Amendment 1 Weight Rooms Equipment Install HC-03-31-26A
Project Information
- Bid Title
- Amendment 1 Weight Rooms Equipment Install HC-03-31-26A
- Issuing Agency
- Columbia County School District
- Location
- Georgia
- Published Date
- Mar 16, 2026
- Closing Date
- Mar 31, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- Amendment 1 Weight Rooms Equipment Install HC-03-31-26A
- Attachment Preview
-
Columbia County School DistrictPURCHASING DEPARTMENT4781 Hereford farm Road, Evans, GA 30809Tele: (706) 541-2723 ext. 5108 Fax: (706) 855-3843 Email: Hudson.Chandler@ccboe.netAmendment 1WEIGHT ROOM EQUIPMENT INSTALLNO. HC-03-31-26ASealed bids will be accepted at the office of Mr. Hudson E. Chandler, Purchasing Supervisor,Columbia County School District, Business Department, 4781 Hereford Farm Road, Evans, GA30809 no-later-than DUE DATE March 31, 2026 @ 2:00 P.M.Any bid received later than the specified date and time, whether delivered in person ormailed, may be disqualified.The CCSD reserves the right to reject any or all bids and to accept any bid deemed mostadvantageous to the Columbia County School District and to waive any informalities in bidding.Hudson E. ChandlerPurchasing SupervisorColumbia County School DistrictWeight Room Equipment InstallBid Amendment 1, Request HC-03-31-26AResponses to questions.1)Do you have a CAD file or rendering of the rooms with the dimensions? Included2) Is the equipment listed for each school or is the total on the equipment both schools (for example 5 racks willgo to Evans and 5 to Lakeside?) or 10 benches for each school or is it 20 per school? For example, item #3quantity 20 – landmine is for one school. Please provide the price for one set of quantity 20 landmine. Thedescription of quantity 20 landmine is for one school. Installation total is two schools.3) will both schools be ready for install at the same time or do they have different time frames? As early in thesummer as possible4) can I submit more than 1 Proposal? yes5) Can I deliver quotes in person? yes6) can you provide school logos for customization? Logos can be found on school websites and some havebeen included.https://evanshs.ccboe.net/https://lakesidehs.ccboe.net/7) Line item #1 . What gauge of steel is being specked? 12 gauge.8) line # 11-15 . Are these plates going to have logos or no logos? yes9) Line item 18 > are these the soft med ball styles or the old school hard med balls or some other type? I wouldassume the soft med ball style . soft10) line item # 20 - Are these hex dumbbells? not specified11) line item 19 - can I substitute (2) 4 tier med ball / kettle bell rack for (4 ) two tier racks? As long as it holdsthe materials, please note alternate12) line item # 20 - Can i substitute a 25lb pair of lifting Chains or a 40 lb instead of 28lb? yes, clearly label allchanges that very from original specificationsFirst is there current equipment that needs to be removed or moved from the room? If so are theywilling to remove and move on their own or would the installers need to include that as well?Room will be empty1. When can customer receive? (you do not want equipment showing up before school can receiveor before room is done) –We do not want the equipment being delivered with no one to unload,place in designated locations and assemble. The equipment is to be set up in the room. Asearly in the summer as possible2. Is room ground level? – Yes3. Does room have double door access? – Yes4. Is room close to a parking lot? – Yes5. Are there any stairs leading to room indoor or outdoor? – No. There is a curb.If room is not ground level is there an elevator? What is the size/ weight limit? Yes, it is ground level.1. Can you clarify any details regarding the rack specification desired? We have multiple options and wouldlike to align our specs with the expectations of the school.1. 3’’x3’’ 11 gauge tube with 1’’holes/hardware vs. 4’’x3’’-5’’x3.5’’ wrap 7 gauge with ?’’hardware Didnt know there was a difference. The 4 companies I talked to said everyone uses thesame2. Double storage post or single storage post preferred?3. Height of rack preferred (8’, 8.5’, 9’) Didnt know there was a difference. The 4 companies I talked tosaid everyone uses the same2Columbia County School DistrictWeight Room Equipment InstallBid Amendment 1, Request HC-03-31-26A4. Extended base or short base (will these units be bolted down and if so, do you want the installationteam to account for doing this?) These will not be bolted down2. Due to our many variations and options for product, are we able to submit multiple bid options to showcasethe variety of range and options for product? Yes, just make sure the item # the options reference are clearlylabeled.3. Is there a layout that this request is based on that can be provided to assist with quoting the appropriateracks and storage units? Room is 64x64 square will have 5 double racks down one side 5 double racksdown the other4. Is there an estimated date/timeline for the installs? As early in the summer as possible5. Specifications for type of Dumbbell requested? No. Have got some for hex or just round. Whichever iscost effective6. Are you looking for any attachments for the bridge rack connectors or just the holes for future options forattachments? Holes for future options7. Do you have a description of preferred color schemes and logos to be used on product? Logos for the firsttwo schools attached1. What products will the custom logos be applied to, and where on each product will the logo be placed?Logos on the racks, the benches and plates if possible2. Please provide the logo in vector file format. Logos attached. Not in a vector file. Will have to get those butlogos attached for colors3. What is the required delivery date for each school? As early in the summer as possible4. Additionally, can we revise the pricing document to include both the unit price and the extended price sothe total cost for all quantities is clearly shown? Yes that will work fineFor example, item #3 quantity 20 – landmine is for one school. Please provide the price for one set ofquantity 20 landmine. The description of quantity 20 landmine is for one school. Installation total istwo schools.Are both weight rooms on the first floor?YesIs there a single or double door for entry to the weight room (3' or 6')Double doorIs a layout of the rooms available, or dimensions of the rooms?Drawings includedIs existing equipment being removed or is this new construction?Rooms will be emptyVendors are to clearly state estimated delivery based on days after award3EDCBAAREA KAREA J2" EXP. JOINT W/ COVER PLATE; FILLGAP W/ 2-HOUR FIRE RATEDCOMPRESSED JOINT FILLER UL #20798M7N12M0N8M0N4'-8"7201.41'-4"9'-4"3'-4"A1_____________________________________________________________A-420 _____8M5N5'-2"2'-4"12'-2"37209A4M7N2'-4" 5'-4"B3 A-717 B19'-4"COACH7210472108M5NARCHITECTURAL JOINTSYSTEM COVER PLATEAT WALLS AND CEILING, TYP.A1_____________________A-39242" EXP. JOINT W/ COVER PLATE; FILLGAP W/ 2-HOUR FIRE RATEDCOMPRESSED JOINT FILLER UL #2079A3_____________________________________________________________A-504 _____52'-0"2" EXP. JT.W/ COVER PLATEAT 2 HR. FIRE WALL(S)12" ALUM.HEAVY DUTYTHRESHOLD EXP. JOINTCOVER AT FLOORiSF258M5N7200C1'-4"6VEST.63607200D10'-4"1SF 14W 1.1A2_____________________A-392AREA KA1_____________________________________________________________A-401 _____AREA J8M7NCORRIDOR72001'-4"1'-4"8M0N8M7N7'-4"7209B7208A12M0N7302AUP29'-4"12M1NSTAIR72087208BW 1.13_____________________A-3858M9N10'-0"AFF1'-4"1'-4"VISTOR MEN'S LOCKER1'-8"12'-0"3'-4"72098M7N4M7N15'-3"8M7N7'-3"10'-1"22.38M5N8M7N5'-4"HM28M5NJAN73017301CC172116M5NCOACH721122.38M5N9'-4"7'-3"8'-1"2'-4"8M7N8M7NHM28M7NWEIGHT ROOM7302WALL MOUNTEDSCOREBOARD7212A7'-8"VISTOR WOMEN'S LOCKER721217'-0"CORRIDOR73007212B12M0NSIMC5_____________________________________________________________A-502 _____2'-8"2'-0"SF68M5N2'-0"HOME BOYS LOCKER7213A5_____________________________________________________________A-419 _____72137'-8"2'-4"26.48M5N8M7N COACH72149'-4"A4_____________________A-38372148M5N7'-8"5'-4"8M5N7213.1AJAN. / STOR.22.17213.18M5N14'-8"2'-0"8M7N8M7N10'-0"8M7N22.38M5N8M0N22.18M0NA5_____________________A-383C1 A-707 D17302B7304A12M0NHM247215COACH72156M5N22.39'-4"6'-0"9'-5"4'-0 1/8"3A3 A-717 A12'-8"8M7NHM28M7N8M7N8M7N2'-0"72168M7NA6_____________________A-396411'-6 3/8"7'-8"HOME GIRLS LOCKER721612M0N5'-2"7201.212M5N12'-2"17'-4"2'-0"38M7NSF20 17217A8M5NSTAIR7217UP32'-0"2'-0"8M7N1 12M0NSF187304B4'-0"10'-4 3/8"A1_____________________________________________________________A-505 _____SF67217B12M5ND1_____________________A-302MULTIPURPOSE ROOM7304W 1.11'-7"42'-0"1'-4"1'-4"8M9N10'-0"AFFW 1.1SF55'-5"A4_____________________A-384SF51'-4"1'-4"8M9N8M9N2'-0"10'-0"AFF 10'-0"AFF31'-8"2_____________________A-385A3_____________________A-3962SF5A4_____________________________________________________________A-401 _____1_____________________A-385A1FLOOR PLAN- PARTIAL- LEVEL 1- AREA J1/8" = 1'-0"4749 505152 52.153545556123GEORGIA REGISTRATION INFORMATION: Neil A. Dawson [RA009731], James M. Hubbard [RA014155], John T. Hughes [RA013037], Laura L. McLeod [RA011330], Lisa K. Pinyan [ID000516], John P. Works [RA010038], Bryan D. Harder [RA012564], Dylan J. Towe [RA015218], Melissa A. Watness [RA012309], Prescott D. May, III [RA014912], Nathan C. Daniel [RA015598], April W. Mundy [RA013003], Brian Bresg [RA015706], Katherine A. Schuff [RA015681], LeRoy A. Selvidge, Jr. [RA015989]4H21.1H21H20H19H18PARTITION GRAPHICSGRAPHIC SAMPLE:8M2N2 HOUR RATED CMU FIRE BARRIER:SEE PARTITION TYPE SCHEDULE ON SHEET A-003 FORHEIGHT CONDITION, FIRE/SMOKE PROTECTION TYPE, ANDCOMPLETE PARTITION INFORMATIONHATCH PATTERN LEGENDCONCRETE MASONRY CONSTRUCTIONMETAL STUD PARTITIONEXISTING TO REMAINEvans HighSchoolFACILITY CODE: 636-4050GENERAL NOTESA. ALL INTERIOR WALLS SHALL EXTEND AND BE SEALED TO THE UNDERSIDE OF DECK ABOVE, U.N.O. REFER TO STRUCTURAL FORREQUIRED TOP OF WALL BRACING.B. EXTERIOR WALL DIMENSIONS ARE TO THE FACE OF CMU OR BRICK VENEER, U.N.O.C. INTERIOR WALL DIMENSIONS ARE TO FACE OF CMU OR METAL STUD, U.N.O.D. LOCATE ALL METAL STUD WALL DOOR OPENINGS 4" FROM NEAREST PERPENDICULAR WALL U.N.O.E. LOCATE ALL CMU WALL DOOR OPENINGS 8" FROM NEAREST PERPENDICULAR WALL U.N.O.F. AT INTERIOR MASONRY PARTITIONS, PROVIDE BULLNOSE MASONRY UNITS FOR OUTSIDE VERTICAL CORNERS AND HORIZONTALWINDOW STOOLS, EXCEPT AT FIRST COURSE AT FINISHED FLOOR, TOP COURSE AT CEILING, AND WHERE INDICATEDOTHERWISE.G. ALL GWB SHALL BE ABUSE-RESISTANT TO 8'-0" AFF (U.N.O). GWB ABOVE 8'-0" MAY BE REGULAR OR ABUSE-RESISTANT ATCONTRACTOR'S OPTION. REFER TO SECTION 09255 FOR COMPREHENSIVE MATERIAL SPECIFICATIONS.H. FIRE AND SOUND RATED WALLS/PARTITIONS TO BE CONSTRUCTED TIGHT TO STRUCTURE, PIPING, DUCTWORK AND OTHERPENETRATIONS. ALL WORK IS TO BE BRACED TO STRUCTURE ABOVE.I. PATCH CLEAN AND PAINT ALL EXISTING CMU WALLS.J. WHERE PARTITIONS OF DIFFERENT FIRE RATINGS INTERSECT, THE HIGHEST RATED PARTITION SHALL CONTINUE THROUGH.MAINTAIN PARTITION FIRE RATING BEHIND RECESSED FIRE EXTINGUISHER CABINETS.K. INSTALL BLOCKING IN METAL STUD PARTITIONS FOR CASEWORK, WALL MOUNTED EQUIPMENT, TRIM AND RELATEDCONSTRUCTION AS INDICATED IN THE SPECIFICATIONS.L. SEE SHEET A-001 FOR CONSTRUCTION SUBSYSTEMS.M. SEE A-200 SERIES ELEVATION DRAWINGS FOR LOCATION OF EXTERIOR MASONRY CONTROL JOINTS.N. SEE A-600 SERIES SHEETS FOR DOOR, LOUVER, AND WINDOW & GLAZING TYPES.O. SEE SHEETS A-700-SERIES SHEETS FOR INTERIOR FINISH SCHEDULES.P. SEE SHEETS A-SG-1 FOR SIGNAGE SCHEDULE, ELEVATIONS, AND DETAILS.Q. SEE CIVIL DRAWINGS FOR EXTERIOR SIDEWALKS, U.N.O.R. SEE STRUCTURAL DRAWINGS FOR EXTENTS OF SLAB DEPRESSIONS AND CUTOUTS, U.N.O.S. FURNITURE & EQUIPMENT (TABLES, CHAIRS & COMPUTERS) IS F.F.E. - O.F.O.I. (OWNER FURNISHED OWNER INSTALLED).T. RATED WALLS/ PARTITION PENETRATIONS AND TERMINAL JOINTS ARE TO BE INSTALLED AS SHOWN IN APPLICABLE UL JOINT ORPENETRATION DETAIL.U. FIELD VERIFY LOCATION OF INTERIOR WALL & CEILING CONTROL JOINTS REQUIRED IN THE SPECIFICATION WITH ARCHITECTPRIOR TO INSTALLATION.V. WALLS INCLUDING GYP.BD. AT THE PERIMETER OF ROOMS/ SPACES WITHOUT CEILINGS, i.e. EXPOSED STRUCTURE, SHALLEXTEND TO STRUCTURE ABOVE.321 WEST CONGRESS STREET SUITE 301SAVANNAH, GEORGIA 31401TEL. 912.695.2111WWW.LS3P.COMH16FLOOR PLAN NOTES BY NUMBERNUMBERNOTE1.1 REFER TO SHEET A-421 FOR TYPICAL CLASSROOM LAYOUT AND CONDITIONS.COPYRIGHT 2022 ALL RIGHTS RESERVED. PRINTED ORELECTRONIC DRAWINGS AND DOCUMENTATION MAYNOT BE REPRODUCED IN ANY FORM WITHOUT WRITTENPERMISSION FROM LS3P ASSOCIATES LTD.2.1 PATCH AND REPAIR EXISTING CMU WALL TO REMAIN AS REQUIRED FOR PARTITION DEMOLITION. REFERH14TO DEMO PLANS.2.2 CONTRACTOR TO COORDINATE EXISTING WELDING EQUIPMENT TO REMAIN WITH OWNER. COORDINATEINSTALLATION OF NEW EQUIPMENT WITH OWNER AS REQUIRED. COORDINATE MECHANICAL ANDELECTRICAL INFRASTRUCTURE REQUIREMENTS WITH OWNER.2.3 CONTRACTOR TO COORDINATE EXISTING AUTO COLLISION LAB EQUIPMENT TO REMAIN IN PLACE.COORDINATE INSTALLATION OF NEW EQUIPMENT WITH OWNER AS REQUIRED. COORDINATE MECHANICALAND ELECTRICAL INFRASTRUCTURE REQUIREMENTS WITH OWNER.2.4 EXISTING CONDITIONS TO REMAIN AND BE PROTECTED IN PLACE BY CONTRACTOR.2.5 EXISTING DEPRESSED SLAB TO BE FILLED TO FLUSH OUT WITH EXISTING ADJACENT SLAB TO REMAIN.REFER TO DEMOLITION PLANS.H133.1 CONTRACTOR TO INSTALL NEW CONCRETE PAD FOR NEW EQUIPMENT. REFER TO MECHANICAL ANDELECTRICAL DRAWINGS.4.1 INFILL EXISTING MASONRY WALL EXTENTS TO MATCH ADJACENT IN CONSTRUCTION MATERIALS ANDFINISH. ALIGN AND PATCH/REPAIR ADJACENT EXISTING WALLS TO REMAIN AS REQUIRED. PATCH ANDREPAIR EXISTING SLAB AND FLOOR FINISH TO REMAIN.4.2 EXTEND EXISTING MASONRY WALL TO DECK FOR 1 HOUR RATED WALL ASSEMBLY. REFER TO PARTITIONTYPE HEAD DETAILS FOR SEALANT REQUIREMENTS. PATCH AND REPAIR EXISTING CONDITIONS TOREMAIN AS REQUIRED.4.3 EXTEND EXISTING MASONRY WALL TO DECK FOR SMOKE RATED WALL ASSEMBLY. REFER TO PARTITIONTYPE HEAD DETAILS FOR SEALANT REQUIREMENTS. PATCH AND REPAIR EXISTING CONDITIONS TOH12REMAIN AS REQUIRED.4.4 INFILL EXISTING MASONRY WALL TO MATCH ADJACENT IN CONSTRUCTION MATERIALS AND FINISH.4.5 INFILL EXISTING STUD WALL EXTENTS AS INDICATED. ALIGN AND PATCH/REPAIR ADJACENT EXISTINGWALLS TO REMAIN AS REQUIRED. PATCH AND REPAIR EXISTING SLAB AND FLOOR FINISH TO REMAIN.5.1 NEW METAL ROOF LADDER, REFER TO SPEC FOR PRODUCT AND ANY ASSOCIATED ACCESSORIES.8.1 MECHANICAL LOUVER, REFER TO SPEC. SEE SECTION FOR VERTICAL LOCATION IN WALL. SEE MECH FORSIZING.H118.2 FIRE RATED WON DOOR, REFER TO SPECS.10.1 EXISTING LOCKERS TO REMAIN TO BE PROTECTED IN PLACE BY CONTRACTOR. WHERE DEMOLITIONEXTENTS IMPACT LOCKER LAYOUTS, CONTRACTOR TO REMOVE EXISTING LOCKERS, PROTECT ANDSTORE FOR PROJECT REINSTALLATION AS INDICATED ON PLANS. TURN UNUSED REMAINING LOCKERSOVER TO OWNER.10.2 NEW 2-TIER LOCKERS.10.3 PROVIDE LOCKER MANUFACTURER'S END CLOSURE PANEL TO COVER EXPOSED ENDS OF LOCKERS TOREMAIN, FINISH TO MATCH ADJACENT LOCKERS.10.4 COMBINATION OF NEW 2-TIER AND 3-TIERLOCKERS. REFER TO ELEVATION.11.1 WASHER/DRYER BY OWNER. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING.11.2 DISPLAY MONITORS. PROVIDE BLOCKING IN METAL STUD FRAMED WALLS. COORDINATE POWER ANDDATA WITH MONITOR MOUNTING HEIGHTS.11.3 DUMPSTER LOCATION. REFER TO CIVIL.H911.4 REFER TO FOOD SERVICE DRAWINGS FOR FOOD SERVICE EQUIPMENT LAYOUT AND COORDINATIONREQUIREMENTS.11.5 CONTRACTOR TO COORDINATE SPECIALITY EQUIPMENT FOR NEW SCIENCE LABS WITH LEONARDPETERSON.12.1 ACOUSTIC WALL TREATMENT, TYPICAL.12.2 CASEWORK, REFER TO FINISHES.∆ DATEDESCRIPTION12.3 ATHLETIC SAFETY WALL PAD TO WRAP COLUMN, REFER TO SPECS.1 07/18/2024 Conformance Set12.4 REMOVE EXISTING PAPER TOWEL DISPENSER AND RECEPTACLE. REPLACE WITH NEW PAPER TOWEL2 10/11/2024 ASI 1HOLDER AND RECEPTACLE. REFER TO SPEC.3 11/26/2024 ASI 212.5 REMOVE EXISTING STALL PARTITION AND REPLACE WITH NEW STALL PARTITION, SEE ENLARGED PLANS4 12/16/2024 ASI 3FOR DIMENSIONS. REFER TO SPEC.5 01/30/2025 ASI 412.6 REMOVE EXISTING MIRROR AND REPLACE WITH NEW MIRROR. REFER TO SPEC.6 03/19/2025 ASI 5H713.1 CONTRACTOR TO COORDINATE PAINT BOOTH SELECTION AND INSTALLATION FROM OWNER.COORDINATE MECHANICAL AND ELECTRICAL INFRASTRUCTURE REQUIREMENTS WITH OWNER.13.2 CONTRACTOR TO COORDINATE 20'X 40' AREA FOR FIRING SIMULATION SELECTION AND INSTALLATIONWITH OWNER. COORDINATE MECHANICAL AND ELECTRICAL INFRASTRUCTURE REQUIREMENTS WITHOWNER.13.3 REFER TO KITCHEN EQUIPMENT DRAWINGS FOR CULINARY LAB EQUIPMENT LAYOUT AND COORDINATIONREQUIREMENTS.14.1 FUTURE ADA LIFT BY OWNER. PROVIDE POWER AND REMOVABLE SECTION OF GUARDRAIL.22.1 INSTALL NEW ACCESSIBLE WATER COOLER. NEW WATER COOLER TO REPLACE SINGLE WATER COOLERSAT EXISTING CONDITIONS, REFER TO SHEET A-005 FOR ACCESSIBILITY REQUIREMENTS. REFER TOPLUMBING DRAWINGS AND SPECS.22.2 REFER TO SHEET A-005 FOR PLUMBING ACCESSIBILITY REQUIREMENTS. REFER TO PLUMBING DRAWINGS,TYPICAL.22.3 NEW FLOOR DRAIN, REFER TO PLUMBING DRAWINGS.KEY PLAN:22.4 PLUMBING CHASE, REFER TO PLUMBING DRAWINGS.H522.5 EXISTING SCUPPERS TO RECEIVE NEW LEADER HEAD AND DOWNSPOUTS. CONNECT TO UNDERGROUNDSTORMWATER, REFER TO CIVIL.H422.6 CATCH BASIN AND DOWNSPOUT - TIE TO STORM WATER SYSTEM.23.1 UNIT HEATER, REFER TO MECHANICAL.23.2 MECHANICAL SHAFT, REFER TO MECHANICAL FOR DUCT SIZING.23.3 CONDENSER, REFER TO MECHANICAL.23.4 CHILLER, REFER TO MECHANICAL.PN M LKACD EBF GH J26.1 ELECTRICAL PANELS, REFER TO ELECTRICAL.26.2 ELECTRICAL TRANSFORMER, REFER TO ELECTRICAL.26.3 ELECTRICAL DISCONNECT SWITCH, REFER TO ELECTRICAL.26.4 KEY SWITCHES, DOUBLE GANG.H232.1 INSTALL NEW BOLLARDS, GROUT SOLID, TYPICAL. REFER TO ARCHITECTURAL SHEET DETAIL D6/A- 521.32.2 PATCH CMU WALL AND CONCRETE SLAB, PREP FOR NEW FINISHES.SHEET NAME:FLOOR PLAN-LEVEL 1- AREA JORIGSUBMISSION:04/30/2024TRUE PROJECTNORTH NORTHSHEET:A-101J56GMP SET / GA DOE FINAL SET3A3-024A3-22C24C259' - 3 3/8"14' - 3"C26C2712' - 1 7/8"30' - 0"C28 C29C30C31C321' - 4 1/2"20' - 0"21' - 4 3/4"15' - 1"4112J1A3-2524112H1M122A3-263A3-204116BSTAIR #34116285 SF1M12SM8X4115A11A6-124A5-01 HOME GIRLSLOCKERSXM84117XM8562 SF22' - 9 5/16"XM81M1226' - 8 7/8"41176' - 0"SM8X2A3-032A3-22WOMEN4117.2212 SFXM4MEN4120.2212 SFXM4S4117.1106 SFXM8 XP4OFFICE4118111 SFXM8 XP4 XM8OFFICESM8X 4119111 SFS4120.1106 SF4118411916' - 2"CORR.4115783 SFSM8X7' - 0"1XP4F.E.C.4122A16' - 2"XP8XXM8XP8X23' - 5 5/8"HOME BOYSLOCKERS4120578 SF2A4-1441206' - 0"17' - 5 5/8"3SM8X SM12A3-244115B1A3-26 4121ASM12SM8XSM8XSM121' - 5 1/4"24A3-244122BI-24GYMNASIUM411218245 SFMULTIPURPOSE41213870 SFXM8XWEIGHTROOM41223932 SFI-2456' - 1 9/16"56' - 6 5/16"XM8X1M124112GSM8XSM8XSM1221' - 5 1/4"1M1226' - 8 7/8"6' - 0"STAIR #44124283 SF4124B1M12412522' - 9 1/4"4A5-01SIM.OPP.HND.VISITINGGIRLSLOCKERS4125561 SFSM8X16' - 2"F.E.C.CORR.4123783 SFXP47' - 0"1SM12SM8X16' - 2"41264127S4125.1108 SF3' - 6"8"CUST4126110 SFXM83' - 6"STR4127110 SFS4128.1106 SFWOMEN4125.2 XM8212 SFMEN4128.2212 SF6' - 0"17' - 5 5/8"412823' - 5 5/8"1A4-14VISITINGBOYSLOCKERS4128579 SF4123B4122C4112FCACBCCCFCGCH2CJCKCNCRCTCV3A2-061A3-02CWCZCAACABCADCAECAFCAHCAJCALCAMCANREVISIONS / PRINTEDREV.NO.DATEREMARKS05/16/23 GDOE PRELIMINARYSET06/01/23 PROGRESS SET08/15/23 PROGRESS SET10/02/23 GDOE CHECK SET11/01/23 ISSUED FORPERMIT-BID-GDOEFINAL1 11/17/23 ADDENDUM 12 12/06/23 ADDENDUM 24 04/22/24 ASI #1C27C29C30C31C3231' - 4 1/2"20' - 0"21' - 4 3/4"15' - 1"3A3-24W-3W-3W-3W-3W-3W-3W-3CK5' - 2 1/2" 4' - 8"7 5/8"5' - 4"4' - 8"5' - 4"4' - 8"5' - 4"4' - 8"5' - 4"4' - 8"5' - 4"4' - 8"5' - 4"4' - 8"24A3-24W-3W-3W-31' - 0"W-3W-3W-3CRCTCV3A2-06CWCZCAACAEPROJECT SUMMARYGRADESGDOE FACILITY CODEACERAGEEXISTING SFDEMOLISHED SFNEW ADDITION SFNEW TOTAL SFF.T.E CAPACITYINSTRUCTIONAL UNITS9TH - 12TH636-018954.33 AC178,984 SF-4,639 SF151,764 SF326,109 SF2100 FTE108 IU'S1 LEVEL 01 - AREA KA1-01K 1/8" = 1'-0"WALLS LEGENDTWO HOUR RATED FIRE WALLTWO HOUR RATED FIRE BARRIER4ONE HOUR RATED FIRE BARRIERSMOKE PARTITIONCMU PARTITIONEXISTING PARTITIONEFCDBGHJKLMANPROJECTNORTHIKEY PLANDATENOV 01 23JOB NO.222120.00SHEET NO.A1-01K
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Pre-Advertisement Notice for ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66062-NONST-2026-000000403
State Government of Georgia
Bid Due: 7/10/2026
Eastman City Park Playground ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-64555-NONST-2026-000000017
State Government of Georgia
Bid Due: 7/17/2026