Adams/Santa Cruz Waterline Project
Project Information
- Bid Title
- Adams/Santa Cruz Waterline Project
- Issuing Agency
- Town of Wickenburg
- Location
- Arizona
- Published Date
- Oct 9, 2025
- Closing Date
- Dec 10, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Bid 25-04
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: Bid 25-04
Bid Title: Adams/Santa Cruz Waterline Project
Category: Construction - Infrastructure Status: Open Description: Portions of the Town of Wickenburg existing water and sewer lines are at or nearing the end of their service life. As part of the Town of Wickenburg’s Water Master Plan these systems are being replaced within a 50-year horizon. The Town of Wickenburg is seeking construction services to install 8-inch ductile iron watermains, 6-inch sewer line, and other improvements within sections of Adams Street and Santa Cruz Street. The installation of the watermain will be a mix of replace-in-place and new alignments. The replacement of the water distribution main runs within the roadway of Adams Street between Apache Street and Santa Cruz Street and within Santa Cruz Street between Adams Street and Washington Street. The replacement of a section of 6-inch Vitrified Clay Pipe (VCP) sewer with SDR PVC pipe occurs within Santa Cruz Street between Adams Street and Jefferson Street. The sewer line will be removed and replaced along its existing alignment and grade. Existing water and sewer services will need to be reconnected, relocated, and/or replaced as part of this work. Coordination with customers for outages and other community outreach will be required for work within the area.
Other improvements include replacing two fire hydrants and installing a new one and pavement/surface treatments. Pavement resurfacing will be from gutter to gutter along the impacted roadways of the project area. Pavement will be milled and replaced to existing elevations. Additional flat work includes section of degraded sidewalk, curb, and gutter to be removed and replaced. The Town has identified specific locations for these replacements and improvements, including the installation of four ADA-compliant concrete sidewalk ramps at the intersection of Adams St and Yavapai St. The project site is located in Section 12, Township 7 North, Range 5 West.
Publication Date/Time: 10/9/2025 12:00 AM Closing Date/Time: 12/10/2025 11:00 AM Submittal Information: Town of Wickenburg, 155 N. Tegner Street, Wickenburg Bid Opening Information: December 10, 2025 at 11:00 AM Pre-bid Meeting: November 5, 2025 at 11:00 AM Contact Person: Matt Egan at 928-668-0559 or megan@wickenburgaz.gov Download Available: www.wickenburgaz.gov/bids Plan & Spec Available: https://www.wickenburgaz.gov/bids Business Hours: Monday-Thursday 7am - 6pm Fax Number: 928-684-6177 Miscellaneous: This project is funded as a Community Development Block Grant (CDBG) made available by the U.S. Department of Housing and Urban Development, managed by Maricopa County, Housing and Community Development Division and awarded through a competitive process by the Maricopa County Community Development Advisory Committee and the Board of Supervisors. There are federal regulations related to CDBG funded projects, Davis Bacon and Related Acts and HUD Section 3 requirements included in this solicitation. There is also funding from the Water Infrastructure Finance Authority of Arizona (WIFA) with a contract packet for governmental borrowers. Related Documents: - Attachment Preview
-
Last updated: 7/3/24CDBG Forms and Federal RequirementsForm 1, The Bidder’s Information Form: Required to be submitted with each bid.All other forms in this section: To be completed by the apparent low bidder and submitted bythe deadline indicated on the form. If there is no deadline on the form, it should be submittedwithin 5 days of notification of bid results.Form Title1 BIDDERS INFORMATION FEDERALLY FUNDED PROJECT FORM (required with the bid)*FORMS 2 - 10 are required by the apparent low bidder prior to the start ofconstruction.2 CERTIFICATION ON FEDERALLY FUNDED CONTRACTS PUBLIC LAW 100-690,SECTION 5152 DRUG-FREE WORKPLACE ACT OF 1988**3 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION**4 AFFIRMATIVE ACTION PLAN STATEMENT**5 BIDDER'S ASSURANCE OF COMPLIANCE WITH TITLE 49 PART 23 RELATING TOMINORITY BUSINESS ENTERPRISE PARICIPATION**6 MINORITY AND WOMEN BUSINESS ENTERPRISE – JOB REPORT*7 CERTIFICATION OF UNDERSTANDING AND AUTHORIZATION LABOR STANDARDS ANDDAVIS BACON *8 AUTHORIZATION FOR DEDUCTIONS: REQUEST FOR CERTIFICATION OF APPLICABLEFRINGE BENEFIT PAYMENTS FOR DAVIS BACON PAYROLLS**9 IMMIGRATION LAW AND REGULATIONS CERTIFICATION**10 LCP TRACKER REGISTRATION FORM *Send to Maricopa County at least 1 week before the start of construction.11 SECTION 3 POLICIES AND PROCEDURES FOR SUBRECIPIENTS, CONTRACTORS, ANDSUBCONTRACTORS OF HOME and CDBG PROGRAM FUNDSADDITIONAL FEDERAL REQUIREMENTSHUD 4010 FEDERAL LABOR STANDARDS PROVISIONSWAGE DETERMINATION - TO BE INCLUDED IN EVERY CONTRACT AND SUBCONTRACT* To be turned in prior to the issuance of the final Notice to Proceed** To be turned in prior to any construction activitiesHuman Services234 N. Central Ave., Suite 3000Phoenix, Arizona 85004E: HCD@maricopa.govBIDDERS INFORMATION FORMFEDERALLY FUNDED PROJECTForm 1-1To be completed by each contractor and subcontractor working on the project and submitted to the Owner’s representative atthe time of bid submittal. Following award, the prime contractor will supply the forms to the lower tier contractors as a part ofthe pre Notice to Proceed paperwork.Project Name:City/Town Name:Contractor/Company Name:Phone:Street # and Street Name orP.O. Box:City:State:Zip:Federal ID numberor Social Security number:Type of License:License number:Unique Entity ID (SAM.gov):All Bidders must be registered in SAM.gov (System for Award Management) prior to award. All subsmust be registered in SAM.gov prior to the issuance of the Notice to Proceed.Owner Name:Date:SignatureHuman Services234 N. Central Ave., Suite 3000Phoenix, Arizona 85004E: HCD@maricopa.govCERTIFICATION ON FEDERALLY FUNDED CONTRACTSPUBLIC LAW 100-690, SECTION 5152DRUG-FREE WORKPLACE ACT OF 1988Form 2-1To be completed by each contractor and subcontractor working on the project and submitted to the Owner’srepresentative at least 5 days prior to the beginning of any construction activities.The OWNER has adopted a policy and certified to all Federal Agencies that have granted federalfunds to the OWNER that OWNER will provide a drug-free workplace for our employees andthat Contractors providing property or services to OWNER with a value of $25,000 or moreunder a federally funded contract must also provide a drug-free workplace for their employees.DRUG-FREE WORKPLACE REQUIREMENTS FOR CONTRACTORS ON FEDERALLY FUNDEDCONTRACTS(A) DRUG-FREE WORKPLACE REQUIREMENT.(1) REQUIREMENT FOR PERSONS OTHER THAN INDIVIDUALS. -- No person, otherthan an individual, shall be considered a responsible source, under the meaning of suchterm as defined in the section 4(8) of the Office of Federal Procurement Policy Act [41U.S.C. 403(8)], for the purposes of being awarded a contract for the procurement of anyproperty or services of a value of $25,000 or more from any Federal agency unless suchperson has certified to the contracting agency that it will provide a drug-free workplaceby -(a) publishing a statement notifying employees that the unlawfulmanufacture, distribution, dispensation, possession, or use of a controlledsubstance is prohibited in the persons workplace and specifying the actions thatwill be taken against employees for violations of such prohibition;(b) establishing a drug-free awareness program to inform employees about(i) the dangers of drug abuse in the workplace;(ii) the person's policy of maintaining a drug-free workplace;(iii) any available drug counseling, rehabilitation, and employeeassistance programs; and(iv) the penalties that may be imposed upon employees for drugabuse violation;Human Services234 N. Central Ave., Suite 3000Phoenix, Arizona 85004E: HCD@maricopa.govForm 2-2(c) making it a requirement that each employee to be engaged in theperformance of such contract be given a copy of the statement required bysubparagraph (A);(d) notifying employees in the statement required by subparagraph (A), thatas a condition of employment on such contract, the employee will-(i) abide by the terms of the statement; and notify the employer ofany criminal drug statute conviction for a violation occurring in theworkplace no later than five (5) days after such conviction;(e) notifying the contracting agency within ten (10) days after receivingnotice under subparagraph (D)(ii) from an employee or otherwise receivingactual notice of such conviction;(f) imposing a sanction on, or requiring the satisfactory participation in adrug abuse assistance or rehabilitation program by, any employee who is soconvicted, as required by section 5154; and(g) making a good faith effort to continue to maintain a drug-free workplacethrough implementation of subparagraphs (A), (B), (C), (D), (E), and (F).(2) REQUIREMENT FOR INDIVIDUALS. No Federal agency shall enter into a contractwith an individual unless such contract includes a certification by the individual that theindividual will not engage in the unlawful manufacture, distribution, dispensation,possession, or use of a controlled substance in the performance of the contract.(B) SUSPENSION, TERMINATION, OR DEBARMENT OF THE CONTRACTOR.(1) GROUNDS FOR SUSPENSION, TERMINATION, OR DEBARMENT. -- Each federally-funded contract shall be subject to suspension of payments under the contract ortermination of the contract, or both, and the contractor thereunder or the individualwho entered the contract, as applicable, shall be subject to suspension or debarment inaccordance with the requirements of this section if the head of the contracting agencydetermines that -(a) the contractor or individual has made a false certification undersubsection (a);Human Services234 N. Central Ave., Suite 3000Phoenix, Arizona 85004E: HCD@maricopa.govForm 2-3(b) the contractor violates such certification by failing to carry out therequirements of subparagraph (A), (B), (C), (D), (E), or (F) of subsection (a)(1); or(c) such a number of employees of such contractor have been convicted ofviolations occurring in the workplace as to indicate that the contractor has failedto make a good faith effort to provide a drug-free workplace as required bysubsection (a).(2) CONDUCT OF SUSPENSION, TERMINATION, AND DEBARMENT PROCEEDINGS. -(a) If a contracting officer determines, in writing, that cause for suspensionof payments, termination, or suspension or debarment exists, an appropriateaction shall be initiated by a contracting officer of the agency, to be conductedby the agency concerned in accordance with the Federal Acquisition Regulationand applicable agency procedures.(b) The Federal Acquisition Regulation shall be revised to include rules forconducting suspension and debarment proceedings under this subsection,including rules providing notice, opportunity to respond in writing or in person,and such other procedures as may be necessary to provide a full and fairproceeding to a contractor or individual in such proceeding.(3) EFFECT OF DEBARMENT. -- Upon issuance of any final decision under thissubsection requiring debarment of a contractor or individual, such contractor orindividual shall be ineligible for award of any contract by any Federal agency, and forparticipation in any future procurement by any Federal agency, for a period specified inthe decision, not to exceed (5) years.Human Services234 N. Central Ave., Suite 3000Phoenix, Arizona 85004E: HCD@maricopa.gov
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Property Development-SE Corne...
Solicitation Number/Type/Category Description Department/Buyer Closing Date/time RFQ-F620-2026153-1 Request for Qualification (RFQ) - Property
City of Mesa
Bid Due: 7/30/2026
Plumbing Repairs, Phoenix Rea...
Follow Plumbing Repairs, Phoenix Rearing Facility Active Contract Opportunity Notice ID 12639526Q0197 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/31/2026