Calaveras Road Landslide Repair
Project Information
- Bid Title
- Calaveras Road Landslide Repair
- Issuing Agency
- City of Milpitas
- Location
- California
- Published Date
- Oct 6, 2025
- Closing Date
- Nov 5, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- CP 4302
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: CP 4302
Title: Calaveras Road Landslide Repair
Addenda: 0
Release Date: 10/6/2025
Due Date: 11/5/2025
OverviewPost InformationPosted At:Mon, Oct 6, 2025 1:45 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryThe City of Milpitas (“City”) is seeking proposals from qualified proposers (“Proposer”) in response to this Request for Proposals (“RFP”) to perform assessment, design, construction support, permitting, and environmental analysis for the landslide repair and improvement of the City owned road segment on Calaveras Road approximately 1,500 feet east of the Evans/Piedmont Road and Calaveras Road intersection. The Project site is located approximately 1,500 feet east of the Evans/Piedmont Road and Calaveras Road intersection.
BackgroundOver the past three decades, this roadway segment has sustained repeated damage from adjacent slope failures. The following is a summary of the City’s improvement efforts undertaken in response to these events.
- 1992: Installation of three Mechanically Stabilized Earth (MSE) retaining walls (Retaining Wall No. 1, 2, and 3) and reconstruction of the roadway.
- 2002: Installation of a grade beam wall at Retaining Wall No. 3, reconstruction of the roadway and storm drain improvements.
- 2017: Installation of pin-pile wall at Retaining Wall No. 3 with a subdrain system and reconstruction of the roadway.
On December 31, 2022, a severe rainstorm triggered renewed ground movement on the southern side of Calaveras Road, in the proximity of previously installed pin-pile wall at Retaining Wall No. 3, located approximately 1,800 feet east of the Evans/Piedmont Road intersection. The storm caused a shallow slope failure, exposing the upper five feet for approximate 100 feet of the 200-foot-long wall. Additionally, vertical cracking parallel with the existing wall suggests the extent of the slope failure includes the roadway section.
TimelineRelease Date:October 6, 2025Site Reconnaissance Meeting (Non-Mandatory):October 21, 2025, 10:00amSee Attachment A, Figure 1 on RFP
https://maps.app.goo.gl/4nmFujtvsBychEsk9Question Submission Deadline:October 27, 2025, 2:00pmProposal Submission Deadline:November 5, 2025, 4:00pm - Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Castle Creek Bridge Repair Active Contract Opportunity Notice ID 127EAW26Q0039 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/08/2026
Pavement repair, drainage, MG...
Pavement repair, drainage, MGS, Mod lighting systems and TMS.Details Event ID 04-1W7104 Format/Type:
State Government of California
Bid Due: 8/04/2026