6822 Bid GM CiTL Renovation
Project Information
- Bid Title
- 6822 Bid GM CiTL Renovation
- Issuing Agency
- Washtenaw Community College
- Location
- Michigan
- Published Date
- Feb 26, 2026
- Closing Date
- Mar 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
6822 Bid GM CiTL Renovation6822 Bid - Instructions Specifications 195.37 KB 02/26/2026 Bid 6822 - Attachment A - Sample Small Projects Construction Contract 177.93 KB 08/09/2024 Bid 6822 - Attachment B - General Conditions 151.15 KB 05/01/2025 Bid 6822 - Attachment C - Prevailing Wage Rate Schedule 666.12 KB 09/26/2025 Bid 6822 - Attachment D - Drawings 3.49 MB 02/25/2026 - Attachment Preview
-
Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6822 GM CiTL RenovationBid Issued On: February 20, 2026Bid Due Date: March 23, 2026 at 3:00 p.m. EST4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231Fax (734) 677-5414INSTRUCTIONS TO BIDDERSI.General1.1 Examination and Procurement of DocumentsA.Documents may be examined at the following locations Friday, February 20, 2026:Washtenaw Community CollegeOffice of Facilities ManagementDamon Flowers Building4800 East Huron River Dr.Ann Arbor, MI 48105B.Procuring Documents (MAY NOT APPLY)Electronic documents will be available at the following website:https://www.wccnet.edu/about/purchasing/bids-rfp.php additional documents may be issuedby the Owner and will posted on the website. Vendor is responsible for ensuring have themost accurate documents; a site visit is required by Owner.II.Execution2.1 Examination of Documents and SiteA.Bidders shall carefully examine the Contract Documents and the construction site toobtain first-hand knowledge of existing conditions and the demolition and constructionrequirements of the documents.B.Successful bidder will be denied any application for extra payments for conditions whichcan be determined by visually examining the site and the Contract Documents.2.2 Pre-bid Meeting / Site VisitA.A site visit is required and bids will not be accepted from bidders who have not inspectedthe site to obtain first-hand knowledge of existing conditions.B.A pre-bid meeting will be conducted at the start of the scheduled site visit.C.Each bidder shall inspect the site and become familiar with existing conditions andlimitations of the site, means of access to the site and to work areas, relationship ofexisting and new work, and other conditions which might affect the proper performanceand completion of the work.D.No allowance will be made after bid opening for cost estimation errors attributable to anyfailure to account for existing conditions and/or consider of any and all limitations on or ofthis scope of work.E.Successful bidder will be denied any application for extra payments for conditions whichcan be determined by visually examining the site.F.Bidder’s representative shall report to the Owner’s Representative and register his name,phone number, and name of the company, signing in as verification of his site visit.G. The scheduled site visit is as follows:Date:Time:Location:March 11, 202610:00 a.m. ESTGM East LobbyWashtenaw Community College, Ann Arbor, MIH.The Owner is not obligated to offer any other times to conduct site visits.Page 1 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6822 GM CiTL RenovationBid Issued On: February 20, 2026Bid Due Date: March 23, 2026 at 3:00 p.m. EST4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231Fax (734) 677-5414I.Any figured dimensions shown on the Contract Documents are for reference purposesonly. The Contractor is required to verify and confirm all dimension in the field and reportany discrepancies to the Owner’s Representative immediately. Contractor’s request foradditional payment, additional time, or reconsideration of their bid will be denied if theclaim is based on reliance on the figured dimensions shown on the Contract Documentsonly.2.3 Questions, Interpretations, and AddendaA.Should any bidder find discrepancies between the site markings and the ConstructionDocuments, or be in doubt as to their exact meaning, he should notify the Owner at once.The Owner may then, at his option, issue Addenda clarifying the same to all bidders.B.The Owner will not be responsible for oral instructions or for the Contractor’smisinterpretations of the Contract Documents.C.Questions must be directed to Don Harrison, Purchasing Agent atdharriso1@wccnet.edu. All communication should be directed to the PurchasingDepartment. Vendor should NOT contact any department directly with questions. Allquestions must be submitted by March 18, 2026 at 2:00 p.m. EST. All emails mustreference the bid number and title. All questions received by the deadline date will beanswered and posted to the WCC Budget & Purchasing web-sitehttps://www.wccnet.edu/about/purchasing/bids-rfp.php by March 20, 2026 at 2:00 p.m. EST.2.4 Bid Security, Bonds, and InsuranceA.A Bid Bond is required in the amount of five percent (5%) of the total bid, minimum, andshall be enclosed with the Bid Proposal, for all base bids categories in excess of$50,000.00.B.Performance Bond and Payment Bond requirements are described in the General and/orSupplementary Conditions and are one hundred percent (100%) of the total bid,minimum, for all bids in excess of $50,000.00.C.Insurance requirements are described in the General and Supplementary Conditions.2.5 Modification and WithdrawalA.Proposals may be withdrawn and/or changed any time prior to the bid opening.B.Proposals may not be withdrawn or changed after the bid opening time and shall bedeemed a firm offer continuing for a minimum of ninety (90) calendar days.C.Bids received after the time and date of the bid opening will not be considered forContract award.2.6 Receipt of BidsA.All bids must be received by the WCC Purchasing Department via email pur@wccnet.eduon or before the date and time as specified. Late bids will not be considered. Telephonebids will not be accepted. If you have any questions concerning this bid, please do nothesitate to contact the WCC Purchasing Department. It is the responsibility of theContractor to ensure that bids are received at the location stated below on or before thedue date and time. The college normal office hours are 8:00 AM to 4:30 PM EDST. TheContractor assumes all responsibility for delivery to the location given above regardlessof the method of shipment and delivery used and the time received to the specifiedlocation on campus.Page 2 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6822 GM CiTL RenovationBid Issued On: February 20, 2026Bid Due Date: March 23, 2026 at 3:00 p.m. EST4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231Fax (734) 677-5414B.Bids will be received by the Purchasing Department of Washtenaw Community Collegeuntil 3:00 p.m. EST, March 23, 2026. The public opening for Bid 6822 GM CiTLRenovation will be held electronically via the link below:Public Opening – Bid 6822 GM CiTL Renovation03/23/2026 at 3:30 p.m. ESTJoin Zoom Meetinghttps://wccnet-edu.zoom.us/j/85681642582?pwd=Hbifor3lapnazAUVvoFO0Jmj8qKs8a.1Meeting ID: 856 8164 2582Passcode: 892714C.Contractor shall complete, sign, and submit the Bid Proposal Form and WashtenawCommunity College Contractor Responsibility Form as a condition of Contract award.2.7 Codes, Ordinances, Regulations, Etc.A.All labor and materials shall be furnished and installed in strict accordance with the latestto-bid-date applicable codes, ordinances, and regulations of any and all governing bodiesthat have jurisdiction over this project.B.If the quality of the labor and materials required by the Drawings and Project Manualexceeds the requirements of the applicable codes, ordinances, and regulations, theDrawings and Project Manual shall take precedence.C.If the quality of the labor and materials required by the applicable codes, ordinances, andregulations exceed the requirements of the Drawings and Project Manual, then theapplicable codes, ordinances, regulations, etc. shall take precedence.2.8 Subcontractors and Material SuppliersA.The successful bidder shall submit to the Owner within 24 hours after Notice of Award, acomplete and final list of all sub-contractors, all material suppliers, and allsuperintendents (general construction and principal sub-contractors) he proposes toengage on the work. Subcontracts and material contracts shall not be awarded unlessand until they have been approved by the Owner. Superintendents (primary contractorsand principal sub-contractors) shall not be changed during the construction on this projectwithout the Owner’s prior approval in writing.B.Names of proposed principal sub-contractors must be listed on the Bid Proposal Form.2.9 Award of ContractA.Material proposals to be used for the completion of work, the competency, solvency,reputation, and responsibility of the bidders, start/completion/duration times, and otherissues deemed relevant by the Owner and the Engineer will be considered. Allresponsible bidders will receive due consideration before the awarding of this contract.B.In the reception of proposals for the Work, the Owner incurs no obligation to accept thelowest priced proposal.Page 3 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6822 GM CiTL RenovationBid Issued On: February 20, 2026Bid Due Date: March 23, 2026 at 3:00 p.m. EST4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231Fax (734) 677-5414C.The right to accept or reject any and all bids is reserved by the Owner.D.The Owner reserves the right to require testimony or legal documents pertaining to thequalifications of a Contractor.E.If applicable, the Owner may award to multiple vendors if it is the best interest of theCollege.III. Requirements3.1 Proof of Insurance – Vendor shall refer to Attachment B – General Conditions Article 11:Insurance for requirements.3.2 Contract Terms and Conditions – The awarded vendor will be required to sign a standardcontract for the work to be performed per this bid. Sample contract is included as a substantivepart of the 6822 Bid documents (Attachment A – Small Project Construction Contract).IV. Bid Scope4.1 All work shall adhere to all specifications as outlined in the Contract Documents and BidDrawings. This project is scheduled to begin May 6, 2026 with a date of final completion onor before July 15, 2026.4.2 General RequirementsA.The contractor shall provide a schedule/workplan on obtaining the necessary permits,materials, and procurement of long-lead items, to begin work and complete the work asscheduled for review by the Owner.B.Provide barricades, fencing required and signage to maintain required safety regulationsas defined by OSHA.C.Coordinate and adhere to all state and local building codes relative to this contractor'swork. This contractor is to obtain and pay for all special permits associated with the work.D.All identifiable trash or debris is to be cleaned up by the trade contractor who created it ona daily basis.E.This contractor MUST comply with MI-OSHA requirements for this work. This will be closelymonitored.F.Contractor and all its sub-contractors are to observe the College’s no smoking policy.G. Vehicles to be parked in parking lots. Unloading areas for tools and materials will beavailable at the building on a temporary basis.4.2 Scope of WorkThe work of this bid category includes but is not limited to providing all labor, equipment, materials,scaffolding, hoisting and incidentals to complete the GM CiTL Renovation in accordance with thespecifications, drawings and applicable codes. All work is to be performed as shown on the plansand specified herein.Page 4 of 12Washtenaw Community CollegePurchasing Department – SC Room 326Bid # 6822 GM CiTL RenovationBid Issued On: February 20, 2026Bid Due Date: March 23, 2026 at 3:00 p.m. EST4800 E. Huron River DriveAnn Arbor, MI 48105-4800Phone (734) 677-5231Fax (734) 677-5414THE SCOPE OF WORK IS TO INCLUDE, but is not limited to, the following items:A.Contractor to manage and coordinate with all other trades necessary to complete the workper Drawings and Specifications.B.The construction schedule for this contract will be phased based on the following timelines:Construction start 5/6/26. Project Completion will be 7/15/26. Preconstruction activitiescan start April 1, 2026 to start material procurement process and site investigation asrequired.C.All demolition work is to be performed during a 3rd shift, approximately 10p.m. – 6:30 a.m.D.Contractor to coordinate all work for proper fit, location and clearance of piping, ductwork,equipment and accessories to ensure timely completion of work.E.Contractor to secure and pay for all required permits, licenses, inspections, approvals, andfees for the work. This will include all applications for permits required by Ann ArborTownship and Michigan Bureau of Fire Safety. Contractor will coordinate all inspectionswith these entities and any others having jurisdiction over the project.F.WCC requests that this bid includes a mandatory Allowance of $ 20,000. This amount willbe use for potential changes or added scope and will be dictated for use by WCC.Remaining amounts will be returned at job close-out.G. Contractor provides its own equipment and tools necessary to complete this contract. Thisincludes all vertical lifts, forklifts….H.Contractor to field verifies all dimensions and verifies quantity’s need for this project.I.Contractor to furnish and install all pipe identification markers, tags, schedules, nameplatesto identify ducts, pipes and mechanical equipment.J.Contractor to coordinate all new support steel layout and wall penetrations required forcomplete installation.K.Contractor to coordinate with WCC on timing and impacts to building. Contractor to includeany premium time or off shift work required to complete system shutdowns and isolations.L.Restrooms in facility will be available for use by contractor’s employees.M. Contractor’s and employees’ vehicles are to be parked in designated parking lots (free ofcharge). Unloading areas for tools and materials will be available at the building on atemporary basis.N.All material and equipment that will be purchased as part of the project will be theresponsibility of the Contractor to be delivered to the jobsite with just in time approach. NOdeliveries will be accepted at WCC Shipping and Receiving. Any costs associated withreturned items will be paid by Contractor.O. Contractor is responsible for total removal and disposal of all waste generated fromconstruction activities. WCC expects that contractor will attempt to separate and recyclePage 5 of 12
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Release Date Project with Bid Documentation Mandatory Pre-Bid Site Visit Bid Due Date
Oakland University
Bid Due: 7/08/2026
FORM 5550 #10 FF WINDOW COLLE...
Description: FORM 5550 #10 FF WINDOW COLLECTIONS ENVELOPE Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/17/2026