Pavement Markings Program 2026
Project Information
- Bid Title
- Pavement Markings Program 2026
- Issuing Agency
- Town of Falmouth
- Location
- Massachusetts
- Published Date
- May 18, 2026
- Closing Date
- May 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Pavement Markings Program 2026
Category: Public Works - Highway Division Status: Open Description: The Work shall include the furnishing and installing of alkyd traffic paint modified with chlorinated rubber and glass beads conforming to Section M7 of the Standard Specifications. The white or yellow reflectorized traffic paint shall comply with Section 860 of the Standard Specifications. Arrows and Legends shall comply with the current Manual on Uniform Traffic Control Devices.
Publication Date/Time: 5/1/2026 12:00 AM Closing Date/Time: 5/22/2026 10:00 AM Contact Person: Jim Kempton, Deputy Director
jim.kempton@falmouthma.govRelated Documents: - Attachment Preview
-
TOWN OF FALMOUTH, MASSACHUSETTSDEPARTMENT OF PUBLIC WORKSREQUEST FOR SERVICESFORAPPLICATION OF PAVEMENT MARKINGSVARIOUS LOCATIONS THROUGHOUT FALMOUTH2026DIRECTOR OF PUBLIC WORKSPeter M. McConarty, P.E., P.L.S.Falmouth Department of Public Works 416 Gifford StreetFalmouth, MA 02540Phone: (508) 457-2543 FAX: (508) 548-1537General ConditionsTable of ContentsARTICLE 1 – DEFINITION OF TERMSARTICLE 2 – CONTRACT DOCUMENTS, INTENT, AMENDING, AND REUSEARTICLE 3 – CONTRACTOR’S LIABILITY INSURANCEARTICLE 4 – CONTRACTOR’S RESPONSIBILITIESARTICLE 5 – UNIT PRICE WORKARTICLE 6 – WARRANTY AND GUARANTEE; TESTS AND INSPECTION;CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORKARTICLE 7 – PAYMENT BONDSARTICLE 8 – EFFECTIVE DATEARTICLE 9 – CHANGES IN THE WORKARTICLE 10 – ENGINEER______________ARTICLE 11 – WAGE RATESARTICLE 12 – TERMINATION OF CONTRACTARTICLE 13 – MISCELLANEOUS_______ARTICLE I - DEFINITIONS OF TERMS1. County means the County of Barnstable, MA through the County Commissioners.2. Successful Bidder means the lowest, qualified, responsible, and responsive Bidder to whom theTown makes an award.3. Owner means the following entities/municipalities participating in this contract inMassachusetts: Barnstable, Brewster, Dennis, Eastham, Falmouth, Harwich, Orleans, Sandwich,Wellfleet and Yarmouth.4. Town means the individual town identified in the “Owner”5. Designer, Architect, Engineer or any pronoun or phrase in place thereof: N/A Designer(s) shallperform the duties and exercise the rights herein conferred. In the case of death, resignation,inability or refusal of said Designer to act, or the termination of his employment, the Countymay appoint another person as Designer of which notice shall be given in writing to theContractor, which person shall perform all the duties and exercise all the rights of the Designerhereunder.6. Contractor or General Contractor or a pronoun in place of it: the party or parties Contracting toperform the work covered by this Contract or the legal representatives of said party or parties.7. Superintendent or Construction Supervisor or a pronoun in place of it: the competent,responsible employee regularly employed by the Contractor and designated to be in full timeattendance at the project site throughout the prosecution and progress of the work and whoshall have complete authority to act for the Contractor.8. As Directed, As Permitted, As Required, As Determined or words of like effect: the direction,permission, requirement or determination of the Designer. Similarly, approved, acceptable,satisfactory or words of like import shall mean approved by or acceptable or satisfactory to theDesigner, except as may be otherwise determined by the Director.9. Or equal or words of like import: equal in the opinion of the Designer except as may beotherwise determined by the County pursuant to the provisions of G.L. Chapter 30, section 39M.10. Contract Documents or Contract: the Notice to Contractors, Information to Bidders, Form ofGeneral Bid, Contract, General Conditions, Specifications and Plans and all addenda issuedduring the bidding period, change orders and policies and procedures of the County attachedhereto or referred to, all of which constitute one instrument.11. Mass State Building Code: all applicable rules and regulations to which the County is subject andwhich are contained in the code authorized by Chapter 802 of the Acts of 1972 including allamendments thereto.12. Plan(s):drawing(s).13. Change Order: a written order not requiring the consent of the Contractor, signed by theAwarding Authority or the Director and designated as an approved change order, directing theContractor to make changes in the work within the general scope of the Contract, or, anywritten or oral order from the Awarding Authority or the Director which causes any change inthe work, provided that the Contractor gives the County written notice stating the date,circumstances, and source of the order and that the Contractor regards the order as a changeorder.14. Contract Modification: any written alteration in plans or specifications, period of performance,price, quantity, or any other provisions of the Contract accomplished by mutual action of theparties to the Contract.Where reference is made in the Contract documents to Publications, Standards or Codes issued byAssociations or Societies, the intent shall be to specify the current edition of such publication orstandard including revision in effect on the date of the Contract advertisement notwithstanding anyreference to a particular date.ARTICLE 2 – CONTRACT DOCUMENTS, INTENT, AMENDING, AND REUSEIntent:2.1 The Contract Documents comprise the entire Agreement between the COUNTY and CONTRACTORconcerning the Work. The Contract Documents are complementary: what is called for by one is asbinding as if called for by all. The Contract Documents will be construed in accordance with the lawof the place of the Project.2.2 It is the intent of the Contract Documents to describe a functionally complete Project or Service (orpart thereof) to be constructed in accordance with the Contract Documents. Any Work, materials orequipment that may reasonably be inferred from the Contract Documents as being required toproduce the intended result will be supplied whether or not specifically called for. When wordswhich have a well-known technical or trade meaning are used to describe Work, materials orequipment such words shall be interpreted in accordance with that meaning. Reference to standardspecifications, manuals or codes of any technical society, organization or association, or to the Lawsor Regulations of any governmental authority, whether such reference be specific or by implication,shall mean the latest standard specification, manual, code or Laws or Regulations in effect at thetime of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids), except asmay be otherwise specifically stated. However, no provision of any referenced standardspecification, manual or code (whether or not specifically incorporated by reference in the ContractDocuments) shall be effective to change the duties and responsibilities of the County, the Towns orCONTRACTOR, or any of their agents or employees from those set forth in the Contract Documents,nor the Notice to Proceed.ARTICLE 3 CONTRACTOR’S LIABILITY INSURANCE3.1 CONTRACTOR shall purchase and maintain such comprehensive general liability and otherinsurance as is appropriate for the Work being performed and furnished and as will provide protectionfrom claims set forth below which may arise out of or result from CONTRACTOR’S performance andfurnishing of the Work and CONTRACTOR’S other obligations under the Contract Documents, whether itis to be performed or furnished by CONTRACTOR, by any Subcontractor, by anyone directly or indirectlyemployed by any of them to perform or furnish any of the Work, or by anyone for whose acts any ofthem may be liable:3.1.1 Claims under workers’ or workmen’s compensation, disability benefits and other similaremployee benefit acts;3.1.2 Claims for damages because of bodily injury, occupational sickness or disease, or deathof CONTRACTOR’S employees;3.1.3 Claims for damages because of bodily injury, sickness or disease, or death of any personother than CONTRACTOR’S employees;3.1.4 Claims for damages insured by personal injury liability coverage which are sustained (a)by any person as a result of an offense directly or indirectly related to the employment of such personby CONTRACTOR, or (b) by any other person for any other reason;3.1.5 Claims for damages, other than to the Work itself, because of injury to or destruction oftangible property wherever located, including loss of use resulting therefrom;3.1.6 Claims arising out of operation of Laws or Regulations for damages because of bodilyinjury or death of any person or for damage to property; and3.1.7 Claims for damages because of bodily injury or death of any person or property damagearising out of the ownership, maintenance or use of any motor vehicle.The insurance required above shall include the specific coverages and be written for not less than thelimits of liability and coverages provided as follows:1. Workmen’s Compensation: In accordance with the Workmen’s CompensationLaws that are applicable to the employees engaged in the Work. The limit ofEmployer’s Liability Insurance shall be not less than $500,000 each accident.2. Public Liability Insurance for Personal Injury:a. Individual limit of $1,000,000 each person.b. Total limit of $ 3,000,000 for each accident.3. Property Damage Insurance:a. Each claim $ 1,000,000.b. Aggregate $ 3,000,000.4. If the CONTRACTOR sublets any portion of his work, then he shall also provide:a. Contractor’s Protective Liability Insurance:(1) Individual limit for personal injury of $1,000,000.(2) Total limit for personal injury for one accident of $3,000,000.b. Contractor’s Protective Property Damage Insurance with a limit of$1,000,000/$3,000,000.
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number: 26-039 Bid Title: Regain Runway 15 Threshold Category: Construction Status: Open
City of Westfield
Bid Due: 7/15/2026
Z1DZ--Replace HVAC Components...
Follow Z1DZ--Replace HVAC Components Building 2 TeleHealth Rooms at Central Western MA VAMC
Federal Agency
Bid Due: 7/13/2026