Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project

Project Information

Bid Title
Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project
Issuing Agency
Pierce County
Location
Washington
Published Date
May 27, 2026
Closing Date
Jun 24, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description


Project ID:

Title: Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project

Addenda: 0

Release Date: 5/27/2026

Due Date: 6/24/2026

Follow
Design Consultant - Chambers Creek Dam Removal and Estuary Bank and Channel Protection Project
Request For Qualification
Planning and Public Works
Project ID: 2026-RFQ-149
Release Date: Wednesday, May 27, 2026
· Due Date: Wednesday, June 24, 2026 1:00pm
Posted Wednesday, May 27, 2026 9:00am
All dates & times in Pacific Time
Draft Response No Bid
Time Remaining: 27 days, 18 hours, 41 minutes


Post Information

Posted At:Wed, May 27, 2026 9:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

This RFQ seeks a design consultant to design the 30% to 100% design plans associated with the (1) Chambers Creek Dam removal (2) Chambers Bay estuary bank and channel protection measures to include riparian and marsh restoration post dam removal, and (3) Sediment management post dam removal to minimize the impacts of environmental pollution in the Chambers Creek system and to manage the quantity of sediment deposited in the marina and channel to Puget Sound.



Background

In 1933, the Chambers Creek Dam was built to assist in water withdrawal for Glacier Gravel Company and the Everett Pulp & Paper Company. The dam was constructed to create a water impoundment that would allow each of the companies to utilize the surface waters for their respective gravel mining and pulp/paper manufacturing operations. The Chambers Creek Dam is an earthen-filled dam. The dam’s spillway is concrete and slopes downward to the west. The sides of the dam are constructed of interlocking corrugated metal sheet pile. The dam has a crest length of 170 feet, a height of 22 feet, and a surface area of 5.0 acres. Fish ladders flank either side of the dam. In 2009, Pierce County conducted an inspection of the dam. The dam was found to have cracks in the concrete cap structure, the bottom was scoured, and sections in the lower sheet pile were missing or had holes. In 2012, a second fish ladder was added.

Removing Chambers Bay Dam is a priority action for salmon recovery in Water Resource Inventory Area (WRIA) 12. Removal of the dam and restoration of Chambers Creek will address several threats to salmon recovery: loss of off-channel habitat, disconnection of the floodplain, alteration of natural flow regimes, loss of riparian function, and degraded habitat complexity and connectivity. In addition, the dam impedes fish passage, and its removal will directly benefit species such as Chambers Creek chum salmon, coho salmon, pink salmon, steelhead, cutthroat trout, and bull trout, as well as juvenile rearing populations of Chinook salmon, from all over Puget Sound on a shoreline between the Puyallup and Nisqually River deltas. Removal of the dam and restoration of the estuary will restore tidal and estuarine processes and provide approximately a 40% increase in habitat, more diversity of habitat, and more prey for priority salmon species.

This project is an element of a larger effort to restore the Chambers Bay Estuary that involves the replacement of Chambers Creek Bridge. A separate RFQ led by Pierce County Office of the County Engineer has been produced to lead that stage of the project. Both projects will occur simultaneously to account for the impacts to tidal influence, differing hydrogeomorphology, and channel locations, which will evolve during the construction phases of the project.

The County is initiating engineering design for D817 Chambers Bay Estuary Restoration. To support this effort, Pierce County is seeking an engineering firm to provide Preliminary and Final Design Engineering services for the project. This is anticipated to be a federally funded project and must adhere to the WSDOT Local Agency Guidelines. In 2023, Pierce County completed a Type, Size and Location (TS&L) study for the bridge replacement project, and in 2026 Pierce County completed a Comprehensive Implementation Strategic Plan (CISP). Both documents can be found on the project webpage here: Chambers Bay Estuary Restoration | Pierce County, WA - Official Website .



Timeline

Release Project Date:
May 27, 2026
Question Submission Deadline:
June 18, 2026, 3:30pm
Proposal Submission Deadline:
June 24, 2026, 1:00pm
Proposal Evaluation:
Approximately three weeks after proposal submission deadline, proposals will be evaluated and interviews may be held if multiple proposers are deemed capable of meeting the requirements.
Estimated Notice of Intention to Negotiate a Contract:
Approximately six weeks after proposal submission deadline.
Estimated Date of Contract Execution :
Approximately eight weeks After proposal submission deadline.
Commodity Codes
  • NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Request for Qualifications (R...

06/19/2026 Request for Qualifications (RFQ): Tenant & Airport Improvement Project, #26-44-1899 RFQ Ad

Spokane International Airport

Bid Due: 7/28/2026

Consulting, Design, and Const...

Project: Consulting, Design, and Construction Observation Services For The Port Orchard Marina Guest

Sammamish Plateau Water

Bid Due: 7/28/2026