WRC Linden Court Bay Window Replacement
Project Information
- Bid Title
- WRC Linden Court Bay Window Replacement
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Mar 20, 2026
- Closing Date
- Apr 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP953500-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
RFP953500-01
Solicitation
WRC Linden Court Bay Window Replacement
Solicitation Type
Request for Proposals
CountyDescriptionDescription
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for the replacement of the exterior windows on the Linden A, B, C, and D buildings at the Woodward Resource Center.
Agency InformationNumber
005
Name
Administrative Services, Dept
Address 1
1305 E. Walnut St.
Address 2
City/State/Zip
Des Moines, IA 50319
Contact InformationContact Name
Construction Procurement
Contact Title
Michael Bradbury
Contact Email
Contact Phone Number
(515) 823-9327
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
3/20/2026 3:00:00 PM
Until
4/15/2026 2:00:00 PM
Documents/Attachments - Attachment Preview
-
RFP COVER SHEETAdministrative InformationSTATE OF IOWAREQUEST FOR PROPOSALSPROFESSIONAL DESIGN SERVICESRFP Number RFP953500-01Title of RFP WRC Linden Court Bay Window ReplacementAgencyIowa Department of Administrative Services (DAS)ProjectDescriptionThe State of Iowa Department of Administrative Services (DAS) is seeking professional designservices for the replacement of the exterior windows on the Linden A, B, C, and D buildings atthe Woodward Resource Center.State Issuing Officer:Michael BradburyIssuing OfficerIowa Department of Administrative ServicesHoover State Office Building, Level 31305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327Email: construction.procurement@iowa.govPROCUREMENT TIMETABLE—Event or ActionDate/Time (Central Time)State Posts Notice of RFP on TSB website3/20/2026State Issues RFP3/23/2026Pre-Proposal Conference Location and Address:Woodward Resource Center1251 334th Street, Woodward, IA 50276 (Meet at Story CP2.0 Trailer)Is Pre-Proposal Conference mandatory? NoIf a map is needed, contact the Issuing Officer.4/2/2026 at 1:00 pmQuestions, requests for clarification, and suggested changes from Respondentsdue to Construction Procurement4/8/2026 at 2:00 pmProposals Due4/15/2026 at 2:00 pmRelevant WebsitesWebsite where Addenda to this RFP will be posted http://bidopportunities.iowa.govWebsite where contract terms and conditions are postedhttps://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdfNumber of Copies of Proposals Required to be Submitted: 1 DigitalFirm Proposal TermsThe minimum number of days following the deadline for submitting Proposals that the firm guarantees allproposal terms, including price, will remain firm is 120 Days.1.1 INTRODUCTIONThe Iowa Department of Administrative Services (DAS) is seeking proposals from qualified andavailable Design companies for services, per RFP cover page, and as outlined in the following(Sections 1.2 - 1.3). The successful proposal must:● For the staff that will be assigned, identify and describe qualifications, experience, andexpertise in providing services for similar, or relevant, projects.● For the staff that will be assigned, provide a list of past similar or relevant projects completedin the last 5 years, and include brief descriptions of what the projects entailed and a contactname and phone number (reference). In addition provide estimated project cost, final projectcost at acceptance, and whether it was completed on time.● Describe the composition of your team. Identify staff to be assigned. Provide resumes of keyindividual(s) including education, relevant experience, and certifications/licensing.NOTE: Any responding company and/or consultant that is part of the project design servicescannot receive an award from the resulting request for bid of construction services.● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.● Describe computer program/software capabilities and expertise you utilize. Please describeyour experience.● Provide a copy of your organizational chart.● Describe your experience, if any, on designing similar or relevant projects for the State ofIowa.● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.● Identify desired reimbursable charges (the State has limitations, per State of Iowa AccountingPolicies and Procedures 210.245), and all other charges.1.2 SCHEDULEDAS is seeking a firm that can commence work upon execution of a contract. Time is of theessence.Execution of Designer’s ContractTentative Design Kick-Off Meeting50% Construction Documents and Cost Opinion By95% Construction Documents and Cost Opinion By100% Construction Documents and Cost Opinion ByContractor BiddingExecution of Contractor’s Contract(s)Submittals, Procurement and ConstructionClose outWeek of April 20, 2026Week of April 27, 2026May 29, 2026June 26, 2026July 10, 2026August, 2026Late August, 2026September 2026 to June 2027July 20271.3 PROJECT DESCRIPTIONConstruction Manager (Story Construction) has been engaged for this Project to serve as advisorto DAS and to provide assistance in administrating the Contract for Design between DAS and theDesigner according to separate contract between DAS and Construction Manager. DAS is currentlyseeking design services from qualified firms for a project consisting of replacing 88 exterior baywindows on the Linden A, B, C, and D buildings at the Woodward Resource Center.Design services shall include:1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover pagefor a sample contract.1.3.2 All design disciplines necessary to complete the scope of work.1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with theOwner, Construction Manager, and Owner’s maintenance staff.1.3.4 Use of the State of Iowa‘s construction management software program for uploading alldocuments, submitting and approving pay apps, and construction administration. Thecost for the use of the software is paid by the Owner.1.3.5 At a minimum, design for construction for the following:1.3.5.1 Removal and replacement of approximately 88 operable exterior windows,including storm windows and screens. Evaluate whether replacements need tobe operable and if storm windows and screens are needed.1.3.5.2 Window design shall include the evaluation of the lintels and design for repairor replacement.1.3.5.3 Include water penetration testing of windows to be performed by the contractorin the specifications.1.3.5.4 Coordination with the State Historic Preservation Office as needed.1.3.6 Existing CAD/PDF drawings from a recent project for the Linden Court building will beprovided to the successful design firm. Accuracy of drawings shall be verified by thedesign firm. Original window drawings and specifications are not available.1.3.7 Field examination of the existing buildings.1.3.8 Design for scope of work. Provide material recommendations based on experience,quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.1.3.9 Provide minor drawing work to assist the Construction Manager in the development ofhazardous materials bid package. This shall include providing PDF backgrounds foridentification, by others, of hazardous materials removal.1.3.10 Designer shall include any and all survey work required for completion of project.1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shutdown requirements where required.1.3.12 Provide detailed input of design schedule to Construction Manager for overallincorporation into master schedule.1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times.1.3.14 Quality control during Design, Preconstruction and Construction.1.3.15 Compliance with all Federal, State, and applicable AHJ codes.1.3.16 Completion of State building and energy code documents, as required.1.3.17 Design review will be conducted at 50% construction documents, and 95% constructiondocuments. Dates for design review meetings to be coordinated with the design andproject team and set no later than the design kickoff meeting. Review will be conductedwith DAS Owner Representative, Construction Manager, and Facility Representative, at aminimum. Drawings, specifications and cost opinions (if applicable) shall be provided atleast five days prior to each review meeting. An additional review meeting may berequired at the end if there are discrepancies in cost opinions or constructability reviewquestions.1.3.18 Review with the Department of Inspections, Appeals, and Licensing’s Building CodeBureau for approval of plans or exemption from review. All fees associated with theBureau are the responsibility of the designer.1.3.19 Develop and distribute agendas and meeting minutes for all meetings during the designphase.1.3.20 Designer shall provide any information necessary to obtain utility rebates whereapplicable.1.3.21 Construction cost opinions provided by the Design Professional team during Design (at50% construction documents, and 95% construction documents) with a Final Estimate forconstruction included with bid documents, per Iowa Code.1.3.22 Construction drawings, specifications (the Construction Manager will produce Divisions00 and 01), and addenda.1.3.23 Provide bid alternates as determined during the course of design and bid packagedevelopment.1.3.24 Assist Owner and Construction Manager in obtaining bids from qualified contractors.1.3.25 Construction administration, including creation of the submittal and closeout items log,review of and responses to submittals and closeout documentation, RFIs, proposalrequests, change orders, pay applications, periodic site visits, attendance at projectmeetings as required, participation / development of contractor punch list, closeoutdocumentation review and approval, certificates of substantial completion, andcertificates of final completion, as well as development of Architectural SupplementalInstructions for design revisions, and punch lists within the construction managementsoftware program.1.3.26 Participation with project team during construction progress meetings as required.Designer shall participate in monthly conference calls during the construction period.1.3.27 Field Observation reports, with photos, submitted for each site inspection within five (5)days of the site visit.1.3.28 Acknowledgement that all documents are copyright to the State of Iowa and shall beturned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs andaddendums will be expected to be incorporated before final posting. Both the nativecomputer format and PDF versions shall be uploaded to the construction managementsoftware program at the end of the project.1.3.29 The Department requests lump sum pricing from the respondents to this RFP, with thelump sum base scope price being inclusive of all reimbursables, such as printing, mileageand travel expenses. The Department requests the fee proposal from the respondents tothis RFP be broken down as follows. These breakdown prices will be used as the scheduleof values for billing purposes.1.3.29.1 Construction Documents1.3.29.2 Bidding or Negotiation Assistance1.3.29.3 Construction PhaseInclude at minimum the following site/virtual visits:Design Kickoff/Building Evaluation50% Construction Documents95% Construction Documents100% Construction DocumentsPre-Bid MeetingConstruction Field ObservationSubstantial Completion/Punch ListDevelopmentFinal Completion/Punch ListVerificationOne Year Warranty Correction PeriodVisitIn-Person11--1411110Virtual--1------1Beyond these site visits, each proposing firm shall provide additional visits as they see fit tocomplete the work of design. In addition to the lump sum pricing, the Departmentrequests a unit price per construction inspection visit. This unit price will be additive ordeductive based on the number of actual visits made.1.4 ATTACHMENTS1.4.1 Photos of Linden Bay Windows
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026 Summer Sidewalk Repair P...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Iowa
Bid Due: 7/15/2026
DAS CC Historical Building El...
DAS CC Historical Building Elevator Replacements PH1 DAS CC Historical Building Elevator Replacements
Iowa Department of Administrative Services
Bid Due: 7/09/2026