Request for Statements of Qualifications 100 North Replacement Project

Project Information

Bid Title
Request for Statements of Qualifications 100 North Replacement Project
Issuing Agency
Vernal city
Location
Utah
Published Date
Jun 23, 2025
Closing Date
Jul 22, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid Title: Request for Statements of Qualifications 100 North Replacement Project
Category: Sewer Line Repairs / Replacement
Status: Open
Description:

Invitation to Submit Qualifications

Vernal City is inviting engineering firms to submit a Statement of Qualifications to provide professional design services for the water and sewer lines and other associated infrastructure as described in this RSOQ. A mandatory pre-submittal conference will be held on June 30th at 3:00 pm in the planning conference room at City Hall, 374 East Main, Vernal, Utah. Additional information will be given at the conference and proposers will have the opportunity to ask questions.

Project Need and Current Conditions

Much of the city’s culinary water system is extremely dated, exceeding 50 yrs old. It is constantly in need of repairs or causing property damage and expenses due to the frequent breaks and leaks. Early designs placed a feeder line under Highway 40, this poses significant logistical hurdles when issues arise on that line. Some of the fire hydrants are nearly 70 yrs old and no longer meet the minimum standard requirements.

Many sewer collection lines are also aged. Growth (actual and projected) means some lines are at, or nearly at capacity. Past fixes to problems have led to inefficiencies (e.g. 3 man holes within 20 feet in the intersection of a state highway).

All of these items cause concern for safety as well as difficulty in our effort to provide safe and effective distribution of drinking water as well as collection of wastewater.

Scope of Project

This project is part of the City's goal to update our utility infrastructure and we plan on upgrading water mains, service laterals, meter pits as well as sewer mains and manholes. Due to required separation distances, a significant portion of the roadway will be affected and the City hopes that rather than just patching the affected areas along the stretch this can be used as an opportunity for reconstruction as needed. The proposed project will all be located within Vernal City limits. It includes replacing the older undersized water and sewer lines as well as the roadway on 100 North, from 1000 West to 500 East.


Qualifications

Replacing existing lines is not the same as building new infrastructure, significant interface with other underground utilities is expected. This project will also present unique challenges as sewer bypass pumping will be needed. It is our hope to find a firm that will successfully navigate the existing utility conflicts and is skilled and experienced in the aspects of water and sewer line replacement as well as road reconstruction design.

Project Overview and Components

Vernal City is seeking to retain professional engineering firms and/or teams to provide planning, design, bidding and construction administration services related to this water and sewer line construction project. The Project includes the following elements:

Design Phase

? Draft contract documents, construction specifications and drawings (including the

? locations of existing utilities)

? Establish pay limits for aspects of the project e.g. asphalt replacement, bypass pumping, etc.

? Provide bidding package (contract documents, construction specifications and drawings)to potential contractors

? Answer questions from potential bidders

? Hold pre-bid meeting

? Assess bids and help City select contractor

Construction Phase

? Provide construction management (contract administration, pay request processing, plan

approval and operating permit from state, RFIs, project closeout, as-built plans, etc.)

? Meet weekly with city staff and contractor for project updates

? Coordinate public outreach to affected individuals and businesses

? Be available to respond to issues that arise during construction in a timely manner

? Provide part time oversight of construction activities

Selection Timeline

June 23, 2025 RSOQ Letter of Interest

June 30, 2025 at 3:00 pm Mandatory Pre-submittal Conference

July 15, 2025 at 5:00 pm Last Day to Submit Questions for Clarification

July 22, 2025 at 4:00 pm SOQ Due

August 7, 2025 Announce Team Selection

We anticipate a construction bid opening in late 2025 with construction starting spring of 2026.


Submittal Requirements

Proposers must submit one printed copy of the SOQ and one electronic copy in PDF format on a flash drive. Submittals are to be delivered in a sealed envelope marked “Statement of Qualification for the 100 North Water and Sewer line Replacement Project” and received at the City no later than July 22, 2025 at 4:00 pm.

SOQs must be delivered to the following address:

Vernal City Finance Department

Attn: Finance Director

374 East Main

Vernal, Utah 84078

Mailed SOQs that arrive after 4:00 pm on July 22, 2025 will not be considered. Vernal City will not be responsible for delays in the mail system.

Statements of Qualifications must have the following components, limited to the number of pages stated:

Letter of Interest - 1 page

Design Team - 1 page

Project Understanding and Work Plan – 2 pages

Similar Projects – 4 pages

References from Past Similar Projects - 1 page

Proposed Project Timeline - 1 page


Selection Process and Evaluation Criteria

Vernal City will form a review committee to evaluate the statements of qualifications. The SOQs will be evaluated on the following criteria:

Design Team Composition - 20%

Previous Waterline Replacement Experience - 20%

Previous Sewerline Replacement Experience - 20%

Previous Road Reconstruction Design Experience - 20%

References - 20%

Questions regarding this RSOQ should be directed to Keith Despain at For security reasons, you must enable JavaScript to view this E-mail address.

Publication Date/Time:
6/23/2025 8:30 AM
Closing Date/Time:
7/22/2025 4:00 PM
Pre-bid Meeting:
June 30th 2025 at 3:00 pm
Contact Person:
Questions regarding this RSOQ should be directed to Keith Despain at kdespain@vernal.gov
Qualifications:
Replacing existing lines is not the same as building new infrastructure, significant interface with other underground utilities is expected. This project will also present unique challenges as sewer bypass pumping will be needed. It is our hope to find a firm that will successfully navigate the existing utility conflicts and is skilled and experienced in the aspects of water and sewer line replacement as well as road reconstruction design.
Related Documents:
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 541330Engineering Services
  • NAICS 541990All Other Professional, Scientific, and Technical Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

2026 Storm Drain Projects

Project: 2026 Storm Drain Projects Ref. #: N/A Department: CITIES - Bountiful Type:

State Government of Utah

Bid Due: 7/21/2026

RFP - SGPD CAMPUS PROJECT

Project: RFP - SGPD CAMPUS PROJECT Ref. #: 26-294 Type: RFP Status: Open

City of St. George

Bid Due: 7/20/2026