RFP: Removal and Installation of Motor Control Center Addendum #4
Project Information
- Bid Title
- RFP: Removal and Installation of Motor Control Center Addendum #4
- Issuing Agency
- Birmingham Airport Authority
- Location
- Alabama
- Published Date
- Feb 2, 2026
- Closing Date
- Feb 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
REQUEST FOR PROPOSAL (RFP)ADDENDUM NUMBER FOUR (4)DATE: February 2, 2025PROJECT:From:To:Installation and Removal of Motor Control Center for Storm Water Pump StationBirmingham-Shuttleworth International AirportBirmingham, AlabamaBirmingham Airport Authority (BAA)5900 Messer Airport HighwayBirmingham, Alabama 35212All ParticipantsGeneral:This addendum will form a part of the RFP and modifies the original Request for Proposal (RFP)document. The following changes take precedence over items in the RFP. Any portion of theRFP not changed by this Addendum remains in effect. Recipients of the Addendum are advisedto provide this Addendum to anyone to whom they further distribute without the BAA’sknowledge.Participants in this RFP are required to acknowledge receipt of this Addendum in their proposal.Failure to do so may subject Proposer for disqualification.ADDITIONAL INFORMATION/CLARIFICATIONS/DESCRIBED BELOW:The deadline for proposals is Monday February 9th, 2026, at 2:00PM.1. Question: Appendix “A” references a load list for the MCC; please provide the referenced load list forreview.Answer: Load Specifications listed on documentation attachment.2. Question: Please provide any additional information or documentation pertinent to the LV MCC andthe associated controls.Answer: The information is located inside the Pump control Telemetry panel documentationattachment.3. Question: Please provide all available documentation and drawings for the existing Cutler-HammerMotor Control Center for reference.Answer: Documentation available on the attachment.4. Question: Please confirm the maximum allowable duration of the MCC shutdown, identify anyrestrictions on shutdown timing (after hours or weekends), and advise if a defined shutdown sequencewill be required.Answer: Work can be performed during normal work hours. Please provide Birmingham Authoritywith your professional expertise on the project time duration.5. Question: Please confirm whether the LV MCC needs to communicate with the Watchdog ControlSystem, and if so, provide details on the communication method.Answer: Information located in Pump control Telemetry panel attachment and MCC attachment.6. Question: Please provide all available documentation and drawings for the Watchdog Control Systemfor reference.Answer: Information we have attached.7. Question: Please confirm whether the existing pump motors can be disconnected for conductor testingand clarify responsibilities should any existing motor feeders fail during testing.Answer: Pump Motors can be disconnected. Responsibility of a normal conductor test failure will beno fault of the contractor.8. Question: Please provide all available motor nameplate information for the pump motors forreference.Answer: No Motor Plate information but motors are 300hp 360amp9. Question: Please provide details on the existing pump breaker wiring orientations, including pumpfeeder exit locations and whether load-side conductors exit from the wire trough or from the top orbottom of the breakers.Answer: Information listed on the MCC documentation attachment10. Question: Please confirm whether the existing 1600 Amp MCC main breaker is configured as top-fedor bottom-fed.Answer: Bottom Feed11. Question: What is the width, in inches, of the existing MCC? What is the current height of theexisting MCC?Answer: Information listed on the MCC documentation attachment.12. Question: Are the loads and feeders top-fed, bottom-fed, or a combination of both? Can we see apicture of the MCC with the doors open, or schedule a follow-up visit to open the doors?Answer: Main power feed is bottom fed. Please see MCC documentation attachment.13. Question: May we temporarily remove the chain link fence between the road and the pumphouse toallow a forklift/telehandler to rig/handle MCC removal and installation?Answer: Yes, but must install a temp fence that can be locked for security reasons.14. Question: How much notice/lead-time will be required for outage coordination?Answer: Please provide Birmingham Authority with your professional expertise.15. Question: Once MCC is powered down for replacement, how much time is permitted beforestormwater pumps are operational again?Answer: Please provide Birmingham Authority with your professional expertise.16. Question: Is the electrical contractor responsible for temporary power to any of the loads fed from theMCC?Answer: Yes17. Question: What are the pump specs that the MCC is feeding? What are the starter specs within theMCC? What size is the main breaker?Answer: Main Breaker 1600amp/ Motor disconnect feeder buckets 800amp and starters appear to besize 6 Pump are FLYGT (Large Propeller) No information
- Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow SPRDL1-26-Q-0034 Active Contract Opportunity Notice ID SPRDL1-26-Q-0034 Related Notice SPRDL1-26-Q-0034 Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 7/10/2026
CABLE ASSEMBLY, PRINTED , FLE...
Follow CABLE ASSEMBLY, PRINTED , FLEXIBLE Active Contract Opportunity Notice ID SPRDL1-25-R-0221 Related
DEPT OF DEFENSE
Bid Due: 7/24/2026