RFQ 26-01 FITCH HIGH SCHOOL STADIUM RENOVATIONS
Project Information
- Bid Title
- RFQ 26-01 FITCH HIGH SCHOOL STADIUM RENOVATIONS
- Issuing Agency
- Town of Groton
- Location
- Connecticut
- Published Date
- Dec 15, 2025
- Closing Date
- Jan 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFQ 26-01 FITCH HIGH SCHOOL STADIUM RENOVATIONS
Share this page× Share this pageCloseCopy and paste this code into your website.
Your Link Name
- Attachment Preview
-
Town of GrotonRequest forQualificationsConsultant Design ServicesFitch High School Stadium RenovationsRFQ 26-01Submittals DueJanuary 30, 2026REQUEST FOR QUALIFICATIONSConsultant Design ServicesFitch High School Stadium RenovationsFOR THE PUBLIC WORKS DEPARTMENT, TOWN OF GROTON, CTINTRODUCTIONThe Town of Groton Public Works Department is soliciting qualification statements fromqualified consultants to perform the following services:To provide architectural and engineering services (preliminary and final design, contractadministration and site inspection) for the renovation of the Fitch High School stadium whichincludes the football field, running track, grand stands, new restroom/concession and storagebuildings as well as other site amenities.SUBMITTAL INSTRUCTIONSThe following information must be included in each submittal of qualifications: Cover letter indicating firm’s interest and signed by person authorized to enter intocontracts for the firm. Company background statement consisting of who the firm is, discipline capabilities,principals, staff availability, location, and financial stability. A detailed statement including the organizational structure under which the firm isproposing to conduct business. The relationship to any "parent" firm or subsidiary firm,with any of the parties concerned, must be clearly defined. In the case of multiple firms,the "firm of record" and the party responsible for coordination shall be identified. Includefirm’s ability to administer the services outlined in the Request For Qualifications. Qualifications and position with firm of those individuals that represents the knowledgebase that the firm will bring to the Department. Include resumes of key personnel. Concluding statement as to why your firm is best qualified to meet the needs of the Townand why your firm should be selected.The firms responding to this Request for Qualifications must have or be able to procure thelevels of insurance listed in this package. Those firms short listed for interviews must provideproof of the insurance before the interview.For questions, please contact Lori Hipsky, Project Management Specialist, at 860-448-4084.An original and six (6) copies of your qualifications, containing the above requirements, are tobe submitted to, Director of Public Works, 134 Groton Long Point Road, Groton, CT, byJanuary 30, 2026 by 4:00 p.m. Submittal deadline will be strictly enforced.The Town of Groton is an equal opportunity/affirmative action employer.Page 2 of 612/15/25SCOPE OF SERVICESGENERAL INFORMATION The Town of Groton voters recently approved bonding $14,380,000 for renovations andimprovements to the Fitch High School stadium facility. This work is Phase 1 of the Townof Groton Athletic Field Improvement plan. The referendum explanatory text is attached forreference. Proposed renovations and improvements to the Fitch High School Stadium include: Replacing the natural grass football field with a synthetic turf multi-usefield Replacing the existing 6-lane running track, around the field, with a new8-lane track Replacing all of the existing grandstands with new grandstands that havean ADA accessible area Construction of a new Press Box New field lighting Construction of a new public restroom and concession building Construction of a new ticket booth Installing a new scoreboard Constructing a new natural grass practice field Replacing the track & field event amenities (e.g long jump, high jump,pole vault, etc…) Construct a new parking lot adjacent to the field, primarily for ADAaccessibility Construction of a new storage buildingORGANIZATIONThe Public Works Department will assign a member of its staff to serve as theproject manager, whose duties will be as follows:• To act as the owner's representative• To administer the professional contracts• To staff and report to the various boards and commissions• To have prepared press releases and other informationPROPOSED CONSULTANT SERVICESBelow is a brief summary of the services we are looking for. This list is not an all-inclusive list of all services needed. A detailed scope of services will be developedwith the selected consultant.Page 3 of 612/15/25Phase 1 – Conceptual Design General familiarize yourself with the area and special issues Hold a design kick-off meeting to gather input and ideas from the various stakeholders Perform field surveys and gather available utility information Prepare concept level plans with budgeting order of magnitude costs Identify any project components that may not be able to be completed due to projectbudget or other constraints Refine plans based on comments from staffPhase 2 – Preliminary Engineering / Preliminary Design Develop design plans and profiles to 30% completion stage based on the conceptual plansfrom Phase 1 Identify any permits needed Code analysis and ADA compliance review Preliminary lighting design and photometric analysis Identify utility relocations Include typical cross-sections, building floor plans, sidewalks, drainage and other utilities,and pertinent details Prepare cost estimate Conduct a public informational meeting and Town Council/ Board of EducationpresentationPhase 3 – Final Design Bring design to 90% final completion Prepare project manual and bid specifications Obtain all needed permits to construct Prepare final cost estimatePhase 4 – Bidding Create 100% final plans and project manual Hold pre-bid meeting for prospective bidders Answer bidder questions and issue addendum Review bids received and make written recommendation to awardPhase 5 – Construction Administration Hold pre-construction conference Review and approve all submittals, shop drawings, proposed change orders, Requests forInformation, and payment requisitions Attend regular job meetings Provide on-site construction inspectionSELECTION OF CONSULTANTA Selection Committee consisting of Town of Groton staff and officials will evaluate thequalification statements that we receive and select not more than three of the mostqualified firms to be interviewed by the panel. Interviews will be set up with the selectedfirms and each firm will make a presentation to, and answer questions from, the panel.The panel will select the most qualified firm.Page 4 of 612/15/25Evaluations will be based on the following factors:• Firm experience in High School athletic field/stadium design• Experience of key personnel within your firm• Thoroughness of submittal• Capacity of firm to perform work on scheduleThe Town will enter into a contract with the selected firm within 30 days after thecontract and fee has been agreed upon. Funding is in place for the design andconstruction.TOWN SUPPLIED INFORMATION• Any existing surveys, plans and mapping• GIS data (2’ contours)DELIVERABLES• The plans shall be done in AutoCAD format (.dwg). The contract specifications shallbe done in Microsoft Word format (.doc).• Deliver to the Town a full set of final plans in digital format.• Deliver to the Town a full set of final specifications in digital format.Page 5 of 612/15/25
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
High School Track Improvements
High School Track Improvements the Town of Putnam invites sealed bids for furnishing
State Government of Connecticut
Bid Due: 8/06/2026
2026-27R Rooster River Flood ...
Project: 2026-27R Rooster River Flood Mitigation Project - Fairchild Wheeler Golf Course Ref.
Town of Fairfield
Bid Due: 7/15/2026