Operable Wall Replacement
Project Information
- Bid Title
- Operable Wall Replacement
- Issuing Agency
- Bridgeton city
- Location
- Missouri
- Published Date
- May 15, 2026
- Closing Date
- Jun 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Operable Wall Replacement
Category: Parks and Rec Status: Open Publication Date/Time: 5/15/2026 3:00 PM Closing Date/Time: 6/9/2026 10:00 AM Related Documents: - Attachment Preview
-
Bridgeton Rec Center.Specification - Section 10 22 26 (10650) Operable Partitions Acousti-Seal®PART 1 – GENERAL1.1 RELATED DOCUMENTSA. Drawings and general provisions of the Contract including General andSupplementary Conditions and Division 1 Specification Sections, apply to thisSection.1.2 SUMMARYA. This Section includes the following:1. Electrically operated, continuously hinged partitions.B. Related Sections include the following:1. Division 03 Sections for concrete tolerances required.2. Division 05 Sections for primary structural support, including pre-punching ofsupport members by structural steel supplier per operable partition supplier'stemplate.3. Division 06 Sections for wood framing & supports, and all blocking at headand jambs as required.4. Division 09 Sections for wall and ceiling framing at head and jambs.1.3 QUALITY ASSURANCEA. Installer Qualifications: An experienced installer who is certified in writing by theoperable partition manufacturer, as qualified to install the manufacturer's partitionsystems for work similar in material, design, and extent to that indicated for thisProject.B. Acoustical Performance: Test operable partitions in an independent acousticallaboratory in accordance with ASTM E90 test procedure and classified in accordancewith ASTM E413 to attain no less than the STC rating specified. Provide a completeand unedited written test report by the testing laboratory upon request.C. Preparation of the opening shall conform to the criteria set forth per ASTM E557Standard Practice for Architectural Application and Installation of Operable Partitions.D. The operable wall must be manufactured by a certified ISO-9001-2015 company oran equivalent quality control system.E. Indoor Air Quality: Operable partition, movable wall manufacturer’s non-woodproducts must meet the SCS Indoor Advantage™ Gold Certification or equivalent.This approval guarantees conformance to indoor air concentrations meeting IndoorAdvantage Gold Indoor Air Quality Certified to SCS-105 v4.2-2023 Conforms toANSI/BIFMA M7.1 and X7.1 and the CDPH/EHLB Standard Method (CA 01350)v1.2-2017 conducted in an independent third-party air quality testing laboratory.1.4 REFERENCE STANDARDSA. ASTM International1. ASTM E557 Standard Practice for Architectural Application and Installation ofOperable Partitions.2. ASTM E90 - Standard Test Method for Laboratory Measurement of AirborneSound Transmission Loss of Building Partitions and Elements.3. ASTM C1036 - Standard Specification for Flat Glass.4. ASTM C1048 - Heat-Treated Flat Glass—Kind HS, Kind FT Coated andUncoated Glass.5. ASTM E84 - Surface Burning Characteristics of Building Materials.6. ASTM E413 - Classification for Rating Sound InsulationB. Health Product Declaration Collaborative1. Health Product Declaration Open Standard v2.1C. International Standards OrganizationBridgeton Rec Center.1. ISO 14021 - Environmental Labels and Declarations - Self-DeclaredEnvironmental Claims (Type II Environmental Labeling).2. ISO 14025:2011-10, Environmental Labels and Declarations - Type IIIEnvironmental Declarations - Principles and Procedures.3. ISO 14040:2009-11, Environmental Management - Life Cycle Assessment -Principles and Framework.4. ISO 14044:2006-10, Environmental Management - Life Cycle Assessment -Requirements and Guidelines.5. ISO 21930 – Sustainability in Buildings and Civil Engineering Works — CoreRules for Environmental Product Declarations of Construction Products andServices.D. Other Standards1. ADA – Americans with Disabilities Act.2. UL 508A – Standard for Industrial Control Panels3. NFPA 70 – National Electrical Code4. ANSI Z97.1 - Safety Glazing Materials Used in Buildings.5. CPSC 16 CFR 1201 - Safety Standard for Architectural Glazing Materials.6. NEMA LD3 - High Pressure Decorative Laminates.1.5 SUBMITTALSA. Product Data: Material descriptions, construction details, finishes, installation details,and operating instructions for each type of operable partition, component, andaccessory specified.B. Shop Drawings: Show location and extent of operable partitions. Include plans,elevations, sections, details, attachments to other construction, and accessories.Indicate dimensions, weights, conditions at openings, and at storage areas, andrequired installation, storage, and operating clearances. Indicate location andinstallation requirements for hardware and track, including floor tolerances requiredand direction of travel. Indicate blocking to be provided by others.C. Setting Drawings: Show imbedded items and cutouts required in other work,including support beam punching template.D. Samples: Color samples demonstrating full range of finishes available by architect.Verification samples will be available in same thickness and material indicated for thework.E. Reports: Provide a complete and unedited written sound test report indicating testspecimen matches product as submitted.F. Create spaces that are healthy for occupants.1. Furnish products and materials with Health Product Declaration (HPD),Manufacturer Inventory, or other material health disclosure documentation.Products without an HPD or other disclosure documentation are notacceptable.G. Furnish materials that generate the least amount of pollution.1. Furnish products and materials that have third party verified environmentalproduct declarations (EPD’s). Consider products and materials that haveoptimized environmental performance (reduced life cycle impacts). Productswithout an EPD or other disclosure documentation are not acceptable.H. Buy American: Folding door to be manufactured in the United States in compliancewith applicable U.S. Federal Trade Commission (FTC) and U.S. Customs Serviceand Border Protections regulations and be labeled "Made in America".1.6 DELIVERY, STORAGE, AND HANDLINGA. Clearly mark packages and panels with numbering systems used on Shop Drawings.Do not use permanent markings on panels.B. Protect panels during delivery, storage, and handling to comply with manufacturer’sdirection and as required to prevent damage.Bridgeton Rec Center.1.7 WARRANTYA. Provide written warranty by manufacturer of operable partitions agreeing to repair orreplace any components with manufacturing defects.B. OP-01: Warranty period: Five (5) years.OP-02: Warranty period: Five (5) years.PART 2 – PRODUCTS2.1 MANUFACTURERS, PRODUCTS, AND OPERATIONA. Manufacturers: Subject to compliance with requirements, provide product by thefollowing:1. Modernfold, Inc.B. Doors to be manufactured in the U.S.A.C. Products: Subject to compliance with the requirements, provide the following product:1. OP-01: Acousti-Seal Premier – Electric Partition (933E) electrically operatedcontinuously hinged operable partition.OP-02: Acousti-Seal Premier – Electric Partition (933E) electrically operated continuouslyhinged operable partition.2.2 OPERATIONA. OP-01: Acousti-Seal Premier – Electric Partition (933E): Series of continuouslyhinged flat panels, electrically operated, top supported with operable floor seals.B. OP-02: Acousti-Seal Premier – Electric Partition (933E): Series of continuouslyhinged flat panels, electrically operated, top supported with operable floor seals.C. Final Closure:1. OP-01: Side Jamb with overlapping trail panel.2. OP-02: Side Jamb with overlapping trail panel.D. Partition shall be operated by:1. OP-01: Two push button control stations wired in series and located onopposite sides and opposite ends of the partition. Control stations shall beactivated by key switch at stack end of partition.2. OP-02: Two push button control stations wired in series and located onopposite sides and opposite ends of the partition. Control stations shall beactivated by key switch at stack end of partition.3. Motor unit shall be reversible, continuous duty, and class A insulated. Motorunit shall have NEMA MG 1 service factor, high starting torque, thermaloverload protection, and open/drip proof enclosure. Motor assembly shallhave wiring compliant with NFPA 70, 24-volt controls, compliant with UL508A, and speed of 28 feet/minute. The drive unit motor shall be equippedwith outboard limit switches to prevent over-extension. A positive chain driveattached to the lead panel shall pull the partition across the opening. Cable,belt, or other friction type drives will not be accepted.E. Electric motor shall be:1. OP-01: A 208-volt, 3-phase2. OP-02: A 208-volt, 3-phase2.3 PANEL CONSTRUCTIONA. OP-01: Nominal 3-inch (76mm) thick panels in manufacturer's standard 48-inch(1220mm) widths. All panel horizontal and vertical framing members fabricated fromminimum 18-gage formed steel with overlapped and welded corners for rigidity. Topchannel is reinforced to support suspension system components. Frame is designedso that full vertical edges of panels are of formed steel and provide concealedprotection of the edges of the panel skin.B. Panel skin shall be:Bridgeton Rec Center.C. OP-02: Nominal 3-inch (76mm) thick panels in manufacturer's standard 48-inch(1220mm) widths. All panel horizontal and vertical framing members fabricated fromminimum 18-gage formed steel with overlapped and welded corners for rigidity. Topchannel is reinforced to support suspension system components. Frame is designedso that full vertical edges of panels are of formed steel and provide concealedprotection of the edges of the panel skin.D. Panel skin shall be:1. OP-01: 1/2-inch (13 mm) NAUF medium density fiberboard, single material orcomposite layers continuously bonded to panel frame. Acoustical ratings ofpanels with this construction: Acoustical ratings of panels with thisconstruction minimum:a. 50 STC2. OP-02: 1/2-inch (13 mm) NAUF medium density fiberboard, single material orcomposite layers continuously bonded to panel frame. Acoustical ratings ofpanels with this construction: Acoustical ratings of panels with thisconstruction minimum:a. 50 STCE. Hinges for Panels, Closure Panels, Pass Doors, and Pocket Doors shall be:1. OP-01: Full leaf butt hinges, attached directly to the panel frame with weldedhinge anchor plates within panel to further support hinge mounting to frame.Lifetime warranty on hinges. Hinges mounted into panel edge or verticalastragal are not acceptable.2. OP-02: Full leaf butt hinges, attached directly to the panel frame with weldedhinge anchor plates within panel to further support hinge mounting to frame.Lifetime warranty on hinges. Hinges mounted into panel edge or verticalastragal are not acceptable.F. Panel Trim: No vertical trim required or allowed on edges of panels; minimal grooveappearance at panel joints.G. Panel Weights:1. OP-01: 50 STC - 8 lbs./square foot2. OP-02: 50 STC - 8 lbs./square foot2.4 PANEL FINISHA. Panel finish shall be:1. OP-01: Reinforced vinyl with woven backing weighing not less than 20ounces (567 grams) per lineal yard.2. OP-02: Reinforced vinyl with woven backing weighing not less than 20ounces (567 grams) per lineal yard.B. Panel Trim: Exposed panel trim of one consistent color:1. OP-01: To Be AdvisedOP-02: To Be Advised2.5 SOUND SEALSA. Vertical Interlocking Sound Seals between panels: Roll-formed steel astragals, withreversible tongue and groove configuration in each panel edge for universal paneloperation. Rigid plastic or aluminum astragals or astragals in only one panel edgeare not acceptable.B. Horizontal Top Seals: Continuous contact extruded vinyl bulb shape with pairs ofnon-contacting vinyl fingers to prevent distortion without the need for mechanicallyoperated parts.C. Horizontal bottom floor seals shall be:1. OP-01: A2 - Automatic operable seals providing nominal 2-inch (51 mm)operating clearance with an operating range of +1/2-inch (13 mm) to –1-1/2inch (38 mm) which automatically drop as panels are positioned, without theneed for tools or cranks.Bridgeton Rec Center.2. OP-02: A2 - Automatic operable seals providing nominal 2-inch (51 mm)operating clearance with an operating range of +1/2-inch (13 mm) to –1-1/2inch (38 mm) which automatically drop as panels are positioned, without theneed for tools or cranks.2.6 SUSPENSION SYSTEMA. OP-01: #14 Suspension System1. Suspension Tracks: Minimum 7-gage, 0.18-inch (5 mm) roll-formed steel.Track shall be supported by adjustable steel hanger brackets connected tostructural support by pairs of 1/2-inch (13 mm) diameter threaded rods.Brackets must support the load bearing surface of the track.a. Exposed track soffit: Steel, removable for service and maintenance,attached to track bracket without exposed fasteners, and pre-paintedoff-white.2. Carriers: All-steel trolleys with steel-tired ball bearing wheels.3. Warranty period: Ten (10) years.B. OP-02: #14 Suspension System1. Suspension Tracks: Minimum 7-gage, 0.18-inch (5 mm) roll-formed steel.Track shall be supported by adjustable steel hanger brackets connected tostructural support by pairs of 1/2-inch (13 mm) diameter threaded rods.Brackets must support the load bearing surface of the track.a. Exposed track soffit: Steel, removable for service and maintenance,attached to track bracket without exposed fasteners, and pre-paintedoff-white.2. Carriers: All-steel trolleys with steel-tired ball bearing wheels.3. Warranty period: Ten (10) years.2.7 OPTIONSA. Pass Doors:B. Single Pass Doors:1. OP-01: Matching pass door same thickness and appearance as the panels.ADA compliant pass door equipped with friction latch and flush pulls for panicoperation. No threshold will be permitted.C. Pass Doors:1. OP-02: Matching pass door same thickness and appearance as the panels.ADA compliant pass door equipped with friction latch and flush pulls for panicoperation. No threshold will be permitted.D. Available accessories/options:1. OP-01: Pocket Doors: Acousti-Seal Pocket Doors by Modernfold, Inc.Equipped with electric interlock system. (see supplement specification)a. Premier pocket door2. OP-02: Pocket Doors: Acousti-Seal Pocket Doors by Modernfold, Inc.Equipped with electric interlock system. (see supplement specification)a. Premier pocket doorPART 3 – EXECUTION3.1 INSTALLATIONA. General: Comply with ASTM E557, operable partition manufacturer's writteninstallation instructions, Drawings and approved Shop Drawings.B. Install operable partitions and accessories after other finishing operations, includingpainting have been completed.C. Match operable partitions by installing panels from marked packages in numberedsequence indicated on Shop Drawings.D. Broken, cracked, chipped, deformed or unmatched panels are not acceptable.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238350Finish Carpentry Contractors
- NAICS 238390Other Building Finishing Contractors
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
REQUEST FOR PROPOSAL (RFP) DO...
REQUEST FOR PROPOSAL (RFP) DOR 0000000050SL: Princeton License Office Close Date 07/09/2026 2:00
State Government of Missouri
Bid Due: 7/09/2026
Excess Information Technology...
Bid Title: Excess Information Technology Equipment Category: Information Technology Status: Open Description: The
Warrensburg city
Bid Due: 7/27/2026