2026 Storage Building Expansion Design City of Greenville
Project Information
- Bid Title
- 2026 Storage Building Expansion Design City of Greenville
- Issuing Agency
- City of Greenville
- Location
- Michigan
- Published Date
- Dec 22, 2025
- Closing Date
- Jan 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project Bid/Proposal Bid Opening Date & Time bid Tab 2026 Storage Building Expansion Design
City of GreenvilleBid Packet
AddendumBids Due: January 13, 2026, at 2:00 pm
Zoom Meeting Link
https://us02web.zoom.us/j/8821090714
Meeting ID: 882 109 0714
Join By Phone
1-312-626-6799 US (Chicago)Bid Tab - Attachment Preview
-
ADVERTISEMENT TO BID2026 Greenville Storage Building Addition Design-BuildThe City of Greenville will receive sealed bids for the design and construction of a 32’ x 65’ pole building extension forthe City of Greenville. The building project will include all labor, equipment and materials to design the componentsaccording to these specifications; prepare the site; and construct the building. This is an extension of an existing polebuilding and much of the work will be to match the pattern that is already there. Components of the construction include:site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing;doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage andconveyance systems as an additive alternate to the bid. The bids will be received until Tuesday, January 13, 2026 at2:00 p.m., in the City Hall Conference Room. All bids will be publicly opened and read aloud at that time.Specifications and information for bidders may be obtained at the City Clerk's Office at Greenville City Hall, 411 S.Lafayette, Greenville, Michigan 48838 or on-line at www.ci.greenville.mi.us.KRISSI BROTTGreenville City ClerkINSTRUCTIONS TO BIDDERSSCOPE OF WORK:The scope of this project is to extend the north and south walls and roof line of the existing 32’ x 40’ pole barn structure, locatednorth of the Greenville Area Community Center, 900 E. Kent Rd, Greenville, MI 48838. The extensions will be to the eastapproximately 65 feet. Drawings showing post spacing and typical characteristics are included at the end of this specification.Since this is an extension, it is intended that exterior cladding, doors, locks, lighting and roofing shall match the existing buildingin elevation, materials, installation and color.The exterior cladding on the current east wall is desired to be removed and reused if possible. There is no need to provide adoorway between the existing and proposed spaces.There are four exceptions to matching the existing building characteristics:1. There is an interior space identified in the center of the extension as “Scene Shop”. This space shall beseparated from the storage spaces on either side and above so that dust from sawing and sanding will notreach the storage spaces. Interior walls and the ceiling can be enclosed with OSB materials of sufficientthickness to prevent warping with temperature and moisture changes. These interior walls and ceiling shall beinsulated with batt-type insulation (R=23).2. Lighting in the Scene Shop shall include LED fixtures designed so that the floor space is illuminated to 75-100lumens per square foot and include a 5-year warranty on parts and labor.3. The Scene Shop area will require an electric means to control temperature with appropriate venting and safetyfeatures and include a 5-year warranty on parts and labor.4. The Additive Alternate consideration shall include a garment storage and conveyance system similar to thattypically found in a dry-cleaning operation. It is intended that costumes would be stored hanging near therafters with a dip in the track to bring them to 4 feet above the floor for retrieval then back to the ceiling. Amotorized conveyance method to advance the costumes along the track shall be included. Each storage spaceshall be equipped with this type of system capable of holding 500 articles of clothing. For design purposes eachcostume can be considered to weigh from 1-5 pounds. The design of this system shall include necessarychanges to rafter characteristics to support additional dead and live loads. The electrical needs for the motorsto run the conveyance system may also require alterations to the existing electrical panel and supply. Theexisting supply to the building is a 60 amp, 120/240 volt single phase direct burial cable shared with a serviceto the nearby concession building. If supply upgrades are necessary, the City Engineer will need to be advised,but the price is outside the scope of the Bid. Service upgrades will be the responsibility of the City.The design will need to comply with all current Building Codes. Refer to permitting agencies for applicable codes.BIDDER'S INVESTIGATION: Prior to submission of the bid, all bidders shall make a careful examination of the site (shown onthe enclosed map), the Scope of Work, the specifications included herewith, and shall have become informed as to the locationand nature of the proposed work, general existing conditions, and all other matters that may affect the cost and the time ofcompletion of the contract. Access to the building can be coordinated through the Greenville Area Community Center, (616)754-9163.12026 Greenville Storage Building Addition Design-BuildInstructions to BiddersBid Opening: January 13, 2026Page 2WORKMANSHIP: All construction shall be completed in a first-class workmanlike manner. The City will perform randominspections of the site, but the Building Inspector and Electrical Inspector will be responsible for approvals based on permitconditions.WARRANTY:The contractor will guarantee all materials and workmanship for a period of one (1) year from the date of final completion. Thecontractor shall request a completion certificate when all work is completed. The warranty period shall begin on the date of thecertificate of substantial completion.SUPERVISION: The contractor shall always have a thoroughly competent supervisor in charge of the work during construction.Anyone deemed incapable of supervising by the City shall be replaced immediately upon request by someone who issatisfactory.LABOR, MATERIALS & EQUIPMENT: The contractor shall furnish all labor, materials, tools, and other equipment necessary toproperly complete the work according to the specifications, as well as any safety devices necessary for safe operations, or asrequired by law.INSURANCE: The contractor shall not commence, nor allow a sub-contractor to commence, work under this contract until hehas obtained all insurance required under this heading and such insurance has been approved by the owner.1. Workmen's Compensation Insurance as required by Michigan Workmen's Compensation Laws.2. Contractor's Public Liability Insurance shall be furnished for $100,000 limits for injuries to any one person and $500,000 forany one accident.3. Contractor's Property Damage Insurance shall be furnished for $100,000 limits for damages as a result of any one accidentand $500,000 limits as an aggregate.All policies required shall be written by a company licensed to do business in the State of Michigan. The City shall be named asan additional named insured on all liability policies. A copy of the policy shall be submitted to the City prior to beginning thework.UNCOVERING AND CORRECTION OF WORK: The Contractor shall notify the City immediately of any unsuitable conditionsfound at the project site, whether or not the contractor is liable.Should any defect develop or become apparent during the construction or warranty period due to improper materials orworkmanship the same shall be corrected by the Contractor or subcontractors. This shall include any adjacent work that mightbe affected by making such corrections. Corrections shall be made without cost to the City.BONDS: A Bid Bond or certified check, payable to the City of Greenville, in the amount of 5% of the bid amount will be requiredas bid security. The Bid Bond or certified check will be released when the Contract has been executed.A Performance Bond and a Labor and Material Payment Bond will be required in the amount of 100% of the bid amount prior toexecution of the Contract. The bonds must be on forms that conform to all laws and regulations of the State of Michigan.22026 Greenville Storage Building Addition Design-BuildInstructions to BiddersBid Opening: January 13, 2026Page 3EQUIPMENT: The Contractor shall furnish all equipment required to perform the work in the attached specifications and anysafety devices the contractor feels necessary for safe operations, or as required by law.LICENSING & PERMITS: The Contractor shall comply with all local, state and federal regulations and statutes, and shall belicensed to perform work in the State of Michigan. Subcontractors shall meet these same standards.The Contractor shall provide the Building Permit from Imperial Municipal Services of Rockford, MI. Phone: (616) 863-9298.Email: info@imsinpections.com. The Electrical, Plumbing, Mechanical Permits are obtained from the Montcalm County BuildingDepartment. (989) 831-7394. The cost to obtain permits is incidental to the Project.IDENTIFICATION OF REFERENCES, SUBCONTRACTORS AND SUPPLIERS: All bidders must submit a list of references,subcontractors and known material suppliers with their BID on the supplied forms. These mayl be a consideration in the awardof the contract.CONTRACT TIME: It is anticipated that the award of the bid will take place on January 20, 2026 at the regular City Councilmeeting, followed by a Notice of Award. The Contractor shall provide the necessary bonds and insurance for the work andexecute the Contract within 10 days of the receipt of the Notice. A Notice to Proceed will follow execution which will allow theCONTRACTOR to start design work. The design shall be approved prior to proceeding with material procurement and permitapplications. The CONTRACTOR shall begin construction when approvals and permits have been obtained. Once started, thework shall be continuous, weather permitting until completion. For purposes of comparing BIDS, April 1, 2026 should beconsidered as the Project commencement date. The BIDDER shall indicate the number of days for completion on the BIDFORM, which may be a consideration for Recommending the Award of the BID. The construction time frame is subject toLiquidated Damages.PROPOSALS: All bids must be submitted on the attached bid form and be received in the Office of the City Clerk at City Hall,411 S. Lafayette Street, Greenville, Michigan 48838, on or before Tuesday, January 13, 2026 at 2:00 p.m. A bid will beconsidered complete with the submittal of the three pages (pages 4, 5, 6) of the Bid Proposal, signed and filled out.BID ENVELOPE LABELING: Please mark "Storage Building" on the outside of the envelope and submit to the City Clerk'sOffice prior to the bid opening.ADDENDA: If addenda are required on this project, they will be posted to the website www.greenvillemi.org and distributed toknown interested parties no later than 12:00 p.m. (noon) on Friday, January 9, 2026. It is the responsibility of the bidder to checkfor addenda before the bid and acknowledge any addenda on the bid form.QUESTIONS: Questions may be directed to Doug Hinken, in the City Engineers office at (616) 754-5645 ordhinken@greenvillemi.org.RIGHTS RESERVED BY THE OWNER: The City of Greenville reserves the right to accept or reject any or all bids. Thecompetency and responsibility of bidders will be considered in awarding contracts. The Owner does not obligate himself toaccept the lowest or any other bid. The Owner reserves the right to waive any informality in any or all bids. The Owner reservesthe right to make additions or deletions from the quantity of work to be performed.32026 Greenville Storage Building Addition Design-BuildInstructions to BiddersBid Opening: January 13, 2026Page 4LIQUIDATED DAMAGES:The Project must be complete by the time specified in the BID or be subject to liquidated damages in the amount of $800 percalendar day. Extensions of Time for justifiable reasons shall be requested in writing no more than 10 days from the time theContractor becomes aware of the need for more time. The City shall respond in writing within 2 business days as to whether thereason for the Time Extension request is approved.P.A. 517 COMPLIANCE, CERTIFICATION OF NO IRAN LINKED BUSINESS:The BIDDER will need to certify that it is not an "Iran linked business" by signing the certification on the BID FORM. An “Iranlinked business” means either of the following:(i) A person engaging in investment activities in the energy sector of Iran, including a person that provides oil orliquefied natural gas tankers or products used to construct or maintain pipelines used to transport oil or liquefiednatural gas for the energy sector of Iran.(ii) A financial institution that extends credit to another person, if that person will use the credit to engage ininvestment activities in the energy sector of Iran.4
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Revised Registration Closing ...
Follow Revised Registration Closing Date: Engineer Equipment Industry Day - Selfridge Air National
DEPT OF DEFENSE
Bid Due: 7/07/2026
Revised Registration Closing ...
Follow Revised Registration Closing Date: Engineer Equipment Industry Day - Selfridge Air National
DEPT OF DEFENSE
Bid Due: 7/07/2026