SO-1851, 1852, 1853, 1854 Kitchen Renovation Specifications at Attwood, Gardner, Ebersole, Dwight Rich
Project Information
- Bid Title
- SO-1851, 1852, 1853, 1854 Kitchen Renovation Specifications at Attwood, Gardner, Ebersole, Dwight Rich
- Issuing Agency
- Lansing School District
- Location
- Michigan
- Published Date
- Mar 20, 2026
- Closing Date
- Apr 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- SO-1851, 1852, 1853, 1854 Kitchen Renovation Specifications at Attwood, Gardner, Ebersole, Dwight Rich
- Attachment Preview
-
LANSING SCHOOL DISTRICT2026 SUMMER PROJECTSKITCHEN REMODEL PROJECTSBID PACKAGE #2SECTION 00 11 13: ADVERTISEMENT FOR BIDSThe Lansing School District will receive proposals from qualified contractors for the Kitchen Remodel projectsat Gardner Elementary, Ebersole Center, Attwood Elementary and Dwight Rich PK-8th Grade Building.Work includes: Kitchen / Cafeteria Remodel ProjectsProposals may be mailed or delivered in person to:Lansing School DistrictAttn. Todd Coe519 W. KalamazooLansing, MI 48933Proposals must be received prior to 2:00 PM Thursday, April 9, 2026. All proposals will be open publicly andread aloud at that time at the Lansing School District Administration Office, 519 W. Kalamazoo, Lansing, MI48933. Proposals received after this time will not be accepted.All proposals must be sealed in envelopes, plainly labeled "Proposal for Kitchen & Cafeteria RemodelProjects, Bid Division: “_".Any questions or RFI’s should be submitted in writing to David Beckering; email: djb@beckering.comA Pre-Bid Meeting will be scheduled for Thursday, March 26, 2026 at 8:00AM at Gardner Elementary, 333Dahlia Dr., Lansing, MI 48911. Attendance is strongly recommended.A bid security in the amount of 5% of the bid in the form of a bid bond, certified or cashiers’ check is requiredand payable to Lansing School District.Performance, labor and material bond costs (which cover 100% of the value of the project) should be bidseparately on the line provided on the bid form. Do not include the cost of PLM Bonds in your base bid.Applicable Michigan sales and use tax apply to this project.Prevailing wages DO NOT apply to this project.Bidding Documents may be examined after March 16, 2026 at:Beckering Construction Inc.Colliers Engineering & DesignBuilders ExchangeBuilders ExchangeBuilders ExchangeMcGraw-Hill DodgeCAM Room650 - 44th Street SE, Grand Rapids MI 49548560 5th Street NW, Unit 305, Grand Rapids, MI 49504678 Front Ave. NW, Suite 330, Grand Rapids, MI 495041240 E Saginaw Street, Lansing MI 489063431 E Kilgore, Kalamazoo MI 49002401 Hall Street SW, Grand Rapids, MI 4950343636 Woodward Ave, Bloomfield Hills, MI 48302(616) 532-8191Bidding documents are also available using the following link below:https://www.dropbox.com/scl/fo/1gt0lgg7ameo3rlw4r84n/APkXJpwhrGkrZaVr_g-1GU0?rlkey=hrwe0h4m5o6gjz07zd1ocmtqq&st=11j4d5lf&dl=0The Owner reserves the right to accept or reject any or all bids and to waive any irregularities in proposals.Proposals shall remain firm for sixty (60) days from date of bid opening.BID ADVERTISEMENTPAGE 1 OF 1LANSING SCHOOL DISTRICT2026 SUMMER PROJECTSKITCHEN REMODEL PROJECTSBID PACKAGE #2SECTION 00 21 13: INSTRUCTIONS TO BIDDERSThe following format and descriptions for the above project is to help each bidder understand, as a guideonly, their specific bid division. Bidders should include all material, plus labor etc., unless it is specificallystated to furnish material only. The contents of this bidding guide are to be used as a guide only and willnot alleviate the bidding contractors from errors or omissions due to the lack of bidding investigation, bothin field checking or contract documents.There are (4) schools involved with this Bid Package: Gardner Elementary, Ebersole Center,Attwood Elementary and Dwight Rich PK-8; and Bidders have the option to bid on one, two, threeor four of the projects noted in these documents. On the Gardner project Phase 1 will proceed inthe Summer of 2026 and Phase 2 will proceed in the Summer of 2027. Please note on your bidform if your company can hold pricing for Gardner Phase 2 until Summer 2027 or what theupcharge would be.Prevailing wages DO NOT apply to this project.A Sworn Statement of Familial Relationship must be submitted with your bid form. Failure to provide thisdocument will result in the rejection of your bid, pursuant to Section 1267 of the Revised School Code -MCL 380.1267.All proposals shall be accompanied by Affidavit of Compliance – Iran Economic Sanctions Act incompliance with “Iran linked business” within the meaning of the Iran Economic Sanctions Act, MichiganPublic Act No. 517 of 2012. Proposals that are not accompanied by this Affidavit of Compliance will notbe accepted. The District also requires that the following forms be submitted with your bid: Non-CollusionAffidavit, Non-Discrimination Policy and Legal Status of Bidder.Bids will be awarded on a lump sum basis and will be assigned as subcontractors to BeckeringConstruction Inc.A 5% bid bond or certified check in the amount of 5% of the bid is required for this project. Performance,labor, and material bond costs should be bid separately on the line provided on the bid form. Do notinclude the cost of PLM Bonds in your base bid. If your bid amount is less than $50,000, it is notnecessary to provide an amount for the PLM Bond. If bonds are required, they must be written bycompanies which are authorized to do business in and are in good standing with the State of Michigan.Please refer to specifications and plans for detailed scope of each division. All bidders are required tocomply with Division 01 – General Requirements, as it relates to their scope of work.RFI’s are to be submitted in writing to djb@beckering.com. RFI’s will typically be answered by addendum.Base Bids and Alternate Bids shall be based on the Bidding Documents including approved substitutions,and on the Bidders' evaluations of the Project Site. However, the Owner invites Voluntary Alternates orValue Engineering suggestions consistent with the intent of the Bidding Documents. Such alternates andsuggestions, if submitted, shall be listed in the spaces provided on the Proposal Forms.All subcontractors will be required to follow state and federal regulations including OSHA and MIOSHArequirements. Safety will be enforced and safety meetings for on-site people will be required. It is theBIDDING GUIDEPAGE 1 of 2LANSING SCHOOL DISTRICT2026 SUMMER PROJECTSKITCHEN REMODEL PROJECTSBID PACKAGE #2responsibility of all contractors to make sure that their employees on site are trained on how to handleasbestos.All contractors are required to provide continuous housekeeping and clean-up. Beckering Constructionwill provide a dumpster for removal of miscellaneous debris. All contractors must plan to clean up theirdebris and move the debris to the dumpster. Major debris should be hauled away by the subcontractorthat created the trash or spoils. Beckering Construction will not allow masonry or drywall debris to beplaced in the dumpsters. All contractors must remove their own pallets from the jobsite.All contractors are responsible for the entire set of plans and specifications including tables, schedules,notes and elevations. Bidders shall use complete sets of bidding documents in preparing proposals.Bidders are responsible for ascertaining that the bidding documents upon which their proposals arebased are complete sets. Requests from bidders for clarification or interpretation of the biddingdocuments will be received by the Project Team until 3 days before the bids are due. Changes andcorrections to the bidding documents will be made by Addendum and distributed to the bidders by emailand/or fax.The bid documents include the following specification sections that all contractors must abide by:Section 01 25 00Section 01 40 00Section 01 33 00Section 01 77 00Substitution ProceduresQuality RequirementsSubmittal ProceduresClose Out ProceduresThe School District recently added a new Close Out Requirement. In addition to the standard paperworknoted in Division 017700, each contractor must prepare and submit a single flash drive with all close-outdocuments organized by folders for client use.Bidders in contention for contract awards will be asked to attend a post-bid interview and submit post-bidinformation such as financial statements, list of similar size projects, foreman resumes and cost savingsuggestions.The project will proceed per the following tentative schedule:Pre-Bid Meeting (8:00 AM)Bids Due 2:00PMPost Bid InterviewsBoard of Education ApprovalInterior Work BeginsSubstantial Completion DatePunch ListFinal InspectionsOwner OccupancyPhase 2 – GardnerMarch 26, 2026April 9, 2026April 13 & 14, 2026April 23, 2026June 8, 2026August 11, 2026August 12-16, 2026August 17, 2026August 18, 2026Summer 2027BIDDING GUIDEPAGE 2 of 2LANSING SCHOOL DISTRICT2026 SUMMER PROJECTKITCHEN REMODEL PROJECTSBID PACKAGE #2SECTION 00 24 13: BID DIVISIONS / SCOPE OF WORKThe following Divisions are included in this Bid PackageBid Division ABid Division BBid Division CBid Division DBid Division EBid Division FGeneral TradesDrywall / AcousticFlooringPaintingPlumbing / HVACElectricalBID DIVISIONS / SCOPESPAGE 1 of 12LANSING SCHOOL DISTRICT2026 SUMMER PROJECTKITCHEN REMODEL PROJECTSBID PACKAGE #2BID DIVISIONS / SCOPE OF WORKBid Division AGeneral TradesSection02 41 1903 30 0006 10 0006 16 0006 61 1607 92 0008 11 1308 71 0008 14 1610 28 0010 44 0010 90 0012 32 16Selective DemolitionCast In Place ConcreteRough CarpentrySheathingSolid Surface TopJoint SealantsHollow MetalHardwareWood DoorsToilet Room AccessoriesFire Protection SpecialtiesMisc. SpecialtiesManufactured Plastic Laminate-Faced CaseworkThis Bid Division must include the following allowances:Gardner Elementary:Phase 1 proceeds in Summer of 2026Phase 2 proceeds in Summer of 2027Concrete Patching(L&M)Temp. Enclosures &MIOSHA WorkClean-Up (Dumpsterprovided by CM)Masonry PatchingGardnerElem.4,000.002,500.003,500.0012,000.00EbersoleCenter4,000.001,500.002,000.000.00DwightRich4,500.002,500.003,000.001,500.00AttwoodElem.0.001,500.001,500.000.00This division includes all selective demo work including doors, frames, walls ceilings, newopenings in existing walls both interior and exterior, saw cutting, and removal of concrete floors,removal of exterior windows, new roof openings for mechanical equipment and roof hatches,removal of existing flooring and base and any other selective demo as detailed in the biddocuments. This division must provide their own dumpster for demolition debris.This division includes labor, material and equipment to install all rough carpentry, finish carpentry,architectural woodwork and millwork, and miscellaneous items required for the project, includingbut not restricted framing, blocking, wood furring, plywood backing, and all finish work as detailed.All required interior wood blocking must be non-combustible lumber.At Gardner, Ebersole and Dwight Rich, the Food Service Contractor will be installing all newequipment, cabinets and stainless-steel tops.BID DIVISIONS / SCOPESPAGE 2 of 12
- Commodity Codes
-
- NAICS 236118Residential Remodelers
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
511/26306.JLM; Alpena CRTC - ...
Description: 511/26306.JLM; Alpena CRTC - Bldg 370 Roof Repair Department: Technology, Management and
State of Michigan
Bid Due: 7/16/2026
DWP HVAC Replacements Department Contact: Dan Kleinheksel Dan.Kleinheksel@wyomingmi.gov Purchasing Dept. Email: Laura.Jackson@wyomingmi.gov Bid
City of Wyoming
Bid Due: 7/14/2026