Bolton Hill Sports Complex Phase II Addendum 1
Project Information
- Bid Title
- Bolton Hill Sports Complex Phase II Addendum 1
- Issuing Agency
- City of Veneta
- Location
- Oregon
- Published Date
- Mar 31, 2026
- Closing Date
- Apr 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: BHSC PH II_Addendum 1
Category: BOLTON HILL SPORTS COMPLEX PHASE II Status: Open Publication Date/Time: 3/30/2026 12:00 AM Closing Date/Time: Open Until Contracted Related Documents: - Attachment Preview
-
DOUGHERTY LANDSCAPE ARCHITECTSBolton Hill Sports Complex Phase IIDate: March 30th, 2026Veneta, OregonTo: All Plan Holders of RecordFr:Eric Parsons, DLA Inc.Re: Addendum #1The following clarifications and revisions for the above-reference project are hereby incorporated byaddendum to the previously issued bid documents.Project Manual – Revised: “Revise the bid documents so that all references to a bid closing date of‘Thursday, April 2nd, 2026’ or ‘April 2nd, 2026’ are changed to ‘Monday, April 6th, 2026’ or ‘April 6th,2026’ respectively, wherever they appear in the Project Manual (including the Invitation to Bid andInstructions to Bidders).”Project Manual – Instructions to Bidders; Page 3, Section 2 (f) “Bidder Responsibility”: Addition - Allquestions regarding the Project must be submitted in writing to Kyle Schauerkschauer@venetaoregon.gov, no later than 5:00 PM on April 1st, 2026.Project Manual – Instructions to Bidders; Page 7, Section 12 “Solicitation Schedule”: Replace “April 6(Monday) – Notice of Intent to Award” with “April 7 (Tuesday) – Notice of Intent to Award.”Project Manual –Bid Schedule, Page 11 &12 - Revised: The attached Addendum #1 - Bid Schedulesupersedes the previously issued Bid Schedule.Project Manual – SECTION 32 33 00- SITE FURNISHINGS,• Part 1, SECTION 1.1.F – Add the Following: “F. Skate Stops”• Part 2, SECTION 2.6 – Add the Following: Product: “2.6. Skate Stops: Available from SkateStoppers Diamond Insert Series (http://www.skatestoppers.com/Insert-DiamondSS.html)Model: D R1-8, Material: Stainless Steel.”• Part 3, SECTION 3.2.D – Add the Following Installation Instructions: “ D. Skate Stops: Install permanufacturer’s written instructions and in locations show on Detail 1/L400.Plans – Sheet C1.2 Revised: The attached Plan Sheet C1.2 supersedes the previously issued plan sheetsin their entirety. Changes include:• Legend update to add tree removal symbolPlans – Sheet C2.0 Revised: The attached Plan Sheet C2.0 supersedes the previously issued plan sheetsin their entirety. Changes include:• Keynote 8 addedPlans – Sheet C3.0 Revised: The attached Plan Sheet C3.0 supersedes the previously issued plan sheetsin their entirety. Changes include:• Grades labeled.474 Willamette Street, Suite 305 Eugene, Oregon 97401P 541 683 5803 F 541 683 8183www.DLAdesign.comPlans – Sheet C4.0 Revised: The attached Plan Sheet C4.0 supersedes the previously issued plan sheetsin their entirety. Changes include:• Drainage trench dimensions added• Scale updatedPlans – Sheet C5.1• Detail 1/C5.1 Note (4) Removed ‘Turf Grasses”Plans – Sheet C6.0 Revised: The attached Plan Sheet C6.0 supersedes the previously issued plan sheetsin their entirety. Changes include:• Scale updatedPlans – Sheet L400• Detail 6/L400 Note - DOWEL RAMP TO ADJACENT PAVING Add the following Instructions: “Atthe construction joint between the sidewalk and play ramp slab, install 5/8 in. smooth steeldowel bars, 12 in. in length, with 6 in. embedded in each adjacent concrete panel. Place dowelsat 20 in. on center, horizontally at mid‑depth of the slab, aligned normal to the joint. Dowelsshall be corrosion‑protected where required by the project specifications.”Plans – Sheet L401• Detail 11/401: Replace 18” depth dimension with 24” dimension.• Detail 12/L401: Replace 18” main line depth dimension with 24” dimension. Replace 15” lateralpipe depth dimension with 18” dimension.Geotechnical Report – Addition: The Geotechnical Report is included as part of Addendum #1- 10-250148-001 (Bolton Hill Sports Park Improvements, Veneta, OR FINAL).pdfContractor Questions - What is the estimated construction budget? Response: No, construction budgetwill be provided.Contractor Questions - What temporary utilities are going to be required for this project? What are theassociated permits with those utilities? Response: Contractor to determine. See Section 01500.Contractor Questions – Bid Item No 37 Topsoil for 439 CY. Does this quantity include the filterstrip? Response: No, topsoil calcs do not include filter strip growing mediaContractor Questions - Some spots in the project files say the contractor has 150 days from notice toproceed to complete the work, and other spots say 180 days. Response: As per the project manual -theproject which will be substantially completed within 150 days of the receipt of the notice to proceed andthe final completion day is 180 days from notice to proceed - 30 days after substantial completion.Contractor Questions - The specs state all permits are required to be obtained by the contractor. Whatare the expected required permits and their associated fees? Response: Over the counter plumbingpermit for the drinking fountain.Contractor Questions – The same is mentioned for the utility connection work. Can you provide thesame clarification? Response: No additional permits required.Contractor Questions - I also haven’t seen any answers from questions at the pre bid meeting posted. Isthat anticipated at some point? Response: At this solicitation, all questions are required to besubmitted by email so that we can provide a formal, written response and ensure consistentcommunication to all bidders. Answers to eligible questions are being addressed through addenda orwritten clarifications, rather than posting a separate Q&A document from the pre‑bid meeting.Contractor Questions - Can you clarify who is responsible for testing on this project? Response:Contractor to pay for testing as noted in project manual including Sections 31 20 00 – Earth Moving, 3212 16 – Asphalt Paving, 32 13 13 – Concrete PavingContractor Questions - Please confirm that no electrical scope (site lighting, power distribution, etc.) isincluded in this project. Confirm that only low-voltage irrigation wiring is required and a location forconnection to Phase 1 will be provided. Response: Yes, low voltage irrigation wiring is all that is requiredwith point of connection to phase 1 shown on irrigation plan.Contractor Questions – Bid Item 25 Drainage fill – is this intended to cover the 6” depth of drainage fillwithin the play area only? Please clarify. Response: Drainage fill is for all drainage fill on site includingunder the play area, filter strip and drainage trench.Contractor Questions – Drainage trench. It appears there is just one very small area near the drinkingfountain. Please clarify/confirm the extent of the drainage trench. Please clarifymeasurement/payment. Response: Dimensions added to plan to clarify extent of drainage trench. Payfor drainage trench will be broken out by component parts.Contractor Questions – There appears to be 2 new concrete spillways/splash pads shown at the eastend of the new parking lot, however there are no notes or callouts for them to be constructed. Pleaseclarify. Response: The splashpads at the planter will be constructed during Phase 1 with the planter.Contractor Questions – Filter strip (4” perf pipe/fabric/drainage fill, 12” growing medium). Will a filterstrip bid item be added in a forthcoming addendum? Or will each item within be included in separatebid items with new quantities? Response: Each item will be included separately to the bid items. Seeupdated quantitiesContractor Questions – Bid Item 11 Concrete curb ramp – 2EA. Sheet C2.0: There appears to be 2 EAramps at the crosswalk on the entry drive lane, however there is a 3rd note 2 and a long strip of whatappears to be detectable warning shown near the ADA parking stalls. The long strip of detectablewarning shading has no note 8 callout. Please clarify. Response: There are only two "Curb Ramps" atthe crosswalk on the entry drive. The 3rd (2) keynote is incorrect and will be removed. The long strip ofdetectable warning in front of the ADA parking stalls is flush curb. Keynote 8 will be added to plans.Contractor Questions – Parking Lot elevations - After stripping, there appears to be some low areas thatwould need some minor fills to design sub grade (2-6” in some areas, none needed in others). It appearsthere will be app. 100 CY needed to bring the parking lot area up to sub grade prior to the 12” crushedrock base. It appears there might be app. 100 CY of usable excavated material from the site. Will this bemeasured/paid under the crushed rock item for more CY, or do you expect/anticipate the contractor touse excavated material and include costs within the excavation item? Please clarify. Response: Per specsection 31 20 00 Earth Moving, soil fill under walks and pavements is to use engineered fill (section3.15). See Section 2.1 for engineered fill description. Engineered fill is to be bid as part of theEarthwork/Rough grading bid item.Contractor Questions – The specs also mention lime and cement treatments on the base, but I don’t seethose specifically called out anywhere to be performed. Can you please confirm if these will berequired? Response: No lime and cement treatment required.Contractor Questions – Sheet C1.2, there is mention that any exposed utilities need to be plugged perdetail 9 on C5.1, but that detail doesn’t show the plugging details. There are also no notes on the sheetsto help quantify what all needs to be plugged. Can clarification be provided on this please? Response:No existing utilities are expected to be abandoned and needing to be plugged on this phase. Sheet noteremoved.Contractor Questions – Also on sheet C1.2 there are bolded X’s with circles around them, but no note orlegend to state what these are for. Please clarify. Response: Bolded X's are for tree removal. Sheetlegend updated to reflect tree removal.Contractor Questions – At the east end of the parking lot, it appears the new standard curb is to abutthe phase 1 planter wall? Is that section to be dowelled and epoxied? Response: New standard curbabutting the plant wall does not need to be dowelled and epoxied to planter wall.Contractor Questions – Sheet C1.2 mentions that the contractor needs to obtain a demolition permit.Can clarification be provided on the fees required for this? It also mentions right below that, that weneed to obtain any other required permits. Can clarification be provided on what other permits areneeded and the fees associated with those as well? Response: No separate demolition permit requiredand no other permits other than plumbing anticipatedContractor Questions - I don’t see any details to show what the benches or litter receptacles are. Canwe get details so we fully understand what we are installing and the required process? – Response: SeeSpecificationsContractor Questions - At the NE side of the project, the boundary between phase 1 and 2 is shown, butit’s not super clear what part of the curb and outlets are expected to be completed in phase 2. It alsoappears the curb is marked as double on the SW face of this area, is that correct? I also don’t see anydetails or notes on the splash pad / outfalls in this area. Can you please clarify these? – Response:Planter wall and curb inlets are being constructed as part of phase one . Phase 2 will construct the curbthat is against the planter wall.Contractor Questions - Can you please provide clarification on the meaning and location of Sheet Note 5on C3.0? – Response: There is an existing fence along the south property line that needs to be preservedand protected during construction. Provide a 1 foot flat bench at existing grade at existing fence as tonot undermine and damage fence during construction.Contractor Questions - On Sheet C4.0 – I see the invert elevations for the pipe, but not finish elevationsor rim elevations for the structures, can these be provided so we can get an accurate depth for all theutilities? – Response: Grading plan (sheet C3.0) contains all elevation points for finish grade of proposedwork. We do not provide rim elevations for cleanout as they are to be set at the finish grade elevation.Sheet C4.0 does give rim elevations for landscaping drains and outfalls.Contractor Questions - The asphalt specs mention a pre-paving herbicide treatment, don’t specify if itwill be required for this project. Can you confirm please? – Response: Provide treatment and applicationper spec section 32 12 16 Asphalt Paving.End of Addendum # 1BID SCHEDULE1 Construction Mobilization / Demobilization/General Conditions1LS2 Construction Survey1LS3 Demolition and removals1LS4 Earthwork/Rough Grading1LS5 Tree Protection1LS6 Erosion/ Sediment Control1LS7 1/2" Dense HMAC - 4" thickness14,744SF8 Typical Concrete Paving 5" Thickness (Vehicular)789SF9 Typical Concrete Sidewalk 4" Thickness5,559SF10 Base Course622CY11 Concrete Curb Ramp2EA12 Standard Curb655LF13 Flush Curb66LF14 Wheel Stop6EA15 Curb Ending9EA16 ADA Parking Sign2EA17 Striping (Parking and Basketball court)1LS18 Drainage Fabric519SF19 4" Perforated Pipe200LF20 Storm Landscape Drain1EA21 Rip -Rap 2"-4" Ballast Aggregate6CF22 2" Water Line132LF23 Drinking Fountain & Installation1EA24 Double Check Valve Assembly1EA25 Drainage Fill1LS26 ADA Ramp for Play Area - Complete Installation1LS27 12" Concrete Thickened Edge at Play Area209LF28 Concrete Seatwall55LF29 Benches Installation (OFCI)4EA30 Bike Rack Installation (OFCI)5EA31 Litter Receptacle Installation (OFCI)1EA32 Basketball hoop including Sleeve & Footing1EA33 Proposed Boulders7EA34 Double Swing Gate1LS35 Concrete Mow Edge as per detail 3/L40031LF36 Skate Deterrents21EAAddendum #1BID SCHEDULEPage | 11
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Demolition Robot Active Contract Opportunity Notice ID W50S8Z26QA016 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 8/04/2026
Project No. 2026-009 Faciliti...
Description: Project No. 2026-009 Facilities Building Construction Project Bids Due on 7/14/2026 at
City of The Dalles
Bid Due: 7/14/2026