Tomahawk Creek Wastewater Treatment Facility Process Improvements Project
Project Information
- Bid Title
- Tomahawk Creek Wastewater Treatment Facility Process Improvements Project
- Issuing Agency
- Johnson County
- Location
- Kansas
- Published Date
- May 20, 2026
- Closing Date
- Jun 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-017
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Information
Contact InformationType Invitation for Bid Status Issued Number 2026-017 (Tomahawk Creek Wastewater Treatment Facility Process Improvements Project) Issue Date & Time 5/20/2026 08:00:00 AM (CT) Close Date & Time 6/25/2026 02:00:00 PM (CT) Question Cut Off Date 6/15/2026 10:00:00 AM (CT) Notes S e a l e d b i ds f or Bi d R e q u est No. 2026-017 f or J o h nson C o u n t y W a s te w a ter Tomahawk Creek WWTF Process Improvements Project – Contract No. THM1-C031. The w ork co n s i s ts of th e f ol l o w i n g improvements to the Tomahawk Creek WWTF :A. Odor Control Improvements: Installation of covers on the BNR Basin anaerobic and pre-anoxic basins, and addition of Odor Control System No. 4. Customized rubber mat covers will also be added to the BNR Influent Splitter Box and RAS Splitter boxes to mitigate odor complaints and improve operational flexibility for VFA production.
B. Sidestream Nitrogen Treatment Improvements: Separation of centrifuge startup/shutdown slop flows from the main centrate discharges and redirection to the plant drain to reduce solids accumulation in the Centrate Holding Basin.
C. Gravity Thickener H 2 S Reduction: Addition of ferric chloride feed capability to the Primary Sludge Gravity Thickener/Fermenter to reduce hydrogen sulfide generation and loading on odor control units.
D. Co-Thickening Improvements: Modifications to allow thickened primary sludge (TPS) to discharge directly to the Co-Thickened Sludge (CTS) wetwell, addition of a fifth digester feed pump for continuous mixing, and installation of pressure sensors on digester feed pump discharge piping with SCADA integration.
E. Sludge Cleanout Manhole: Addition of a sludge cleanout manhole over the (3) 4” CTS lines between the Solids Processing Building and Digester Control Building to facilitate future line cleaning.
F. Primary Clarifier Improvements: Construction of an access drive and installation of cleanouts for scum pit drainpipes, and addition of electric actuators to six PC Influent Slide Gates at the Headworks Building.
G. Micro-C Dosing Improvements: Replacement of potable water with Plant Effluent Water (PEW) as carrier water for Micro-C dosing, and rerouting of Micro-C discharge lines above grade for improved visibility and control.
H. Pre-Anoxic Mixers: Addition of a second submersible mixer in pre-anoxic zones PAX1-1 and 3-1 to facilitate the movement of scum out of pre-anoxic zones.
I. Digester No. 3 Access Improvements: Replacement of the existing 21-ft tall cageless ladder with a stair tower to improve safety and accessibility to the digester roof. Demo of existing ladder.
J. Chlorine Contact Basin Improvements: Replacement of all aluminum slide gates with corrosion-resistant materials due to chloride-induced deterioration.
K. Filter Complex Improvements: Installation of an electric actuator on the secondary effluent/filter influent gate for automated wet weather operation, and addition of safety platforms to the eight disk filter basins to enhance maintenance access and safety.
L. Storm Drain Isolation near Ferric Tanks: Installation of an isolation drainage system near the ferric chloride truck unloading station to prevent chemical spills from entering the storm sewer system, as identified by KDHE.
Bi d d e rs s h a l l su b m i t w i th t h e i r b i d a b i d b o n d i ss u e d b y a s u r e t y c o m p a n y l i c e n se d to do b us i n ess i n t he S t a te of K a nsas i n t h e a m o u nt of f i v e p e r ce nt (5%) of the to t al a m o u nt of th ei r b i d. S aid g u ara n tee s h a l l b e m a d e p a y a ble to the B o a rd of Co u n t y Co m m i ss i o n ers of Jo h nson C o u n t y , K a nsas.All bids shall be submitted electronically on IonWave .Name Nicole Averell Address 111 S. Cherry
Olathe, KS 66061 USAPhone (913) 715-0595 Fax Email Bid DocumentsDocument name Format Bid Invitation
Acrobat / PDF BINVAVL 9395655 Bid AttachmentsFile Name Description File Size
12 items in 1 pages
00 16 00 - Q - Questionnaire.docx
00 16 00 - Q - Questionnaire 38 KB 348063 7423267 00 15 00 - BB - Bid Bond.docx
00 15 00 - BB - Bid Bond 41 KB 348063 7423270 Tomahawk Creek WWTF Process Improvements 100% Specifications.pdf
Tomahawk Creek WWTF Process Improvements 100% Specifications 22.83 MB 348063 7423240 Tomahawk Creek WWTF Process Improvements 100% Drawings.pdf
Tomahawk Creek WWTF Process Improvements 100% Drawings 87.42 MB 348063 7423241 Tomahawk Creek, Contract 26 WWTF Expansion V1.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V1 34.79 MB 348063 7423243 Tomahawk Creek, Contract 26 WWTF Expansion V2.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V2 205.98 MB 348063 7423246 Tomahawk Creek, Contract 26 WWTF Expansion V3.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V3 67.42 MB 348063 7423250 Tomahawk Creek, Contract 26 WWTF Expansion V4.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V4 36.62 MB 348063 7423252 Tomahawk Creek, Contract 26 WWTF Expansion V5.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V5 49.29 MB 348063 7423256 Tomahawk Creek, Contract 26 WWTF Expansion V6.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V6 38.22 MB 348063 7423259 Tomahawk Creek, Contract 26 WWTF Expansion V7.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V7 37.21 MB 348063 7423261 Tomahawk Creek, Contract 26 WWTF Expansion V8.pdf
Tomahawk Creek, Contract 26 WWTF Expansion V8 30.78 MB 348063 7423264 - Commodity Codes
-
- NAICS 221320Sewage Treatment Facilities
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541611Administrative Management and General Management Consulting Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Johnson County Administration...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Johnson County
Bid Due: 7/10/2026
2026 Street Management Projec...
Bid 95 Mill and Overlay and Storm Inlet Replacement Project SW 38th, SW
City of Topeka
Bid Due: 7/16/2026