CSP #207577 Alex W. Spence Preparatory Academy Talented and Gifted - Renovation Addendum No. 02
Project Information
- Bid Title
- CSP #207577 Alex W. Spence Preparatory Academy Talented and Gifted - Renovation Addendum No. 02
- Issuing Agency
- Dallas Public Schools
- Location
- Texas
- Published Date
- Dec 11, 2025
- Closing Date
- Jan 6, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Solicitation Summary
AttachmentsBid Close Date:
Bid Closing: January 6, 2026
Bid Closing Time: 2:00 PM
A pre-proposal meeting will be held for Alex W. Spence Preparatory Academy Talented and Gifted on Monday, December 01, 2025 via MS Teams at 11:00 AM for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.
MICROSOFT TEAMS INFORMATION
Meeting ID: 242 157 359 961 9
Passcode: zx2NX9vyAll general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and PM at the school to start site tours. The first site tour will take place at:
Alex W. Spence Preparatory Academy Talented and Gifted
Date: December 1, 2025
Time: 4:00 PM
3001 Capitol Ave
Dallas, TX 75204
All Construction Services procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, 01/06/2026 at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Wednesday, 01/07/2026 at 3:00 PM (local time).
Any materials received after the respective closing dates / times will not be considered.
The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at 3:30 PM local time upon submittal of Part 2 of the Package, via Microsoft Teams at Dallas ISD Construction Services, Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.
MICROSOFT TEAMS INFORMATION
Meeting ID: 241 827 982 494 9
Passcode: dD6wg6D6No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing.
The right is reserved to reject any or all bids, proposals, CSPs, or statements of qualification and to waive technicalities.
The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.
The Dallas Independent School District’s Construction Services projects have a 30% Small Business Enterprise (SBE) aspirational goal in construction.
- Attachment Preview
-
DALLAS INDEPENDENT SCHOOL DISTRICTPROCUREMENT SERVICESADDENDUM NO. 02SOLICITATION NUMBER AND TITLE CSP#207571 Alex W. Spence Talented and Gifted PreparatoryDecember 10, 2025The Purpose of this Addendum No. 02 is to provide questions and answers received for the notedsolicitation. In addition, there may also be updates to the solicitation which should be published asimportant information related to the process:CLARIFICATION TO BIDDERSITEM 1.Regarding window replacement scope, Contractors shall assume a phasedimplementation of scope with no more than 50% of windows in any given office orclassroom shall be planned for restoration or replacement at a given time. If morethan 50% of windows are needed to be removed for restoration or replacement,Owner approval is required prior to work starting.ITEM 2.All temporary construction walls, plywood, or other building material used tosecure an opening, or provide separation between construction and schoolactivities shall be painted or have a graphic applied to it. Bare plywood fortemporary construction walls will not be accepted.ITEM 3.Bid Alternates with an Allowance amount shall assume the cost of the work is theAllowance amount provided and all bonds, insurance, general conditions,overhead, profit and all other costs shall be added to the Allowance amount forthe total cost of the Bid Alternate.REVISIONS TO THE PROJECT MANUALThe following Specification Sections are revised and re-issued with this Addendum:ITEM 4. SECTION 00 41 12 PROPOSAL FORM – ALTERNATES AND UNIT PRICES: has been1DALLAS INDEPENDENT SCHOOL DISTRICTPROCUREMENT SERVICESADDENDUM NO. 02SOLICITATION NUMBER AND TITLE CSP#207571 Alex W. Spence Talented and Gifted Preparatoryrevised to reflect changes in the bid alternate allowances and has been re-issuedin its entirety.ITEM 5. SECTION 01 22 00 ALLOWANCES: has been revised to include security vendorlanguage and has been re-issued in its entirety.REVISIONS TO THE PROJECT MANUALITEM 6. SHEET C2.3 – PAVING AND DIMENSIONAL CONTROL PLAN: has been revised toindicate base bid scope of asphalt paving and has been re-issued in its entirety.ITEM 7.SHEET C2.3 – PAVING AND DIMENSIONAL CONTROL PLAN – BID ALTERNATE #1:has been revised to indicate bid alternate scope of concrete paving in lieu ofasphalt paving and has been re-issued in its entirety.ITEM 8.SHEET AS1.0 – SITE PLAN: has been revised to include minor grading andinstallation of splash blocks at existing downspouts and has been re-issued in itsentirety.ITEM 9.SHEET AD1.3 – DEMO SECTION DETAILS & WINDOW TYPES: has been revised toprovide additional notes and details related to window demolition and has beenre-issued in its entirety.ITEM 10.SHEET AD1.4 – DEMO SECTION DETAILS & WINDOW TYPES: has been revised toprovide additional notes and details related to window demolition and has beenre-issued in its entirety.ITEM 11.SHEET AD1.5 – DEMO SECTION DETAILS & WINDOW TYPES: has been revised toprovide additional notes and details related to window demolition and has beenre-issued in its entirety.ITEM 12. SHEET A1.1 – LEVEL 1 – OVERALL FLOOR PLAN: has been revised to clarify windowand painting scope at exterior windows being refurbished or replaced and hasbeen re-issued in its entirety.ITEM 13.SHEET A1.2 – LEVEL 2 – OVERALL FLOOR PLAN: has been revised to clarify windowand painting scope at exterior windows being refurbished or replaced and hasbeen re-issued in its entirety.ITEM 14. E1.1 – LEVEL 1 – LIGHTING AND FIRE ALARM PLAN: has been revised to remove firealarm pull stations outside of the main administration area and has been re-issuedin its entirety.2DALLAS INDEPENDENT SCHOOL DISTRICTPROCUREMENT SERVICESADDENDUM NO. 02SOLICITATION NUMBER AND TITLE CSP#207571 Alex W. Spence Talented and Gifted PreparatoryITEM 15. E1.2 – LEVEL 2 – LIGHTING AND FIRE ALARM PLAN: has been revised to remove firealarm pull stations outside of the main administration area and has been re-issuedin its entirety.Please sign this addendum # 02 and submit along with your copies of the proposal. ALL OTHERPROVISIONS, AND OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. BIDDERS ARE REQUIREDTO ACKNOWLEDGE AND RETURN/SUBMIT A COPY OF THIS ADDENDUM WITH THEIR PROPOSAL.Company NameBidder’s SignatureDateEND OF ADDENDUMNO. 023SECTION 00 41 12 – PROPOSAL FORM – ALTERNATES AND UNIT PRICINGName of ContractorCOMPETITIVE SEALED PROPOSAL (Part 1C)toDALLAS INDEPENDENT SCHOOL DISTRICTFOR THE FOLLOWING WORK:PART 1. General InformationCSP PACKAGE 207577, consisting of improvements to:Org #058PROJECT NAMEAlex W. Spence PreparatoryTalented and Gifted AcademyPROJECT TYPERenovationADDRESS4001 Capitol AvenueDallas, Texas 75204PART 2. Proposal Form2.01 through 2.09Refer to Specification Section 00 41 11.2.10 Alternate Price ItemsThe Contractor proposes the following sums as additions to or deductions from the Base Price amount foralternates. Failure to quote every item may cause the entire Proposal to be considered non-responsive. Ifthere is no cost change in the alternate(s) pricing, the Contractor should enter “$0.00” as the price for thealternate. Do not make an entry of N/A.All Alternates must be priced. Alternates are not listed in the order of preference.058 Alex W. Spence Preparatory Talented and Gifted Academy - RenovationNo.Alternate DescriptionProposer’s AddPrice01ALTERNATE 01 – Parking and drive areas described onsheet C2.4 to be asphalt paving in lieu of concrete paving.02ALTERNATE 02 – Add Owner-Controlled Allowance of$232,000.00 for DIGI turnkey scope including infrastructurefor new security cameras, access control cards, etc.03ALTERNATE 03 – Add Owner-Controlled Allowance of$1,250,000.00 for replacement of existing floor finishes(carpet, VCT, etc.) in classrooms, corridors, offices, etc.04ALTERNATE 04 – Add Owner-Controlled Allowance of$325,000.00 to replace and/or encapsulate existingteaching surfaces at classrooms and provide new teachingsurface(s).05ALTERNATE 05 – Add Owner-Controlled Allowance of$500,000.00 to repair/patch/paint previously painted interiorwall and ceiling surfaces in classrooms, corridors, offices,etc.06ALTERNATE 06 – Add Owner-Controlled Allowance of$150,000.00 to demo. existing and provide new audiovisualsystem at Auditorium.07ALTERNATE 07 – Add Owner-Controlled Allowance of$75,000.00 to provide sound system and infrastructure atGymnasium.08ALTERNATE 08 – Add Owner-Controlled Allowance of$650,000.00 to renovate existing interior courtyard toDallas ISD Construction Services00 41 12Issued 5/1/2024Page 1 of 5Proposer’sDeduct PriceCSP 207577REVISED 12/10/2025SECTION 00 41 12 – PROPOSAL FORM – ALTERNATES AND UNIT PRICINGName of Contractorcorrect drainage, connect to sub-surface system;install artificial turf and concrete surfaces, replaceaccessible ramp, stairs, remove existing trees, etc.09ALTERNATE 09 – Add Owner-Controlled Allowance of$900,000.00 to provide artificial turf at existing soccerfield.10ALTERNATE 10 – Add Owner-Controlled Allowance of$750,000.00 to demo. existing and provide neweducational casework in classrooms and offices and/orencapsulate existing lockers in corridors.11ALTERNATE 11 – Add Owner-Controlled Allowance of$400,000.00 to provide pole-supported shade structure(s)and foundations.12ALTERNATE 12 – Add Owner-Controlled Allowance of$800,000.00 to remove existing and replace light fixtureswith LED fixtures similar size and quantity in classrooms,corridors, offices, public spaces, etc.2.11 Unit PricesThe Contractor proposes the following all-inclusive unit prices for the items/tasks. Failure to provide unit pricingfor each item may result in the Proposal being deemed as non-responsive. Do not make an entry of N/A. Allunit prices must be priced. Unit prices are not listed in order of preference.058 Alex W. Spence Preparatory Talented and Gifted Academy - RenovationNo.Unit Price ItemUnit of measureProposer’s Unit Price01 Provide and install data wall jack Per Unit / Each$– new termination,conduit with 10’ wire to j-boxabove ceiling02 Provide and install electrical wall Per Unit / Each$outlet (duplex) – new termination,¾” conduit with 10’ wire to j-boxabove ceiling.03a Install new concrete paving inSquare Foot (SF)$accordance with detail on sheetC2.7. Provide unit pricing for 6”thickness described on PavingPlans.03b Install new concrete paving inSquare Foot (SF)$accordance with detail on sheetC2.7. Provide unit pricing for 8”thickness described on PavingPlans.04 Install new concrete sidewalkSquare Foot (SF)$paving in accordance with detailon sheet C2.7. Provide unitpricing for 4” thickness describedon Paving Plans.05 Provide and install 24”x24”Per Unit / Each$access door installed in gypceiling with repair of finishes andDallas ISD Construction Services00 41 12Issued 5/1/2024Page 2 of 5CSP 207577REVISED 12/10/2025
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Due Date: July 8, 2026 @ 3:00 P.M SPECBOOK Rev 6 15 26
Mercedes city
Bid Due: 7/08/2026
CDBG - Minor Rehab - ITB 2026...
Project: CDBG - Minor Rehab - ITB 2026-107ER - Gilbert Ref. #: MR
City of Lubbock
Bid Due: 7/13/2026