 5, 2025
- Closing Date
- Dec 23, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFPS 25-5
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFPS 25-5
Bid Title: Blaine Marine Industrial Area Boatyard
Category: Professional Services Status: Open Description: The Port of Bellingham (Port) is issuing this Request for Professional Services (RFPS) to solicit responses from qualified consulting firms with suitable expertise and experience in providing planning, design, permitting and bid document development services to develop an operational boatyard at the Blaine Marine Industrial Area. Location of the proposed boatyard is 218 McMillan Ave. Blaine WA 98230 accessible from Blaine on Marine Drive.
The Port of Bellingham reserves the right to reject any and all proposals submitted. The successful service provider will be contacted by the Port and will be required to execute the Port’s Standard Agreement for Professional Services without modification; a copy of the agreement is attached.
All RFPS submittals must be received at the Port administrative offices or email no later than 3:00pm on Tuesday, December 23, 2025. If deemed necessary, the Port will schedule interviews within one week of the deadline for submittal. Electronic submittals will be accepted in PDF format only and are preferred to hard copy. If mailing, please submit 3 hard copies and 1 digital. Submittals of less than or equal to 24 single-sided or 12 double-sided pages, including attachments, should be directed to:
Ben Howard
Port of Bellingham
PO Box 1677
Bellingham, WA 98227-1677
For security reasons, you must enable JavaScript to view this E-mail address.
All inquiries and requests for background material to this RFPS should be directed to Ben Howard at 360-676-2500 or For security reasons, you must enable JavaScript to view this E-mail address. .
Purpose and Scope Work
The subject property has been operated as a boatyard since approximately 1949 and has involved a number of operators under a lease with the Port. The property is awaiting a significant cleanup project in coordination with the Department of Ecology. Cleanup activities are anticipated in mid-2026 through mid-2027 and will include construction of a new bulkhead, contaminated sediment dredging and disposal, upland environmental capping, and construction of two travel lift piers (30-ton and 200-ton). Following the cleanup project, the Port will then immediately be redeveloping the boatyard. Anticipated redevelopment improvements following the cleanup will include site grading, utilities, stormwater infrastructure and treatment, washwater infrastructure and treatment, floats and gangways, and security. Additional boatyard improvements may also be identified as the operational plan is finalized.
The Port is seeking engineering and environmental services to plan, design, permit, and construct the proposed boatyard redevelopment. The project design will necessitate a civil, structural, and stormwater engineering components to integrate with the boatyard operational plan. The contract term for this work is anticipated to be initiated in January 2026 with design work completed by November 2026 and coordinated with the ongoing cleanup engineering and design. Consultant will be expected to evaluate and provide input on the operational plan developed by the Port for the proposed boatyard and site design. Consultant will factor in the City of Blaine Permitting process for Substantial Shoreline Development as well as Land Disturbance and Commercial Building Permitting. Consultant will factor in potential schedule constraints.
The consultant performing the work shall have exceptional knowledge and demonstrated experience with the following:
• Boatyard operations and operational layout
• Civil, structural, marine, and transportation engineering
• Geotechnical exploration and analysis
• Hydrology & hydraulics
• Permitting of similar projects at the local, state, and federal levels
• Construction planning, scheduling and phasing at an active Marina
• City of Blaine Development Guidelines and Improvement Standards, and the Blaine Municipal Code
• City of Blaine and Department of Ecology standards for stormwater management, per the most recently adopted version of the SWMMWW
• Department of Ecology Boatyard General Permit
Publication Date/Time: 12/5/2025 7:00 AM Publication Information: Bellingham Herald and OMWBE Closing Date/Time: 12/23/2025 3:00 PM Contact Person: Ben Howard, benh@portofbellingham.com Related Documents: - Attachment Preview
-
Port of BellinghamRequest for Professional ServicesBlaine Marine Industrial Area Boatyard ProjectThe Port of Bellingham (Port) is issuing this Request for Professional Services (RFPS) to solicit responsesfrom qualified consulting firms with suitable expertise and experience in providing planning, design,permitting and bid document development services to develop an operational boatyard at the Blaine MarineIndustrial Area. Location of the proposed boatyard is 218 McMillan Ave. Blaine WA 98230 accessible fromBlaine on Marine Drive.All RFPS submittals must be received at the Port administrative offices or email no later than 3:00pm onTuesday, December 23, 2025. If deemed necessary, the Port will schedule interviews within one week ofthe deadline for submittal. Electronic submittals will be accepted in PDF format only and are preferred tohard copy. If mailing, please submit 3 hard copies and 1 digital. Submittals of less than or equal to 24 single-sided or 12 double-sided pages, including attachments, should be directed to:Ben HowardPort of BellinghamPO Box 1677Bellingham, WA 98227-1677benh@portofbellingham.comAll inquiries and requests for background material to this RFPS should be directed to Ben Howard at 360-676-2500 or benh@portofbellingham.com.Purpose and Scope WorkThe subject property has been operated as a boatyard since approximately 1949 and has involved a numberof operators under a lease with the Port. The property is awaiting a significant cleanup project incoordination with the Department of Ecology. Cleanup activities are anticipated in mid-2026 through mid-2027 and will include construction of a new bulkhead, contaminated sediment dredging and disposal, uplandenvironmental capping, and construction of two travel lift piers (30-ton and 200-ton). Following the cleanupproject, the Port will then immediately be redeveloping the boatyard. Anticipated redevelopmentimprovements following the cleanup will include site grading, utilities, stormwater infrastructure andtreatment, washwater infrastructure and treatment, floats and gangways, and security. Additional boatyardimprovements may also be identified as the operational plan is finalized.The Port is seeking engineering and environmental services to plan, design, permit, and construct theproposed boatyard redevelopment. The project design will necessitate a civil, structural, and stormwaterengineering components to integrate with the boatyard operational plan. The contract term for this work isanticipated to be initiated in January 2026 with design work completed by November 2026 and coordinatedwith the ongoing cleanup engineering and design. Consultant will be expected to evaluate and provide inputon the operational plan developed by the Port for the proposed boatyard and site design. Consultant willfactor in the City of Blaine Permitting process for Substantial Shoreline Development as well as LandDisturbance and Commercial Building Permitting. Consultant will factor in potential schedule constraints.The Port of Bellingham reserves the right to reject any and all proposals submitted. The successful service provider willbe contacted by the Port and will be required to execute the Port’s Standard Agreement for Professional Serviceswithout modification; a copy of the agreement is attached.The consultant performing the work shall have exceptional knowledge and demonstrated experience with thefollowing:• Boatyard operations and operational layout• Civil, structural, marine, and transportation engineering• Geotechnical exploration and analysis• Hydrology & hydraulics• Permitting of similar projects at the local, state, and federal levels• Construction planning, scheduling and phasing at an active Marina• City of Blaine Development Guidelines and Improvement Standards, and the Blaine Municipal Code• City of Blaine and Department of Ecology standards for stormwater management, per the mostrecently adopted version of the SWMMWW• Department of Ecology Boatyard General PermitScoring and Firm SelectionResponses will be reviewed and scored by a project team consisting of Port staff. Review criteria responsesshould include a cover letter and address the following evaluation criteria which will be used to evaluate allfirms:1. Design Team Qualifications and Project Experience (40 points possible)a) Demonstrate relevant team expertise and satisfactory performance with marine haul-out boatyardrelating to operation, stormwater management, design, construction, and project management ofsimilar projects.b) Demonstrate expertise in permitting boat yard infrastructure and operational design and construction.c) With an emphasis on knowledge and capabilities, identify firm expertise that would help the overallperformance of the project and be directly beneficial to the Port.d) Professional background and responsibilities of proposed project team.e) Organizational chart of the firm team, demonstrating basic structure and responsibilities of each keymember.2. Project approach (35 points possible):a) Detailed narrative describing your proposed approach.b) Demonstrate familiarity with the project site by discussing potential operational and design risks,limitations and/or opportunities.c) Provide proposed project schedule.3. Demonstrated Capability to Perform Professional Services (25 points possible).a) List key assigned personnel, licensing, and professional background.b) Describe firm’s ability to independently manage project delivery with little oversight.c) Describe teams Quality Assurance/Quality Control process.d) Provide a brief description of representative projects managed and constructed by the firm’s teamwhich are similar in scale, type, and complexity and contact for reference.e) Team accessibility to site and Port staff.f) List references that would attest to the expertise of the company and assigned personnel.The Port of Bellingham reserves the right to reject any and all proposals submitted. The successful service provider willbe contacted by the Port and will be required to execute the Port’s Standard Agreement for Professional Serviceswithout modification; a copy of the agreement is attached.PORT OF BELLINGHAMAGREEMENT FOR PROFESSIONAL SERVICESThis AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) is made and entered into asof the later date of the signatures below, by and between:PORT OF BELLINGHAM1801 Roeder Ave.P.O. Box 1677Bellingham, WA 98227P: (360) 676-2500E:And(“Port”)[CONSULTANT]P:E:(“Consultant”)T I. SCOPE OF WORK. The Consultant’s Scope of Work is incorporated herein and attached as ExhibitA (the “Work”). In the event of a conflict between any provision of the Port’s General Provisions andF the attached Exhibit A, the Port’s General Provisions shall prevail.II. COMPENSATION. The Consultant shall be compensated on the basis set forth in Exhibit A. TheConsultant shall not adjust any compensation rates without written authorization from the Port.A This Agreement is limited to a total expenditure of $0.00.III. TERM. The term of this Agreement shall commence with the execution of this document and willR terminate when all tasks associated with the scope of Work herein, and as modified by writtenAmendment, have been completed by the Consultant on or before.This Agreement may be extended for multiple terms or reinstated at the sole discretion of the Port; ifD so extended, all of the terms and conditions herein shall apply to such extension.IV. GENERAL PROVISIONS. The Work covered by this Agreement shall be performed in accordancewith the General Provisions (which are attached hereto and form a part of this Agreement) and anyattachments or schedules.V. ENTIRE AGREEMENT. This Agreement supersedes all prior agreements and understandings andmay only be changed by written amendment executed by both parties.IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the later of the datesindicated below. By signing below, each signatory represents that they have authority on behalf of theirrespective party to enter into this agreement, which shall be binding upon the parties according to its terms.***Signatures on Subsequent Page***Professional Services AgreementPage 1 of 9CONSULTANTSignature:Name:Title:Date:PORT OF BELLINGHAMSignature:Name:Title:Date:DRAFTProfessional Services AgreementPage 2 of 9GENERAL PROVISIONSIn consideration of the mutual covenants, and other good and valuable consideration, thesufficiency of which is hereby acknowledged, the parties hereto agree as follows:1. SCOPE OF WORK. The objective of this Agreement, including, but not limited to, projectAgreement is the timely preparation, completion, budget status and a narrative progress descriptionand/or delivery of the scope of Work and/or of Work performed that is acceptable in form to thedeliverables described in the Exhibit A or any Port. All invoices submitted by Consultant to theamendments thereto.Port shall reference any applicable billing codesprovided by the Port to Consultant. Any applicable1.1 Work covered by this Agreement shall taxes shall be listed as separate line items on eachbe performed in accordance with the provisions Consultant invoice. All invoices and documentationherein and any attachments or schedules. Except may be reviewed and audited by the Port andas may be otherwise provided for herein, this payment may be subject to review or audit. SubjectAgreement may only be amended by the mutual to the preceding, payments shall be due net thirtyconsent of both parties hereto, in writing and signed (30) days of receipt of such invoice by that Port. Inby duly authorized representatives of both parties. no event shall the Port be charged interest onpayments due under this Agreement. If required by2. TERM OF AGREEMENT. The Consultantshall not begin Work under the Agreement until thePort has specifically authorized the Consultant todo so in writing. The time required for completionof all Work shall be specified in each Exhibit A.T The completion dates for the Work, or for phases ofthe Work, may be modified only upon writtenagreement of the parties hereto. The completiondates for the Work, or for phases of the Work, mayF be, but are not required to be, extended in the eventof a delay caused by Change Order Work, asdefined herein, requested by the Port, or if theA Consultant’s Work is delayed by unavoidablecircumstances beyond the control of the Consultantand which the Consultant could not reasonablyhave anticipated. This Agreement may beR extended for multiple terms at the sole discretion ofthe Port and subject to budget appropriations andCommission approval when required; if soD extended, all of the terms and conditions hereinthe Port, the Consultant shall provide periodicforecasts of its total fees and costs incurred to date.With regard to time and materials Work, only thereimbursable expenses specifically listed in theattached Exhibit A will be payable expenses underthis Agreement.3.2 If Exhibit A specifies that the Work is tobe performed on a fixed fee basis, the Consultantshall be paid the amount of the fixed fee asconsideration for full and satisfactory performanceof the Work regardless of the Consultant’s cost toperform the Work. The Port shall have soleauthority for determining when all Work has beensatisfactorily performed by the Consultant. Thefixed fee amount comprises all of the Consultant’spayment for the work and includes, withoutlimitation, all costs of salaries, overhead, non-salary expenses (including, but not limited to,travel, reproductions, telephone, supplies, and feesshall apply to such extensionof outside consultants), as well as the Consultant'sprofits. The Consultant’s payment for the Work3. COMPENSATION AND PAYMENT. Unless shall not exceed the specified amount unless firstExhibit A specifically establishes a fixed fee authorized by the Port in writing.payment, the Consultant shall be compensated onthe basis of hours worked and expenses incurred3.3 The Consultant shall obtain the priorby its employees at the rates shown in Exhibit A. written approval of the Port for any charges forThe Consultant shall receive no other payment for additional services by the Consultant, the additionalmaterials or disbursements unless expressly services of others retained by Consultant, or theallowed by Exhibit A. The Consultant shall not furnishing of additional supplies, materials, oradjust the wage rates in Exhibit A without written equipment. The Consultant shall not be entitled toauthorization from the Port.compensation for any such additional chargesincurred in violation of this Paragraph.3.1 Consultant shall supply Port with amonthly invoice and written documentation,satisfactory to Port, for all amounts due under thisProfessional Services AgreementPage 3 of 9
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 336611Ship Building and Repairing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID - SVC - Old Main Sewer Re...
Project: BID - SVC - Old Main Sewer Replacement - Skagit Valley College
State Government of Washington
Bid Due: 7/23/2026
BID - SVC - MV Campus - Aspha...
Project: BID - SVC - MV Campus - Asphalt Repair and Re-striping -
State Government of Washington
Bid Due: 7/09/2026