RFQ 2619 - Gorman-Rupp 6-Inch Self-Priming Centrifugal Pump
Project Information
- Bid Title
- RFQ 2619 - Gorman-Rupp 6-Inch Self-Priming Centrifugal Pump
- Issuing Agency
- East Bay Municipal Utility District
- Location
- California
- Published Date
- Jun 4, 2026
- Closing Date
- Jun 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
current rfqs due date for bid package please contact RFQ 2619 - Gorman-Rupp 6-Inch Self-Priming Centrifugal Pump June 17, 2026 John Grimes
510-287-0316
john.grimes@ebmud.com - Attachment Preview
-
EAST BAY MUNICIPAL UTILITY DISTRICTREQUEST FOR QUOTATION (RFQ) No. 2619forGORMAN-RUPP 6-INCH SELF-PRIMING CENTRIFUGAL PUMPContact Person: John W. Grimes, Buyer IIPhone Number: (510) 287-0316E-mail Address: john.grimes@ebmud.comFor complete information regarding this project, see RFQ posted athttps://www.ebmud.com/business-center/materials-and-supplies-bids/current-requests-quotation-rfqs/ or contact the EBMUD representative listed above. Please note that prospectivebidders are responsible for reviewing this site during the RFQ process, for any published addendaregarding this RFQ.Bids Dueby2:00 p.m.onJune 17, 2026All bid submissions hand delivered or mailed (USPS, FedEx, UPS, etc.) to the address orPO Box noted below and must be received no later than 2:00 p.m. on the bid due date.RESPONSE DELIVERED BY SERVICE(UPS, FedEx, DHL, etc., duringbusiness hours: 8:00 AM – 3:30PM only) to:RESPONSE DELIVERED BY MAIL(U.S. Postal Service) to:EBMUD–Purchasing DivisionGORMAN-RUPP 6-INCH SELFPRIMING CENTRIFUGAL PUMP –RFQ 2619375 11th StreetOakland, CA 94607EBMUD–Purchasing DivisionGORMAN-RUPP 6-INCH SELFPRIMING CENTRIFUGAL PUMP –RFQ 2619P.O. Box 24055Oakland, CA 94623RESPONSE HAND-DELIVERED(during business hours: 8:00AM – 4:00 PM only)EBMUD–Purchasing DivisionGORMAN-RUPP 6-INCH SELFPRIMING CENTRIFUGAL PUMP –RFQ 2619Purchasing Office375-11TH Street, 1st FloorOakland, CA 94607REV: 9/23/25EAST BAY MUNICIPAL UTILITY DISTRICTRFQ No. 2619forGORMAN-RUPP 6-INCH SELF PRIMING CENTRIFUGAL PUMPTABLE OF CONTENTSI. STATEMENT OF WORK ........................................................................................................... 3A. SCOPE................................................................................................................................... 3B. BIDDER QUALIFICATIONS .................................................................................................... 3C. SPECIFICATIONS................................................................................................................... 3D. INSPECTION ......................................................................................................................... 4E. FAILURE TO MEET SPECIFICATIONS..................................................................................... 4II. CALENDAR OF EVENTS ........................................................................................................... 5III. DISTRICT PROCEDURES, TERMS, AND CONDITIONS ................................................................ 5A. RFQ ACCEPTANCE AND AWARD .......................................................................................... 5B. BRAND NAMES, DEVIATIONS, AND EXCEPTIONS ................................................................ 6C. PRICING................................................................................................................................ 6D. NOTICE OF INTENT TO AWARD AND PROTESTS.................................................................. 6E. METHOD OF ORDERING ...................................................................................................... 7F. TERM / TERMINATION / RENEWAL ..................................................................................... 7G. WARRANTY .......................................................................................................................... 8H. INVOICING ........................................................................................................................... 9IV. RFQ RESPONSE SUBMITTAL INSTRUCTIONS AND INFORMATION ........................................... 9A. DISTRICT CONTACTS ............................................................................................................ 9B. SUBMITTAL OF RFQ RESPONSE ......................................................................................... 10ATTACHMENTSEXHIBIT A – RFQ RESPONSE PACKETEXHIBIT B – INSURANCE REQUIREMENTSEXHIBIT C – GENERAL REQUIREMENTSEXHIBIT D – IRAN CONTRACTING ACT CERTIFICATIONREV: 9/23/25GORMAN-RUPP 6-INCH SELF-PRIMING CENTRIFUGAL PUMPI. STATEMENT OF WORKA. SCOPEIt is the intent of these specifications, terms, and conditions to describe requirement tofurnish and deliver one Gorman Rupp model T6A60S-4045T S5-ESP, 6-inch self-primingcentrifugal pump, f.o.b. destination, to the District’s SD-1 Operations Center at 2020Wake Avenue, Oakland, California 94607.East Bay Municipal Utility District (District) intends to award a contract to the lowestcost bidder(s) whose response meets the District’s requirements.B. BIDDER QUALIFICATIONS1. Bidder Minimum Qualificationsa. Bidder, bidder’s principal, or bidder’s staff shall have been regularlyengaged in the business of providing self-priming centrifugal pumpequipment for at least three (3) years.b. Bidder shall be a certified or authorized Gorman-Rupp manufacturer,dealer, or provider.c. Bidder shall possess all permits, licenses, and professional credentialsnecessary to supply product and perform services as specified under thisRFQ.C. SPECIFICATIONS1. Gorman-Rupp Model T6A60S-4045T S5-ESPa. 6” Diesel Engine Driven Self-Priming Silent Pump with 6” Super-T Series™cast iron pump with oil lubricated silicon carbide mechanical seal andfurnished with 6” suction and discharge connections. The pump shall bedriven by a John Deere model 4045T, EPA stage 5, four cycleturbocharged, forced circulation diesel engine. Includes: Pad-lockable Boxwith Throttle Control, Tachometer, Coolant Temp., Oil Pressure, Voltageand Over-start Indicators/Shutdowns. Manual/Stop/Auto Key-switch.Audible Startup Warning Delay. Fuel Level Display/Alarm/Shutdown.b. Standard Equipment: Soundproof (EPA Average 73 dBA at 23 feet) UnderLoad) Lightweight Aluminum Enclosure ‐ Removable for Maintenance ofPump or Engine w/Padlockable Door Panels. Spill Containment Basew/Integral Drains. Automatic Air Release Valve with Check Valve. 90RFQ No. 2619Page 3GORMAN-RUPP 6-INCH SELF-PRIMING CENTRIFUGAL PUMPDischarge Elbow. Strainer. Full Feature Control Panel Single Ball Type FloatSwitch.2. Other required furnished items include:a. PN# GRP30-272; EBL High Speed (DOT) Wheel Kit, with Electric Brakes,Lights, Fenders, and furnished with 3” Pintle Hitch. The wheel kit shall bemounted with the pump/engine at the factoryb. PN# 59331-527; 12VDC Batteryc. PN# 48312-981; Dual Float (added)d. All products shall be in new and unused condition and shall be of the mostcurrent and up to date model.D. INSPECTIONThe District will inspect material after its arrival at the delivery point. Contractor is solelyresponsible for ensuring the material arrives at the District’s ship-to location free ofdefects and manufactured in strict conformance with the specifications.In the case that an item or lot is rejected, District Inspectors will provide Contractor andthe EBMUD Purchasing Division with an Inspectors Job Report which will itemize theproduct deficiencies and required corrective action.The District reserves the right-of-access to the Contractor’s facility to verifyconformance to this specification at the District’s expense.E. FAILURE TO MEET SPECIFICATIONSIn the event any shipment or shipments of a Contractor’s product do not meet thespecification or delivery requirements, the District may reject the shipment orshipments and, at its option, may purchase this material from any supplier on the openmarket who can meet the District’s specification requirements, or the District maydemand immediate replacement by Contractor of the non-conforming product. Anycosts over and above the original contract price will be charged back to the Contractor.In addition, Contractor shall bear the costs of removal and disposition for any deliverywhich fails to conform to the specifications.RFQ No. 2619Page 4GORMAN-RUPP 6-INCH SELF-PRIMING CENTRIFUGAL PUMPII. CALENDAR OF EVENTSEVENTDATE/LOCATIONRFQ IssuedJune 3, 2026Deadline For Submissionof QuestionsJune 10,. 2026Response DueJune 17, 2026 by 2:00 p.m.At this time all bids will be opened publicly in the William“Bill” Patterson Boardroom at 375 Eleventh St.,Oakland, CA 94607*Anticipated Contract StartDateJuly 30, 2026Note: All dates are subject to change by District.Bidders are responsible for reviewing https://www.ebmud.com/business-center/materials-and-supplies-bids/current-requests-quotation-rfqs/ for anypublished addenda. Hard copies of addenda will not be mailed out.III. DISTRICT PROCEDURES, TERMS, AND CONDITIONSA. RFQ ACCEPTANCE AND AWARD1. RFQ responses will be evaluated to determine that they are responsive,responsible, and that they meet the specifications as stated in this RFQ.2. The District reserves the right to award to a single or to multiple Contractors,dependent upon what provides the lowest overall cost to the District.3. The District has the right to decline to award this contract or any part of it for anyreason.4. Any specifications, terms, or conditions, issued by the District, or those includedin the bidder’s submission, in relation to this RFQ, may be incorporated into anypurchase order or contract that may be awarded as a result of this RFQ.5. Award of contract. The District reserves the right to reject any or all proposals, toaccept one part of a proposal and reject the other, unless the bidder stipulates tothe contrary, and to waive minor technical defects and administrative errors, asthe interest of the District may require. Award will be made, or proposalsrejected by the District as soon as possible after bids have been opened.RFQ No. 2619Page 5
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Project ID: 2026-Informal-0360 Title: Bike Rack Procurement 2026 Addenda: 0 Release Date: 6/17/2026
City of Pasadena
Bid Due: 7/16/2026
Larkspur Ferry Terminal Moori...
Project: Larkspur Ferry Terminal Mooring Camels Refurbishment Ref. #: 2026-F-048 Type: RFP Status:
Golden Gate Bridge, Highway and Transportation District
Bid Due: 7/09/2026