Frisco Campus Chilled and Heating Water Loop Extension
Project Information
- Bid Title
- Frisco Campus Chilled and Heating Water Loop Extension
- Issuing Agency
- Collin College
- Location
- Texas
- Published Date
- Jun 22, 2026
- Closing Date
- Jul 28, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Frisco Campus Chilled and Heating Water Loop Extension
Addenda: 0
Release Date: 6/22/2026
Due Date: 7/28/2026
Frisco Campus Chilled and Heating Water Loop ExtensionFollowCompetitive Sealed ProposalProcurement33055 , 82000 , 89087 , 90924 , 91100 ... show allProject ID: FY2026-CSP-059Release Date: Monday, June 22, 2026ยท Due Date: Tuesday, July 28, 2026 3:00pmPosted Monday, June 22, 2026 3:00pmAll dates & times in Central TimeDraft Response Events RSVP No Bid35 days, 18 hours, 40 minutesOverview
Post Information
Posted At:Mon, Jun 22, 2026 3:00 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryCollin College is seeking qualified proposals for the Frisco Campus Chilled and Heating Water Loop Extension.
Pending approval by the Board of Trustees, work must be completed during the course of Fiscal Year 2027.
Extreme coordination between the College and the selected contractor will be required to ensure there is no disruption to campus heating or cooling needs. A requirement of this project is that the campus remains operational during normal business hours; therefore, any planned temporary shutdowns must occur outside of normal business hours. Shutdowns must be coordinated with the college at least two weeks in advance.
Excavation will occur in various locations throughout the campus. The contractor shall bear the cost and burden of returning the site to its original condition, or better. The College will not be responsible for any underground utility damages or property damages. The contractor should perform their due diligence to identify all underground utilities or obstructions.
The contractor is expected to proactively identify and propose value engineering opportunities.
The contractor shall include cost for double shifts and/or 7 day work weeks during the project , including specifically designated shut-down windows, if needed, to complete project on time. A project schedule must be submitted with each proposal. The contractor must identify and inform the College of all long lead items (10 weeks+).
BackgroundThe Collin College Frisco Campus is experiencing significant growth while the campus and its infrastructure continues to age. The intent of this project is to replace aging equipment and infrastructure, as well as increase the cooling and heating capacity from the Central Utilities Plant.
Timeline
Proposal Release Date:June 22, 2026Pre-Proposal Meeting (Non-Mandatory):July 8, 2026, 10:00am9700 Wade Blvd, Frisco, TX 75035, Library, Room L135Question Submission Deadline:July 14, 2026, 12:00pmProposal Submission Deadline:July 28, 2026, 3:00pm - Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Road Maintenance and Repair a...
Road Maintenance and Repair at Devil's River State Natural Area - Dan Hughes
State Government of Texas
Bid Due: 9/04/2026
IFB 2026-B14 Firecracker & Ma...
Bid Number: IFB 2026-B14 Bid Title: IFB 2026-B14 Firecracker & Main Street Traffic
City of San Marcos
Bid Due: 8/24/2026