Criminal Justice Information Exchange Addendum 2
Project Information
- Bid Title
- Criminal Justice Information Exchange Addendum 2
- Issuing Agency
- State of Vermont
- Location
- Vermont
- Published Date
- Jun 12, 2026
- Closing Date
- Jun 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER Criminal Justice Information Exchange
Additional Documents
Addendum 1
Addendum 2
05/20/2026 04:30PMQuestions Answered & Bidders Conference CJIX. (06/12/2026)
06/26/2026 04:30PM
- Attachment Preview
-
Agency of AdministrationDepartment of Buildings and General ServicesOffice of Purchasing and Contracting133 State Street, 5th FloorMontpelier, VT 05633June 12, 2026Criminal Justice Information ExchangeAddendum #21. A revised Q&A document has been posted which includes questions that were answeredduring the bidders’ conference. It is attached to this addendum and an Excel version can bedownloaded from the bid listing website: http://www.bgs.state.vt.us/pca/bids/bids.phpEnd of Addendum #2Kyle EmersonState Purchasing Agent IIkyle.emerson@vermont.gov(802) 249-7394QUESTIONS AND ANSWERS6/12/2026#ReferenceCriminal Justice Information ExchangeQuestionAnswer1. Please provide the approximate annual transaction volume, number of1connected agencies, and simultaneous terminal sessions the new CJIX solutionmust support to allow sizing of cloud infrastructure and network bandwidth.1,800 active users. 140 agencies (mix of municipalities, state, and federal agencies). 315Messenger Stations in the State.23456 System2. Will the State accept CJIS compliance letters of attestation from a FedRAMPModerate baseline pending final CJIS audit, or must the proposed SaaSenvironment already host live CJIS production workloads at contract award?The State does not understand the question, and is open to hearing clarification at theBidder's Conference3. What is the current platform/vendor for the legacy message switch andcriminal history database, and will the State provide data schemas, interfacespecifications, and database export scripts to facilitate migration and parallel- Vendor = CPI, Platform = OpenFox. We will facilitate data migration to the extent that werun testing?can.4. Please confirm the relative weighting of technical approach, vendorexperience/past performance, and cost in the best-value evaluationmethodology.While exact values cannot be provided, each will have significance during evaluation.5. Does the State expect a single “big-bang” cutover or will modules (e.g.,NCIC/NLETS switch, CCH, admin tools) be accepted in staggered releases? Ifphased, please supply the desired sequence and target go-live dates for eachmodule.Given the current co-location of the switch and CCH, a single cutover is preferred.· What operating system is used by the current system (e.g. Windows server,Linux. IBM AIX, etc.)?The current system runs on Linux7 System· What local files (e.g. ORI lists or system assistance help files) are stored inthe current system, outside the normal configuration elements (e.g. DeviceName, user identification and permissions, etc.)?Please clarify the question -- vendors use different configuration methodologies.8 Client Interfaces9 Client Interfaces10 Client Interfaces· Does the current system support stand-alone interactive clients? If so, whatis the application (or applications) used? Do these applications provide datastreams in legacy text formats (e.g., Dot-Slash)format (e.g., GJXDM, NIEM, OFML, etc.)?orXML?IfXML,whatistheXMLYes, the current system'swhich uses OFML.primarystand-aloneinteractiveclientisOpenFoxMessenger,· What data stream strategy is used by computer to computer interfaces Yes, the current system supports computer to computer interfaces with Motorola's Flex,such as city CAD or RMS, etc. (e.g. Dot-Slash) or XML? If XML is used, what is the Crosswind's Valcour, WatchSystems' OffenderWatch, and CRASH Services' WebCrash. TheXML overall format (e.g. GJXDM, NIEM, OFML, etc.)?interfaces use XML -- primarily OFML· What communications strategy is used (Web Service, TCP sockets, Telnet,etc.)?The current system uses a mix of Web Services and TCP sockets.11 Client Interfaces· Please provide an Interfacedetailing the messages used.ControlDocument(ICD)orMessageKeybookDefined in the NICS Manual, theFingerprint File Operational andNCIC Operator's Manual, NLETs User Guide, NationalTechnical Manual NGI-DOC-90034-2.0, VTCCH, VTDMV12Data Source Interfaces - VermontDepartment of Motor Vehicles (DMV)VT TRIPS· What is the communication strategy (e.g. TCPIP sockets, Web Services, IBMLU6.2, etc.)?The DMV interface uses secure Web Services (HTTPS) for communication.13Data Source Interfaces - VermontDepartment of Motor Vehicles (DMV)VT TRIPS·XMLWhat is theis used, whatdata stream strategy (e.g. legacy textis the XML overall format (e.g. GJXDM,formats, XML, etc.)?NIEM, OFML, etc.)?IfThe DMV interfacetransmission.usestheNIEMXMLstandardwithanOFMLwrapperfordata14Data Source Interfaces - VermontDepartment of Motor Vehicles (DMV)VT TRIPS· Please provide an Interface Control Document (ICD) detailing the messagesused.Documentation for specific interfaces and messages will be provided to the winning bidder.· What is the data stream format used (e.g. Nlets string, Nlets GJXDM, Nlets15 NletsNIEM)?The Nlets interface uses Nlets NIEM.· Are responses sent in standard formats such as CANDLE for requests for16 Nletsdriver and vehicle information from the Vermont DMV?The Nlets responses use the CANDLE 3.0/2.0 format.National Crime Information Center · What is the communication strategy (e.g. TCPIP sockets, Web Services, IBM17 (NCIC)LU6.2, etc.)?The NCIC intertace uses TCPIP sockets.National Crime Information Center · What data stream format is used for NCIC Hot Files messages (legacy dot-18 (NCIC)slash or NCIC NIEM XML)?The NCIC interface uses legacy dot-slash (NCIC 2000) format for NCIC hot files messages.National Crime Information Center · What data stream format is used for NICS messages (legacy dot-slash or19 (NCIC)NCIC NIEM XML)?The NCIC interface uses legacy dot-slash (NCIC 2000) format for NICS messages.National Crime Information Center20 (NCIC)Vermont Criminal Conviction Record21 Internet Service (VCCRIS)· What data stream format isCriminal History responses and NICSused for asynchronousresponses (legacy text orresponses such asNCIC NIEM XML)?The NCIC interface uses legacy dot-slash (NCIC 2000)for Criminal History responses and NICS responses.formatforasynchronousresponseslike· What is the communication strategy (e.g. TCPIP sockets, Web Services, IBM The VCCRIS interface currently uses TCPIP sockets for communication, but we'd prefer aLU6.2, etc.)?modern web service.Vermont Criminal Conviction Record22 Internet Service (VCCRIS)· What is the data stream strategy (e.g. legacy text formats, XML, etc.)? IfXML is used, what is the XML overall format (e.g. GJXDM, NIEM, OFML, etc.)? The VCCRIS interface uses legacy dot-slash (NCIC 2000) format for data transmission.Vermont Criminal Conviction Record · Is biometric information passed through the current system from live scan23 Internet Service (VCCRIS)devices? If so, what data types and format (e.g. NIST)?The VCCRIS interface does not process biometric data.Vermont Criminal Conviction Record · Please provide an Interface Control Document (ICD) detailing the messages The VCCRIS interface sends and receives only a single message type. More detail will be24 Internet Service (VCCRIS)used.provided to the winning bidder.Automated Fingerprint Identification · What is the communication strategy (e.g. TCPIP sockets, Web Services, IBM25 System (AFIS)LU6.2, etc.)?The AFIS interface uses secure TCPIP sockets (SSL) for communication.26Automated Fingerprint IdentificationSystem (AFIS)· What is the data stream strategy (e.g. legacy text formats, XML, etc.)? IfXML is used, what is the XML overall format (e.g. GJXDM, NIEM, OFML, etc.)? The AFIS interface uses SFTP to transfer data between the current system and AFIS.27Automated Fingerprint IdentificationSystem (AFIS)· Is biometric information passed through the current systemdevices? If so, what data types and format (e.g. NIST) are used?fromlivescanTenprint data and mugshotusing NIST format.imagedataareprocessedandtransmittedbythecurrentsystemAutomated Fingerprint Identification · Please provide an Interface Control Document (ICD) detailing the messages28 System (AFIS)used.Documentation for specific interfaces and messages will be provided to the winning bidder.Computer Aided Dispatch/Records29 Management System (CAD/RMS)· What is the communication strategy (e.g. TCPIP sockets Web Services, IBMLU6.2, etc.)?CAD/RMS systems interface with the existing VLETS system using TCPIP for communication.Computer Aided Dispatch/Records30 Management System (CAD/RMS)· What is the data stream strategy (e.g. legacy text formats, XML, etc.)? IfXML is used, what is the XML overall format (e.g. GJXDM, NIEM, OFML, etc.)? CAD/RMS systems interface with the existing VLETS system using OFML XML.Computer Aided Dispatch/Records31 Management System (CAD/RMS)Mugshot application – the MugShot32 application· Please provide an Interface Control Document (ICD) or Message Key bookdetailing the messages used.Documentation for specific interfaces and messages will be provided to the winning bidder.· What is the communication strategy (e.g. TCPIP sockets, Web Services, IBMLU6.2, etc.)?The mugshot application is a Web Service using HTTP.Mugshot application – the MugShot33 applicationMugshot application – the MugShot34 applicationMugshot application – the MugShot35 application36· What is the data stream strategy (e.g. legacy text formats, XML, etc.)? IfXML is used, what is the XML overall format (e.g. GJXDM, NIEM, OFML, etc.)? The mugshot application's backend communicates directly with the CCH DB.· What image formats are usedbinary or Base64 XML, Unisys USBO(e.g. JPG rawbinary, etc.)?JPGinbinary,DatamaxxDSEOThe mugshot application uses a local repository of JPEG images saved by the AFISintegration. The images are retreived from AFIS in NIST format but stored and transmittedMugshot application users as JPEG binary streams.to· Please provide an Interface Control Document (ICD) or Message Key bookdetailing the messages used.Documentation for specific interfaces and messages will be provided to the winning bidder.Would the State consider alternative commercially reasonable approaches tothe Service Credit requirements, including mutually agreed contractual remediesand service level provisions in lieu of the prescribed service credit structureoutlined in the RFP?YesCJIS Companion Requirements – Line37 28, Section 3.2.8Missing requirementsCJIS Companion Requirements – Line38 35, Section 3.2.10Missing requirements1. Would the state of Vermont be open to having the solution hosted in the39State’s cloud tenant, operated and managed by the vendor?not a requirement, it stands as a heading for 3.2.9. 3.2.9: An orderly approach to securityresponsibilities requires personnel to track authorized users, document system connections,enforce screening requirements, verify security controls, and promptly report incidents.Vendors can achieve this by maintaining inventories, updating system documentation,following State screening policies, performing control evaluations, and ensuring staffunderstand incident reporting expectationsmissing requirement, no responseYes, provided the vendor ensures the solution in the cloud environment complies with CJISSecurity Policy.2. Is the state of Vermont open to purchasing software/cloud subscription on aseparate contract (via the State’s reseller of choice) and contracting with thevendor only for the service? (The vendor will provide the State specification of40the software that needs to be purchase, buying through a state contract isanticipated to be financially advantageous to the State.)The state will consider legal procruement methods that meet the functional and nonfunctionrequirements of this initiative.1. The RFP indicates a contract start date of July 1, 2027 with a 12-month41implementation period. Does this timeline apply to Scope E (Procurement andContracting)? Please clarify how procurement activities required to supportCJIX implementation would be executed prior to that date. Alternatively, is anearlier start anticipated for Scope E?The contract start date represents the beginning of the Execution Phase, as procurementand contracting (creating the contract) will need to be completed ahead of this date. Theteam expects vendors to work on a minimal basis with the State to effect a completed andreiewed contract.2. The Bidder Response Form appears oriented toward solution42implementation scopes (e.g., technology capabilities, functional/systemrequirements). For vendors bidding solely on Scope E (Procurement andContracting), can the State clarify which sections of the Bidder Response Formare required to be completed to be considered responsive? Additionally, arealternative or supplemental formats acceptable for describing procurementand advisory capabilities?The State acknowledges that the Bidder Response Form has elements that may not beapplicable to Scope E. Bidders are advised to respond 'Not Applicable' to any section whichthey deem irrelevant to their proposal. Bidders may include materials they feel relevant todescribing their procurement and advisory capabilities in their Technical Response. Biddersare reminded that only content marked for redaction will be withheld from public recordsrequests.3. Could the State provide more specificity around the scope of E in terms oftimeline and deliverables? To aid with preparing an accurate proposal, can the All procurement activities shall be executed according to the standards set within StateState clarify the expected depth of involvement for Scope E across the full CJIX Bulletin 3.5. The number and complexity of procurement events shall be determined as thelifecycle (e.g., advisory vs. hands-on execution of procurements) and specific implementation and decommissioning roadmap is defined. The selected bidder will workprocurement events that are currently anticipated (e.g., number and type of closely with the State and with the bidder responsible for developing and managing the43RFPs, etc.)?roadmap to sequence and execute procurement activities.4. The RFP states that vendors must be registered with the Vermont Secretaryof State and obtain a Business Account Number to be awarded a contract. Canthe State confirm that registration is only required prior to contract execution,44rather than at the time of proposal submission?Yes, we can confirm registration is only required prior to contract execution1. The supplied platform overview diagram shows the complete picture ofinterconnected systems. Which components are priority for modernization? Only those in the "Modernization Platform" Container in addition to the Mugshot &Only those that are in the “Modernization Platform” container or otherArchiving functions. In Total: Message Switch, CCH, Mugshot Application, Archiving45applications as well?Application2. Regarding scope A, what are all the components that would be necessary for46a Complete Solution response?Message Switch, CCH, Mugshot Application, Archiving Application3. Regarding scope B, how would a vendor know which subset modules thatare a target for replacement? Could you provide some specificity regarding47which subset modules are needed?Message Switch, CCH, Mugshot Application, Archiving Application4. The RFP permits bidders to submit proposals for any or all scopes, exceptScope E. We are considering a proposal in which we would provide customSaaS subset modules under Scope B, excluding the message switch, and alsoprovide the related modular architecture, implementation management, andintegration services under Scope C, including integration with either theexisting message switch or a future replacement message switch selected bythe State. As those replacement modules are implemented, we would alsoexpect to perform related decommissioning activities for the correspondinglegacy components under Scope D. Is the State’s intent that a single biddermay propose this combined Scope B/C/D approach, and if so, should thebidder present the work as one integrated proposal with separate scope,48deliverable, and pricing sections for B, C, and D, or as separate standaloneproposals for each scope?Bidders may submit an integrated proposal in their technical submission. Please distinguishbetween scopes B, C and D in the submitted pricing proposal.5. Can you expound on the generic use cases alluded to by the followingstatement in section 2.3 “…application and management system that provides Users of the system, whether identifying as an individual, division, or agency/organization,capabilities such as text messaging, unit identification, message formatting, should be able to send and receive text-based queries and responses to access data throughand queries for State and various local law enforcement/local justice partner the system. The solution should follow the principle of least privilege and use unit49database use. “identification to ensure messages are delivered appropriately.6. How ORIs are provisioned and administered in the CCH environment?In the current system, ORIs are provisioned and managed the same way for CCH and the rest50of the system -- using a GUI-based configuration editor tool from within the application.Please restate the question. ORIs are identifiers that can refer to individual or group7. Do ORIs have access to the querying the message switch or is there another destinations. All consumers of message switch data access that data through the messagepathway for them to inquire for relevant data?switch (which handles access control and authorization), not by directly querying upstream51data sources.8. To ensure long-term sustainability and the ability for in-house staff toperform maintenance, does the State have a specific approved technical stackor any prohibited technologies according to the Agency of Digital ServicesWe currently utilize Splunk for log ingestion and processing. Other technological solutions52standards?that meet the business requirements will be considered.9. Does the State anticipate a single prime integrator across all awardedscopes, or independent contracts managed directly by the State? If the former,53what authority will the system integrator have over other vendors, legacyvendors, agency technical teams, and external partners?All authorities will ultimately lie with the state and specific contractual requirementsdetailed for any/all contractors.If multiple vendors are selected, who owns:1.integra on accountability,2.defect triage,3.SLA coordina on,4.release management,If multiple vendors are chosen, the SoV will make determinations regarding ownership of the545.and opera onal governance?various sections at that time.Can you provide an enumerated list of all of the types of transactions/MKEs, that55the VLETS message switch implementation handles or responds to?Yes, will provide to winning bidderPlease provide additional details regarding the current technical stacks forapplications in the CCH environment, including:1.database pla orm/vendor and version2.database sizeSpecific documentation releated to the database and application can be provided to the563.applica on frameworkswinning bidder. The current platform is Oracle.1. Can you share the database schema or any documentation about the CCH57database?Specific documentation releated to the database can be provided to the winning bidder.2. The RFP describes the current solution as “monolithic” and “tightly coupled”.What specific technical hurdles or proprietary dependencies currently exist thatmight hinder the systematic deconstruction of the targeted parts of the58platform.All existing solutions are managed by one contract and technology platform.Yes. The legacy CJIS solution relies on proprietary CPI (OpenFox®) components— including3. Are there any proprietary CPI dependencies that might impact migration or message switch logic, MKE routing, schemas, interfaces, and configurations. Theseintegration?dependencies may affect migration and integration activities. The State will provideavailable interface specifications, extracts, and technical details, but some components59remain proprietary to CPI and may require redevelopment or coordinated transition4. Are all proposed modules expected to be implemented in the 12-monthYes, but open to a potential 18-month implementation (need input from team if this is60period?acceptable)5. How does the current CCH system interfaces with VT TRIPS, VCCRIS,CAD/RMS, existing VLETS message switch, and other external systems?Specifically, are these integrations implemented through APIs (SOAP/REST), Available details of these interfaces are described in answers to questions about the specificmessage queues, web services, direct database connections, file transfers, or interfaces. The current system uses a mix of web services, socket connections, and file61other mechanisms?transfers. More detail will be provided to the winning bidder.626. How does your current CCH receive and process court dispositions?Flat file provided by the courts is manually uploaded and processed by CCH records staff7. Please describe the State’s current sealing and expungement processes63related to criminal history records.https://vcic.vermont.gov/ch-information/repository/expungement-sealing-pardonThe solution must meet the availability requirements specified by the CJIS Security Policy,8. What are the mandatory RTO/RPO, uptime, redundancy, and failoverrequirements by component?including the Contingency Planning section, which specifies that there should be a plan, "forthe resumption of essential mission and business functions within twenty-four (24) hours ofcontingency plan activation." Specific per-component requirements will be discussed with64the winning bidder.9. What level of 24x7 operational support is required: automated monitoringonly, on-call engineering, staffed NOC/SOC, help desk, incident commander65coverage, or full production operations?See SLA10. Is availability of a State-approved user help desk mandatory for contract66award?No11. The RFP contemplates SaaS and cloud technologies where appropriate. Forcustom SaaS subset modules proposed under Scope B, is the State open to avendor-hosted cloud deployment model, provided the solution satisfiesapplicable CJIS Security Policy, NIST 800-53, AAMVA, State of Vermontcybersecurity standards, SOC 2 Type 2, disaster recovery, data access/export, The state will consider technologies that meet the functional and nonfunctional67and SLA requirements?requirements of this initiative.The State’s answers to several key questions could materially alter the approachfor the solution. Would it be possible to extend the proposal due date to allow Not ideal, but could be discussed during the Bidders Conference (need input from team if68vendors to develop comprehensive responses?this is acceptable)In our experience implementing CCH solutions, it takes time with business usersto define State-specific configurations and business rules across the variouscapabilities (e.g., Arrest, Disposition, Rap sheet, Corrections status, Rap Back,Agency Maintenance, etc.), to create Interface Control Documents with interfacepartners, to implement the State-specific configuration, and perform testing. Isthe State open to a longer implementation timeline for the CCH scope to allowthe necessary time for the design, build, and testing of the State-specific69 Section 1.2 Contract Period in the RFP configurations and interfaces?Yes, to be negotiated during contracting70 Section 2.3 Objectives in the RFPSection 4.12 Retainage andAttachment B Payment Provisions in71 the RFPSection 4.6.1 Evaluation Criteria in72 the RFPCan the State provide a list of technology and business projects in the pipelinethat may impact the CJIX implementation, including major updates for interfacepartners that will occur during the implementation phase?See question 237The retainage mentioned in the sample standard contract terms omits the actualpercentage of the total amount to be withheld. Can the state provide theexpected retainage for this project?To be discussed with the winning bidder.Adherence to mandatory bidding requirements is Pass/Fail. Can the StateThe information is indicated in the RFP, please review the documentation available for yourconfirm which requirements are mandatory?information.Section 4.6.1 Evaluation Factors in73 the RFPSection 4.6.1 Evaluation Factors in74 the RFPIn the fourth row of the evaluation table, it identifies “experience, especiallywith state utility regulators”. Since this project is for the Department of PublicSafety (DPS) and the criminal justice system, can we assume that you are seekingexperience with DPS and criminal justice agencies?With the criminal justice system and criminal justice information specifically.In the first row of the evaluation table, it mentions “ease of use by members ofthe public,” but in the Technical Background, it emphasizes that the system is for In this case, members of the public should be considered those external to the core projectlaw enforcement (state, local, and federal) and authorized agencies. Can the team/CJIS Systems Agency. This may include law enforcement, criminal justice, orState clarify the number of internal/external authenticated users and public authorized non-criminal justice entities. Information on number of potential users/entities isusers?noted elsewhere.The RFP states that any exceptions to contract terms should be included in theSection 5.6.3 of the RFP & Part 9: cover letter. Part 9 of the Bidder Response form has a table for contractTerms and Conditions in the Bidder exceptions and proposed verbiage. Is it acceptable to reference in the cover75 Response formletter any exceptions listed in the table on page 86 of the Bidder form?YesSection 6 Submission Instructions in76 the RFPThe Bidder Response form requires several attachments in various file formats,including PowerPoint (ppt) and Excel. The RFP states that only ONE PDF fileshould be submitted. Does the State want ppt and Excel files to be included in asingle PDF with the cover letter and Bidder Response form?The bidder must print them out into a digestible fashion for the reviewing team to consider.That must be in the file format of PDF, as a single document. You are welcome to provideadditional documentation, but it is not guaranteed to be reviewed.Section 7 Bid Submission checklist in77 the RFPSection 4.7 CJIS SECURITY POLICYREQUIREMENTS of the Bidder78 Response formThe certificate of compliance is listed as a separate document to be submitted.However, this form is in Section 10 of the Bidder Response form. Please confirmthat we should use Section 10 of the Bidder Response form.Yes.To clarify, is the bidder to complete and submit BOTH CJIS Excel files (CJISRequirements Companion Document and Additional CJIS RFP ContractRequirements) as part of the bid submission?yesAttachment A, Section 7.2 Project79 Major Phases in the RFPCan the State provide a list of data sources to migrate from the legacy system,including the number of tables, columns, and records? Additionally, can theState provide the total size of the existing mugshot repository and the numberof images that need to be migrated?No, final decisions on data to be exfiltrated to be made laterThe State of Vermont – Federal Terms Supplement (non-Construction) ServiceLevel Agreement section, III. Responsibilities subsection, indicates that the StateResponsibilities include “Maintain software licenses and hardware warranties”.The Bidder Response Form requirement GR-00077 states, "The Contractor mustretain all responsibility and costs for all software, hardware, and infrastructureMaintenance and Operations necessary to fulfill their obligations of thisContract".Requirement GR-00074 states “The Contractor must implement, host (orarrange for third-party hosting), operate, maintain, and manage allinfrastructure, including all hardware, software, middleware, and licensesThe State of Vermont – Federalnecessary for successful operation of all systems and services under theTerms Supplement (non-Contract”.Construction), Service LevelGR-00077 -> The contractor is intended to maintain responsibility. GR-00074 -> providesAgreement section in the RFP and the Can the State confirm whether the Contractor is responsible for softwaresuitable options for the contractor maintaining the responsibilities. These two items are in80 Bidder Response Formlicenses and hardware warranties or if that is the State’s responsibility?alignment. Your organization must be prepared to meet these items.As a dispatch center supervisor withworkstations that simultaneouslydispatch for multiple agencies, I wantboth: all of my workstations and/or a Please clarify this requirement. The use of "both" followed by "and/or" issub-set of my workstations to receive confusing.inbound messages for all agenciesthat the dispatch center supports sothat my employees are informed.81As a dispatch center supervisor with workstations that simultaneously dispatch for multipleagencies, I want the ability to configure both: all of my workstations and/or a sub-set of myworkstations to receive inbound messages for all agencies that the dispatch center supportsso that my employees are informed.As a State Police Dispatcher andPlease detail what a "mobile command post station" is?Admin with the necessary rolepermissions, I want a mobileWill VT be providing the mobile command post station?command post station that can travelwith me to an emergency within any If the vendor is required to provide it, please detail the expectations for the unit:agency across the state which will the minimum requirements, functional requirements, hardware and softwareallow me to utilize any ORI that I specifications, and other details needed to satisfy this requirement.need to so that I can respondThis describes a scenario where a workstation may need to be installed on a terminal housedefficiently and effectively to theWhat is the minimum requirement needed to satisfy the "efficiently andwithin a mobile command center or station. Phyical equipment (computers) of this natureemergency.effectively" portion of this requirement? How are these measured?are not expected to be provided by the vendor - only the ability to be installed on standard82technology (computers).As an employee whodispatches/works at a consolidateddispatch center supporting multipleagencies, I want to receive messagesfor all agencies we support, with the Please provide details on how the "effectively" statement is measured. What areoption to filter messages to a specific the minimum requirements to ensure the system is allowing the user to workagency or agencies, so that I can"effectively?"effectively dispatch for multipleagencies simultaneously or focus on aspecific agency as needed by thedispatch center.Employees must receive messages for any agency they are currently supporting - this will83allow them to perform their work effectively.
- Commodity Codes
-
- NAICS 541511Custom Computer Programming Services
- NAICS 541519Other Computer Related Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541690Other Scientific and Technical Consulting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Proposals from qualified crea...
Request for Bidders Request Date: 6/29/2026 11:55:02 AM Open Date: 6/29/2026 Closing Date:
State Government of Vermont
Bid Due: 1/07/2027