DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County Addendum 1
Project Information
- Bid Title
- DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County Addendum 1
- Issuing Agency
- Division of Highways
- Location
- North Carolina
- Published Date
- Mar 18, 2026
- Closing Date
- Mar 24, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
DN01152 (15RE.21.3)POCDN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County
-
DN01152 ADD 1.pdfDoc. Type:
Addendum
Description: DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County POC -
DN01152 INV.pdfDoc. Type:
Invitation to Bid
Description: DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County POC -
DN01152 PROPOSAL.pdfDoc. Type:
Proposals
Description: DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County POC -
DN01152 STANDARD PLANS SHEETS - ROADWAY.pdfDoc. Type:
Plans
Description: DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County POC -
DN01152.ebsxDoc. Type:
Electronic Bidding File
Description: DN01152 (15RE.21.3) Polk County Welcome Center, Rest Area & Vending Renovation At Polk County Welcome Center On I-26 In Polk County POC
- Attachment Preview
-
W. S. Architects, PA3305 Durham Drive, S. 109Raleigh, NC 27603919.779.9797www.wsarchitectspa.comProject:SCO#:DatePolk County Welcome Center &Rest Area RenovationI-26 NorthboundColumbus, NC25-30577-01AMarch 17, 2026ADDENDUM #1See below notes based on questions received to date, attached updated spec section and bulletindrawing. This Addendum is considered a part of the Contract Documents and plans. Bidders shallreview the Addendum and incorporate the modified requirements in their proposals. It is the Contractor’sresponsibility to assure that all changes and/or additions noted in the Addendum are included in the bid.Prime Contractors are responsible for assuring that their subcontractors and suppliers have received theinformation in all Addenda.1. Confirm whether the existing star logo is to be replaced with new stamped concrete.The star will not be replaced in the concrete. The new concrete is not stamped orstained.2. Should be removed sub-stone base materials during demolition of the stamped concrete.If the existing stone base is disturbed during construction then it shall bereplaced per detail 2/G0.2.3. Existing Ramp to remain at Rest area building as shown on drawings G0.2 currently stampedconcrete. The new stamped concrete will not match, please advise.The existing ramp to remain in order not to disturb the stone walls. The newconcrete is not stamped or stained.4. Do we have any grading work required as a part of this project?The fine grading as required for the scope of work shown only. Any disturbanceof grade for work to be completed shall be repaired.5. Confirm if there is a landscaping allowance included for the work areas surrounding the buildings.Landscaping is not included in this project other than reseeding any lawndisturbed during construction6. Confirm whether temporary construction fencing around the work area is required to beincluded or not.No defined fencing is required to be included in the contract. However, there willbe a limited area of work determined onsite with the engineer and the GC isresponsible for securing the site and work area. DOT forces will barricade theentrances from the interstate to limit traffic as needed.7. On the site layout drawings, the note indicates to replace railing. However, it is not specifiedwhether the existing railing should be reused and reinstalled or if a completely new railing is to beprovided. Please confirm whether the new railing needs to meet ADA complaints.New railing to be provided to replace existing and it shall meet ADA. See attachedbulletin drawing for further clarification8. Provide the specifications for the flooring products indicated in the drawings, including LVT,rubber base, and carpet tile for welcome centerThere is no LVT or rubber base listed in the finish schedule for the WelcomeCenter. The floor tile in the Welcome Center airlock and foyer is to be the same asthe floor tile in the rest area building. The carpet tile in the Welcome Center isnew. If damaged during construction, it should be replaced in kind.9. Please confirm if any new attic access panels are required buildings. As two existing attic accesspanels were observed in the drawings.Yes, please replace the attic access panels in the rest area building only. Seeattached bulletin drawing for detail.10. Needing clarification on insulated glass. Are both Lites to be laminated? Or 1 lite laminated and 1lite tempered or Both Lites tempered.All glass to meet safety glazing requirements of NCSBC section 2406. Wheresafety glazing is required per this code section, it may be either laminated ortempered.11. Obscure glass in bathroom windows 1 lite obscure and 1 lite laminated or 1 lite obscure and 1 litetemperedBoth panes to be safety glazing if required by section 2406 of NCSBC. Only theinterior pane has to be obsure.12. Need spec on resin panel at storefront D and ESee attached spec. Please note that this panel is in addition to insul. glass panelas needed for energy requirements.13. Confirm whether the existing HVAC concrete pad is adequate for the new equipment, or if newconcrete pads will be required?The new HVAC units are larger than existing so new concrete pads will berequired.14. Clarify whether we are required to install new backer board behind the wall tile as part of thescope of work.Please include replacing the backer board behind the wall tile in the contract.15. Confirm whether repairs to the existing building stone are required?No existing stone masonry repairs are anticipated. Please include a soft cleaningnear the end of the project to improve appearance.16. Could you provide the Fire Extinguisher layout for all the buildings?The fire extinguishers are only being replaced in the Rest Area building. The fireextinguishers in the other buildings are existing to remain.17. Who is providing Temporary Power, Water & heating facilities?The site will be closed to the public. Utilities that are existing may be used by theGC to the extent possible. Otherwise, other temporary power, water, etc. is to beprovided by the GC.18. The aluminum louvered fence panels only come in horizontal configurations, but thespecs show the Louver fencing system is vertical configurations. Please Confirm.The fencing that faces the existing sidewalk and the parking will be vertical panelsand the horizontal louvered sections face the interstate.19. Are there any Sitework testing required as per NCDOT during construction.The only construction testing anticipated is for concrete. This testing will behandled by the Resident Engineer.20. Based on the demolition drawings, a sanitary napkin disposal unit is shown in the familyrestroom. However, in the new rest area planning drawings, a replacement unit is not indicated.Please confirm whether a new sanitary napkin disposal unit is to be provided and installed in thefamily restroomPlease provide a new sanitary napkin disposal in the family restroom. See N inthe toilet accessory schedule.Rest Area:21. The RCP doesn’t show ceiling heights. Detail 18/A1.5 scales to 8’-0” and the bathroom elevationsscale to 9’-0”. Please confirm ceiling heights.The existing ceiling height is approximately 8’-4”. The site is currently open to thepublic and a site visit is recommended.22. Detail 2/A1.2: Does the Waterproofing apply to all tile floor and wall areas, or just the restroomsfor the wall portion?This detail applies to the floors and walls in all the restrooms.23. Per Section 09300 Tile:a) It appears we are to figure floor prep. This would have to be an estimate until we determineexactly what must be done.The contract price is fixed not an estimate.b) Are we sure this existing tile isn’t on a mortar bed? I know a lot of Rest Areas are on a mortar bedinstallation.The existing drawings from the original construction list the tile as thin-set.24. Section 09300 lists Laticrete as Basis of Design, however it says Mapei will be considered. If theproducts we plan to use meet or exceed ANSI specs. do we need to pre-submit for approval?If the setting products, meet the specifications and are single sourced, they will beconsidered.25. The plans show Schluter trims to be Satin Aluminum. However, 09300 2.6 B. shows all to beStainless Steel. There is a tremendous amount of price difference from Aluminum to StainlessSteel, please verify.Please provide the Schluter trims as Aluminum.26. We assume the Rest Area is a complete shut down and all work to be in one phase, correct?Yes, all buildings on the site will be closed to the public. Property and contentsmay still be accessed by staff. The ‘existing to remain’ sections of the project areto be protected from damage and unused by GC unless approved by engineer.27. The plans call for 1/8” grout lines on all tiles but some tiles shown recommend 3/16” grout lines.We will follow the manufacture’s recommendations, correct?Correct. We will follow all manufacturer’s recommendations but require the groutjoints be as narrow as possible.28. Please confirm the bathroom walls with two colors of tile will grout all in the same color, or if therewill be two grout colors.For pricing purposes, please include as if each tile spec’ed could have it’s owngrout color. For clarity, the Best Tile, Vermont Cream with Craft tile above is thesmall dash pattern in the restrooms. The small to medium dash pattern in thelobby is the Cocoon by Caesar.WELCOME CENTER:29. Does this mean we should figure doing this work outside of normal work hours?No, the site is closed to the public. Normal business hours will be acceptable.30. There is no specific tiles listed for the Welcome Center. Is the new Airlock tile to try andmatch existing? This will most likely not be possible.The floor tile in the Welcome Center airlock and foyer is to be the same as thefloor tile in the rest area building. See # 8 above.31. We assume the will be patching of existing here where the old Air lock is removed, correct?Again, a match may not be available.This floor area will become carpet tile to match existing. This carpet is fairlynew and should be able to be matched. The drywall walls and ceiling to bepatched and repaired. The building is open to the public and a site visit isrecommended.32. The plans include details for the outdoor signage at the Welcome Center; however, thesignage is not shown or specifically called out on any of the plan sheets. Please confirm.Dimensional letters spelling “WELCOME CENTER” to be placed over new entry.OTHER• Extent of Removal: Please clarify the exact limits of the existing stamped concrete removal. Does thescope require the demolition and removal of all existing stamped concrete in this area, or just specificsections?All shaded areas shown on G0.2 are existing stamped concrete and should beremoved and replaced with a typical concrete per 2/G0.2. The only remainingstamped concrete should be at the ramp in front of the rest area between thestone walls.• Replacement Finish & Motif: For the new concrete, are we required to match the existing stamped finish(including the star motif), or should the replacement simply be a standard broom finish?The new concrete will not be stamped or stained. There will not be a star.The new sidewalk finish will be brushed to provide a durable slip-resistant finish.The sidewalk shall not hold water or allow ponding. It may have a maximumcross-slope of 2%. Control joints and expansion joints will be placed as needed.• Color Specifications: If the replacement concrete is to be stamped, please provide the approved colorscheme, including any specifications for integral color and release.The new concrete will not be stained.Clarification is needed regarding the restroom building finish on Sheet A1.2. The Finish Scheduleindicates paint on all walls in the men's and women's toilet rooms, but Sheet A1.5 elevations show a tilefinish on the walls. I would like direction on which finish is correct.The area above the tile is to be painted per the schedule.A note on the plans states that the Welcome Center building will remain open during construction. Canyou advise the hours it will be open?No, the site is closed to the public.Since there is no mention of the restroom or vending buildings, should we assume they will be closed tothe public during construction?The entire site is closed to the public.Signed,3/18/2026Ginger SummerProject Architectginger@wsarchitectspa.comAttachmentsEND OF ADDENDUM #1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number: IFB 2026-08 Bid Title: Landfill New Scale Project Category: Moore County
County of Moore
Bid Due: 7/16/2026