Office Data Cable Infrastructure
Project Information
- Bid Title
- Office Data Cable Infrastructure
- Issuing Agency
- South Coast Air Quality Management District
- Location
- California
- Published Date
- Nov 7, 2025
- Closing Date
- Jan 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- P2026-04
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number Title Bidder's Conference Closing Date Contact Person Document P2026-04 Office Data Cable Infrastructure
Bidders’ Conference
Room CC-6
12/2/25
9:00 AM1/9/2026
01:00 PMDé Groeneveld
(909) 396-2907P2026-04
- Attachment Preview
-
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICTREQUEST FOR PROPOSALSOFFICE DATA CABLE INFRASTRUCTUREP2026-04South Coast Air Quality Management District (South Coast AQMD) requests proposals for thefollowing purpose according to terms and conditions attached. In the preparation of this Requestfor Proposals (RFP) the words "Proposer," "Contractor," "Consultant," “Bidder” and “Firm” areused interchangeably.PURPOSEThe purpose of this RFP is to identify and select the vendor(s) capable of providing the SouthCoast AQMD with the most cost-effective data cabling infrastructure upgrade.INDEX - The following are contained in this RFP:Section ISection IISection IIISection IVSection VSection VISection VIISection VIIISection IXSection XSection XIBackground/InformationContact PersonSchedule of EventsParticipation in the Procurement ProcessStatement of Work/Schedule of DeliverablesRequired QualificationsWarrantyProposal Submittal RequirementsProposal SubmissionProposal Evaluation/Contractor Selection CriteriaSample ContractAttachment A - Participation in the Procurement ProcessAttachment B - Certifications and RepresentationsAttachment C - Parts ListAttachment D – Floor PlanSECTION I: BACKGROUND/INFORMATIONThe South Coast AQMD is a regional governmental agency responsible for the regulation ofsources of air contaminants in the South Coast Air Basin.South Coast AQMD personnel includes scientists, engineers, chemists, planners, inspectors,attorneys, technicians, and administrative support staff. South Coast AQMD functions includepermit issuance, compliance, planning, air monitoring, and administration.The South Coast AQMD maintains staff responsible for the administration, maintenance, andrepair of the South Coast AQMD’s computer infrastructure. This includes personal computers,servers, local and network printers, Audio Visual Equipment, and the telecommunicationsnetworks (i.e. voice-data network backbone, local area network, and wide area network).As the South Coast AQMD’s computer applications have grown, so have the demands on localarea network bandwidth.In certain areas of South Coast AQMD’s Headquarters building, the data cabling infrastructure isoutdated or non-existent. The 3rd floor of the South Coast AQMD’s HQ building is in need ofreplacing the current non-working data cabling infrastructure to the latest Industry specifications.Part of this RFP is the removal of all old cabling and equipment from the 3rd-floor. Attachment Cis the required parts list and our preferred vendors for this project are APC, Cisco, and Panduit.SECTION II: CONTACT PERSON:Questions regarding the content or intent of this RFP or on procedural matters should beaddressed to:De Groeneveld – Information ManagementSouth Coast AQMD21865 Copley DriveDiamond Bar, CA 91765-4178(909) 396-2907e-mail: dgroeneveld@aqmd.govSECTION III: SCHEDULE OF EVENTSDateNovember 7, 2025December 2, 2025January 9, 2026January 23, 2026April 3, 2026April 21, 2026EventRFP ReleasedBidder’s Conference*Proposals Due to South CoastAQMD - No Later Than 1:00 pmProposal EvaluationsGoverning Board ApprovalAnticipated Contract ExecutionA Mandatory Bidder’s Conference will be held to present additional information, answer questionsand provide a tour of the facility. All prospective bidders that will be acting as a prime contractoron the contract should attend this conference. The Bidder’s Conference will be held in Room CC-6 at South Coast AQMD Headquarters in Diamond Bar, California at 9:00 am on Tuesday,December 2, 2025. Please contact De Groeneveld at (909) 396-2907 by close of business onWednesday, November 26, 2025, if you plan to attend.SECTION IV: PARTICIPATION IN THE PROCUREMENT PROCESSIt is the policy of South Coast AQMD to ensure that all businesses including minority businessenterprises, women business enterprises, disabled veteran business enterprises, and smallbusinesses have a fair and equitable opportunity to compete for and participate in South CoastAQMD contracts. Attachment A to this RFP contains definitions and further information.SECTION V: STATEMENT OF WORK/SCHEDULE OF DELIVERABLESA. Project Goals and ObjectivesThe South Coast AQMD’s strategic initiative with respect to information management is towardopen systems, interoperability, application portability, hardware scalability, and client-serverarchitecture. The primary means adopted by the South Coast AQMD for fulfilling this overallobjective is through integrated networks and platforms using the TCP/IP protocol suite.The foremost goal of this procurement is to upgrade the South Coast AQMD’s data cablinginfrastructure to a level that will meet both current and future needs. The upgrade must becompatible with South Coast AQMD’s current operating environment and provide flexibility fortechnological evolution.Specific goals for the data cabling infrastructure upgrade include the following:• Panduit certified installers• The expected life span of minimum 10 years;• Easily integrated with the current network infrastructure;• Minimize staff impact during normal work hours (Tuesday – Friday, 7:00am – 5:30pm);• Must coexist with current data wiring infrastructure;• Turn-key solution;• Each data cable must have a unique permanent identification at both ends (clear,legible, and permanent);• Each data plate/panel must identify the unique associated cable identification (clear,legible, and permanent);• Designed to facilitate normal adds/moves/changes and identification;• Cables shall run parallel or at right angles to the building structure, and shall not belooped diagonally across the ceiling space.• Cables shall run in existing cable tray/runways.• Cables should avoid all sources of EMI (electromagnetic interference).• Cables must avoid all sources of heat such as heating ducts and hot water pipes.• Do not lay cables on suspended ceilings.• Cables must never exceed a 90-degree bend radius.• Must leave some slack (minimum 6 feet) on each end of cable run in the event ofservicing or other requirements.• Cat-6a patch cables must be provided for any patch panel installations.• Provide J-Hooks or equivalent for cable support. Cable shall be supported at 5-6 footspan intervals.• All components shall be factory new, not reconditioned or refurbished.• All components shall be an available commodity and vendor supportable at the time ofaward;B. Statement of Work/Deliverables1. The following tasks are associated with this RFP:• Installation of Category 6a (ANSI/TIA/EIA 568 B.2‐1 & ISO/IEC 11801Ed. 2.0) plenum (NFPA 262) cabling for data locations with a 6 ft. serviceloop at the designated zone cabling enclosure;• Vendor must verify and confirm the length of all data cables run betweenthe data closet, the assigned zone cabling enclosure locations,cubicle/office and, conference rooms;• Vendor must verify and confirm the quantity of all materials that areneeded to finish the project;• All data cables and connectors must be installed in accordance with goodengineering practices as approved by the TIA/EIA, NEC, and all applicablelocal building codes;• All data cables run must have a permanent unique identification at each end;• Data cables should be in available cable tray, suspended every 5-6 feet indrop ceilings using J or D style hooks or in enclosed conduit;• All data cables must be properly terminated in the data closet andnewly installed zone cabling enclosure and assignedoffice/conference rooms, per Panduit specifications:• All data cables must be properly terminated and ready to be patched tothe Cisco 9300 network switch in the data closet;P2026-04• All data cables must be properly terminated and ready to be patched fromthe zone cabling enclosure to the cubicle wall plate;• The vendor is responsible for all materials, labor, and all otherassociated apparatus necessary to completely install, test, andturnover the wiring infrastructure;• Vendor must test and provide associated reports for all data cableruns according to industry standard.• Install 6 zone cabling enclosures in specified locations on the 3rdt floorsouth office building;• Install 120 CAT6a data cables from the closet (3 West) to 3 zonecabling enclosures; 1x24 and 2x48.• Install 24 CAT6a data cables from the closet (3 West) to offices, conferencerooms break rooms and spares;• Install 120 CAT6a data cables from closet (3 East) to 3 zone cablingenclosures: 1x24 and 2x48.• Install 24 CAT6a data cables from the closet (3 East) to offices, conferencerooms break rooms and spares;• Install 40 access points (CW9176I-CFG);• Removing outdated data cabling from all the network trays to the offices, openoffice and conference rooms; (CAT3 and CAT5e)• Removing outdated 2 post network rack and installing new Panduitnetwork cabinet in data closet (3 West and 3East);• Relocate existing fiber to the new Panduit network cabinet;• Install Cisco network switches;• Install rackmount APC Uninterruptable Power Supplies;• Install rackmount Panduit Power Distribution Units;• Labeling patch panels and wall plate jacks with indelible labels/inkindicating closet location and unique identified port number;• Attachment D reference the floorplan with IDF closet location,cable tray/raceway, and zone enclosure locations;• Attachment C reference required parts list and descriptions.2. Under this RFP vendor must submit detailed proposals for the South Coast AQMD’sdata wiring infrastructure upgrade. The proposals must include, but are not limited to,the following:• A proposed methodology for the cabling, testing and delivering the productsaccording to Industry Standard;• Work Schedule;• Project timeline;• A detailed list of materials and supplies;• The approximate number of staff that will be working on the job;• Total project cost with itemized cost breakdown (e.g. labor, materials, permits,etc.);3. The data wiring infrastructure delivered under this RFP must include the following at aminimum:• Materials and workmanship specified and furnished must: be fully guaranteedby the vendor for a twenty-five (25) year extended product warranty period;meet all Plenum, TIA, ETL and UL specifications, physically tested according tothe acceptable standard; and be tested to deliver Ethernet connection betweenthe closet patch panel, zone cabling enclosure, cubicle/office and, conferencerooms . The vendor shall promptly, and at no cost to the South Coast AQMD,correct any nonconforming or defective work within the warranty period. Thesupplying vendor must be the single point of contact for all warranty service.P2026-04• Vendors shall not be allowed to substitute cable components after the award ofthe contract without written approval from the South Coast AQMD.• All work shall conform to the latest edition of the National Electrical Code, thebuilding code, and all local codes and ordinances, as applicable. All installationactivities shall adhere to all standards. Methodologies outlined in the latestedition of BICSI Telecommunications Distribution Methods Manual shall also beused during all installation activities.4. Inspection and Acceptance:Inspections –On-going inspections shall be performed during construction by the vendorproject manager and South Coast AQMD staff. All work shall be performed in ahigh-quality manner and the overall appearance shall be clean, neat andorderly. The following points will be examined and must be complied withsatisfactorily:➢ All cables are properly labeled from end-to-end.➢ All terminated cables properly tested in accordance with thespecifications for the specific category as well as tested for open, shorts,and damage.➢ All cable installations are installed per Panduit installation guidelines➢ The pathway manufacturer’s guidelines have been followed.➢ All cable penetrations installed properly and fire stopped according tocode.➢ Have the contractors avoided excessive cable bending.➢ Hanging supports are within 1.5-2 meters (5 -6 feet).➢ Hanging cable does not exhibit sag.➢ Telecommunications closet terminations are compatible with applicationsequipment.➢ Patch Panel instructions have been followed.➢ Termination positions are correct.➢ All pair terminations are tight with minimal pair distortion.➢ Cable dressing has been done.➢ The correct outlet connectors are used.➢ All identification markings are uniform, permanent and readable.5. Acceptance:➢ Test Report - The vendor must test all cable pairs, after they have beenterminated, according to standards and business practice. The cablingvendor must provide a full copy of all test results in both hard copy andelectronic form, with the following information:Cable identificationDate of testCable distanceName of the testerPass/fail condition and cable map➢ All field testing shall be performed with an approved level IIIe field testdevice by a known Major manufacturer and also by standards of theAmerican National Standards Institute (ANSI) and theTelecommunications Industry Association (TIA). All installed cables shallperform equal to or better than the minimum requirements by theindustry standard.➢ All field testers shall be factory calibrated each calendar year by the fieldtest equipment manufacturer as stipulated by the manuals provided with
- Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
California Abandoned Mine Lan...
Follow California Abandoned Mine Lands Agency Group (CAMLAG) Database Application Phase 3 Active
DEPT OF DEFENSE
RFB-IS-26201083 - 26-00951-20...
RFB-IS-26201083 - 26-00951-2026 MARINA SUMMER CONCERT DRESSING ROOMS - Closing: 7/6/2026 12:00 PM
City of Los Angeles
Bid Due: 7/06/2026