Request for Statements of Proposal - City Hall Stabilization Project
Project Information
- Bid Title
- Request for Statements of Proposal - City Hall Stabilization Project
- Issuing Agency
- City of Paducah
- Location
- Kentucky
- Published Date
- Feb 13, 2026
- Closing Date
- Mar 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request for Statements of Proposal - City Hall Stabilization Project
The City of Paducah, Kentucky, seeks sealed Statements of Proposal (“Proposal”) from qualified professional design services firms (Firm) to prepare and provide appropriate architectural and engineering contract documents (Project Documents) for permitting, investigative studies, design, historic preservation, bidding, and construction administration, observation, and inspection. The firm will assign a project manager to oversee the project and provide regular updates to the city project team. These services are for the City Hall Stabilization Project” (Project). The Project consists of the rehabilitation/replacement of the canopy and support columns in a manner consistent with the building's historic designation, including National Historic Register requirements, and the replacement/rehabilitation of the building's external drainage system.
Submitting firms will ideally have extensive experience in the rehabilitation of historic buildings and in addressing structural issues in large buildings. Firms should have expertise in replacing or retrofitting in-ground building drainage systems. Firms should be able to demonstrate and discuss previous projects that achieved very high levels of customer satisfaction with the design and construction services. Principals of interested firms must be appropriately licensed and/or registered in the Commonwealth of Kentucky to provide the requested services.
City Hall Stabilization Project - Statements of Proposal Packet
A MANDATORY pre-bid meeting will be conducted on Thursday, February 19, 2026, at 10:30 a.m. CST at Paducah City Hall, 300 South 5th Street, Paducah, KY 42003. All interested firms must attend this meeting.
Your completed Proposal is due to the City of Paducah by 4:30 p.m. CST on Friday, March 13, 2026. Please submit five (5) hard copies of your submittal for our review. Please mail or hand deliver your submittal to
City of Paducah
Attn: RFQ 2026-CITY HALL STABILIZATION PROJECT
City Clerk’s Office
300 South 5th Street
P.O. Box 2267
Paducah, KY 42002 - Attachment Preview
-
TABLE OF CONTENTSSECTIONDESCRIPTIONPAGE NO.1.Invitation....................................................................................................12.Background....................................................................................................13.Project Description ..................................................................... 24.Scope of Services ........................................................................ 25.Time Line........................................................................................................ 26.Submittal Requirements............................................................. 47.Selection Process........................................................................................... 68.Additional Information ............................................................... 7SECTION NO. 1- INVITATIONThe City of Paducah, Kentucky, seeks sealed Statements of Proposal (“Proposal”) from qualifiedprofessional design services firms (Firm) to prepare and provide appropriate architectural andengineering contract documents (Project Documents) for permitting, investigative studies, design,historic preservation, bidding, and construction administration, observation, and inspection. The firmwill assign a project manager to oversee the project and provide regular updates to the city projectteam. These services are for the City Hall Stabilization Project” (Project). The Project consists of therehabilitation/replacement of the canopy and support columns in a manner consistent with thebuilding's historic designation, including National Historic Register requirements, and thereplacement/rehabilitation of the building's external drainage system.Submitting firms will ideally have extensive experience in the rehabilitation of historic buildings and inaddressing structural issues in large buildings. Firms should have expertise in replacing or retrofitting in-ground building drainage systems. Firms should be able to demonstrate and discuss previous projectsthat achieved very high levels of customer satisfaction with the design and construction services.Principals of interested firms must be appropriately licensed and/or registered in the Commonwealth ofKentucky to provide the requested services.SECTION NO. 2- BACKGROUNDIn 2017, the City of Paducah awarded the City Hall Improvements- Phase 1 project to A&K Constructionfor exterior restoration at Paducah City Hall, located at 300 South 5th Street, Paducah, Kentucky. ThePhase 1 project included concrete repairs and replacements; steel beam stabilization of the roofcantilever; roofing membrane and skylight replacement; exterior door and window replacement; andreplacement of HVAC source equipment.Phase 1 was completed in 2019, but in February 2025, deterioration became evident on the undersideof the cantilever porch. A preliminary examination identified structural overstress in the canopy. TheCity Hall Stabilization Project will address the structural issues of the roof and support columns. Thebuilding is currently in active use and will remain in use during the construction project. All proposalsshould consider both the building's current use and its historic character. The building is currently listedon the National Register of Historic Places, McNP-56, Ref# 100000742.The Project will also address the external water drainage system. During Phase 1, the roof and moatdrainage systems were removed from the external drain system and rerouted to reduce water volume.The trench drain casings have collapsed and allowed dirt and debris to infiltrate the drain system. Thishas left a void underneath the entrance and exit ramps to the parking garage, with possible cloggeddrain traps and piping.The system can no longer handle the already reduced water volume.1SECTION NO. 3- PROJECT DESCRIPTIONThe City Hall Stabilization Project has two (2) components:1. Rehabilitation/replacement of the cantilever portion of the roof and the support pillars.2. Rehabilitation/replacement of the building’s external drainage system.SECTION NO. 4- SCOPE OF SERVICES1. Permitting: Coordinate and file all necessary regulatory permits for all components of theproject.2. Design: Meet regularly with the City Project Team to ensure compliance with all projectrequirements and expectations.3. Construction Documents: Provide preliminary and final construction design (30%, 60%, 90%,100%) documents and services for the project.4. Construction Costs: Provide necessary interim opinions of project cost during projectdevelopment. Interim cost estimates are essential for the owner to make critical projectfinancial decisions regarding overall project resources and budgeting.5. Public Meetings: Participate in City Commission and other public meetings as requested forpresentation of project design. The selected firm is expected to provide presentations/updatesto the Board of Commissioners at critical project milestones. At a minimum, these will occur atproject milestones during the design development phase; before the Construction bid phase;before awarding the construction bid; every quarter during construction; before substantialcompletion; and before closeout.6. Bid development: Prepare and issue all bid documents for construction. Facilitate the pre-bidmeeting. Review and qualify the bids received for the project7. Construction Administration: The project manager will maintain regular communication withthe construction contractor to ensure the project is built to the approved plans, within budget,and in compliance with all regulatory requirements. Coordinate monthly progress meetingsduring the construction process. Review and approve all submittals; prepare field reports;request contract modifications; respond to Requests for Information (RFIs); prepare the punchlist; and provide other traditional construction administration services. Daily oversight andmanagement of the project is required.8. Construction Observation, Inspection & Testing: The project manager will provide appropriatepre-qualified field inspection personnel for the work during all phases of construction. Preparedaily inspection reports. Perform all necessary field testing. Daily oversight and management ofthe project is required. The project manager will provide all reports required by national andstate historic preservation regulations.9. Project Closeout: Complete necessary close-out procedures to ensure successful projectdelivery, including delivery of “As-Built” documents.SECTION NO. 5- TIME LINE1. RFP IssuedThis RFP is officially issued on February 13, 2026.22. Pre-Bid MeetingA MANDATORY pre-bid meeting will be conducted on Thursday, February 19, 2026, at 10:30 amCST at Paducah City Hall, 300 South 5th Street, Paducah, KY 42003. All interested firms mustattend this meeting.3. Question and Answer Period and ProtocolPlease direct all inquiries regarding this project to Chris Yarber, Paducah Public Works Director,at cyarber@paducahky.gov. Please clearly mark your email inquiries as “RFQ 2026-CITY HALLSTABILIZATION PROJECT Inquiry” in the subject line. No phone inquiries will be accepted.The City Project Team will respond to your questions in writing as soon as possible. The deadlinefor questions is set for Friday, February 27, 2026, at 12 noon CST. All inquiries and responseswill be available on the City’s website (http://paducahky.gov/request-bids-or-proposals) andupdated as needed. All responses will come from Chris Yarber, Public Works Director. Alladdenda will be posted to the City’s website, and it is the responsibility of the respondent tocheck for addenda before submission of the Proposal.4. Proposal DueYour completed Proposal is due to the City of Paducah by 4:30 p.m. CST on Friday, March 13,2026. Please submit five (5) hard copies of your submittal for our review. Please mail or handdeliver your submittal to:City of PaducahAttn: RFQ 2026-CITY HALL STABILIZATION PROJECTCity Clerk’s Office300 South 5th StreetP.O. Box 2267Paducah, KY 42002NO ELECTRONIC SUBMITTALS WILL BE ACCEPTED. No late submissions will be accepted.5. Oral Presentation InterviewsInterviews will be conducted for the shortlisted firms. The interviews will be limited to one (1)hour per firm. The firm will be required to deliver an oral presentation supported byPowerPoint, demonstrating its relevant experience and outlining its strategy to meet the City ofPaducah’s needs. All members of the firm who are essential to the project should attend theinterview. The interviews will be conducted at Paducah City Hall, 300 South 5th Street, Paducah,KY 42003.6. Board of Commissioners Presentation and Project AwardThe selected firm will be required to present to the Paducah Board of Commissioners, at aregularly scheduled meeting, an outline of its qualifications and plan for the design of the CityHall Stabilization Project.3SECTION NO. 6- SUBMITTAL REQUIREMENTSFirms interested in this project should submit a Proposal in five (5) hard copies by 4:30 p.m. CST onFriday, March 13, 2026. Comb binding is preferred, but not mandatory. Firm’s submission must conformto the following: All sets must be appropriately labeled. Each set shall be organized using the tabsspecified below. Firm(s) will be selected through a matrix-based selection process based on the criteriabelow.Submittals must be received by the specified date and time. On the submittal package, please display:Firm Name, Project Title, and RFQ number. All submittals shall be addressed to:City of PaducahAttn: RFQ 2026- City Hall Stabilization ProjectCity Clerk’s Office300 South 5th StreetP.O. Box 2267Paducah, KY 42002REQUIRED FORMAT, PAGE REQUIREMENTSSubmittal Cover Letter: one (1) page cover letter, two (2) pages of financial informationTAB A: Project Experience (three (3) pages per project, maximum of three (3) projects). PastPerformance Letters of Recommendation (maximum one per project identified)TAB B: Key Project Personnel Resumés (one page per resumé, plus organizational chart)TAB C: Method of Approach (maximum 10 pages)TAB D: Cost Proposal (maximum 5 pages)Adherence to the maximum page criterion is critical: each page side (maximum 8 ½” x 11”) with criteriainformation will be counted. Pages that have project photos, charts, and/or graphs will be countedtowards the maximum number of pages. Front and back covers, Table of Contents, and divider (tab)pages will not be counted unless they include qualification information that the selection panel couldconsider. Resumés should provide information for key project staff (no company profiles) and shouldnot include project pictures or general firm details. Any additional company or non-key staff informationcontained in the resumé section will count toward the maximum page allowance. Do not submitadditional information not listed herein. Font size must be at least 11 points.COVER LETTERWithin the one-page cover letter, include:• Firm’s full legal company name and DBA (if applicable)• Address• Phone number• Website• Firm’s Federal tax identification number (EIN)4
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Safe Streets For All Construc...
Project ID: Title: Safe Streets For All Construction Project Addenda: 0 Release Date:
Boone County
Bid Due: 7/16/2026
RFB-276-26 22013AMDFMSO, Lee ...
Description: RFB-276-26 22013AMDFMSO, Lee County Department: Facilities & Support Services Buyer: Kristi Sharp
State Government of Kentucky
Bid Due: 7/16/2026