Tennis Court Resurfacing
Project Information
- Bid Title
- Tennis Court Resurfacing
- Issuing Agency
- City of Palo Alto
- Location
- California
- Published Date
- May 12, 2026
- Closing Date
- May 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Tennis Court Resurfacing
Addenda: 1
Release Date: 4/17/2026
Due Date: 5/20/2026
Tennis Court ResurfacingFollowLast updated by Addendum #1 on May 13, 2026 8:00 AM See what changedInvitation for Bid- ConstructionCommunity Services63063 , 63163 , 91235 , 91265 , 91394 ... show allProject ID: 197312Release Date: Friday, April 17, 2026· Due Date: Wednesday, May 20, 2026 3:00pmPosted Friday, April 17, 2026 12:23pmAll dates & times in Pacific TimeDraft Response No Bid7 days, 20 hours, 51 minutesOverview
Post Information
Posted At:Fri, Apr 17, 2026 12:23 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe City is seeking a licensed contractor to resurface the tennis courts at our Hopkins and Hoover court locations.
Hopkins (asphalt) - Overlay resurfacing The scope consists of:
-
Site preparation, clearing, and restoration,
-
Traffic control,
-
Control of sediment and erosion,
-
Temporary Construction staging area,
-
Concrete wash out area,
-
Protection of existing park facilities, amenities and utilities,
-
Removal and disposal of the existing (3) three sets of tennis court net posts, netting, and windscreens and windscreen hardware.
-
Remove and burn seeds?
-
If Petromat is found during the project, the contractor is responsible for removal and disposal of the Petromat.
-
2” thick asphalt overlay installation of tennis court asphalt pavement for (3) three tennis courts.
-
4ft feathered edge asphalt tapered down from courts toward fence line. This will help accommodate the raised court height in relation to the fence line.
-
Remove existing pathways on the Southern and Western sides of the courts. Replace pathways with new asphalt-paved pathways. New pathways shall be 2” thick.
-
Pathway on the southern edge of the courts, along the parking lot to be 6.5’x130’.
-
Pathway on the Western edge of the courts, parallel to Newell Road, to be 6’x130’.
-
Patch all cracks using acrylic patch material. Sand patches to be smooth. Approximately 200 Linear Feet or cracks to be patched.
-
Approximately 200 LF of Polypave Court Shield over patched surface cracks.
-
Dewatering, drainage, and disposal
-
Tree protection,
-
Repair and reconnection of existing chain link fencing if it becomes damaged during project or needs to be raised to accommodate overlay,
-
Repair concrete and asphalt pathways if they become damaged during project
-
Irrigation repair if it becomes damaged during project
-
Installation of tennis court color acrylic coatings and striping for (3) three tennis courts to match existing (striping) layout,
-
Installation of new tennis equipment including tennis net posts (winder and dead side), ground sockets with vandal proof caps and tennis nets
-
Installation of two (2) new benches at existing bench locations on the court.
-
Record keeping of submittals and performance testing,
-
Submittal of all operation and maintenance manuals.
Hopkins (asphalt) - Overlay resurfacing
The scope consists of:
-
Site preparation, clearing, and restoration,
-
Traffic control,
-
Control of sediment and erosion,
-
Temporary Construction staging area,
-
Concrete wash out area,
-
Protection of existing park facilities, amenities and utilities,
-
Installation of approximately 150 Linear Feet of crack fabric over surface cracks. See Figure C.
-
New acrylic resurfacing of tennis court asphalt pavement for (2) two tennis courts.
-
Replace existing 4 ft x 2 ft asphalt apron at South court entrance in-kind. (Figure D)
-
Dewatering, drainage, and disposal,
-
Tree protection,
-
Repair and reconnection of existing chain link fencing if it becomes damaged during project
-
Repair concrete and asphalt pathways if they become damaged during project
-
Repair natural turf and sod if they become damaged during project
-
Irrigation repair if it becomes damaged during project
-
Installation of tennis court color acrylic coatings and striping for (2) two tennis courts to match existing (striping) layout,
-
Record keeping of submittals and performance testing,
-
Submittal of all operation and maintenance manuals.
Timeline
Bid Post Date:April 17, 2026Question and Clarifications Due Date and Time:April 22, 2026, 3:00pmCity's Responses to Questions:May 1, 2026Bid Due Date and Time:May 20, 2026, 3:00pm -
- Commodity Codes
-
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Castle Creek Bridge Repair Active Contract Opportunity Notice ID 127EAW26Q0039 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/08/2026
Pavement repair, drainage, MG...
Pavement repair, drainage, MGS, Mod lighting systems and TMS.Details Event ID 04-1W7104 Format/Type:
State Government of California
Bid Due: 8/04/2026