Camanche Dam Outlet Works and Pardee Dam Diving & Remote Operated-Vehicle (ROV) Inspections WRD-2026-01
Project Information
- Bid Title
- Camanche Dam Outlet Works and Pardee Dam Diving & Remote Operated-Vehicle (ROV) Inspections WRD-2026-01
- Issuing Agency
- East Bay Municipal Utility District
- Location
- California
- Published Date
- Feb 25, 2026
- Closing Date
- Mar 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
The East Bay Municipal Utility District (the District) is soliciting proposals for Camanche Dam Outlet Works and Pardee Dam Diving & Remote Operated-Vehicle (ROV) Inspections WRD-2026-01.
Please respond to this RFP no later than 4:00 PM on Wednesday, March 19, 2026. Completed proposal should be sent to:
QuestionsE-mail: Sabrina Cheng, Admin Secretary II
sabrina.cheng@ebmud.com
Subject: RFP Camanche Dam Outlet Works and Pardee Dam Diving & Remote Operated-Vehicle (ROV) Inspections
*Hardcopy proposals will not be accepted
If you have questions regarding this RFP, please send an e-mail to Joe Tam, Associate Civil Engineer, joe.tam@email.com. To ensure a response, questions must be received no later than 12:00 PM on Monday March 9, 2026.
WRD-901-26-01 RFP for Camanche-Pardee ROV InspectionsDocument Type Size WRD-901-26-01 RFP For Camanche Pardee ROV Inspections PDF 1.4 MB - Attachment Preview
-
EAST BAYMUNICIPAL UTILITY DISTRICTREQUEST FOR PROPOSAL (RFP)for Camanche Dam Outlet Worksand Pardee Dam Diving & RemoteOperated-Vehicle (ROV)Inspections WRD-2026-01ADDENDAProspective bidders are responsible for reviewing anypublished addenda regarding this bid atebmud.com/business-centerCONTACTJoe Tam, Associate Civil Engineer(510) 287-1389joe.tam@ebmud.comRESPONSE DUEMarch 19, 20264:00 p.m. PSTSUBMIT ELECTRONICALLY TO*Sabrina Cheng, EBMUDsabrina.cheng@ebmud.com*Hardcopy proposals will not be acceptedEBMUD is committed to reducing environmental impacts across ourentire supply chain. If printing this document, please print only whatyou need, print double‐sided, and use recycled‐content paper375 ELEVENTH STREET . OAKLAND . CA 94607-4240 . WWW.EBMUD.COM! BUSINESS-CENTER/EAST BAY MUNICIPAL UTILITY DISTRICTRFP for Camanche Dam Outlet Works and Pardee Dam Diving and ROV InspectionsWRD-2026-01TABLE OF CONTENTSI. STATEMENT OF WORK...............................................................................................2A. SCOPE................................................................................................................ 2B. PROPOSER QUALIFICATIONS .............................................................................. 2C. SPECIFIC REQUIREMENTS................................................................................... 2D. DELIVERABLES.................................................................................................... 9II. CALENDAR OF EVENTS............................................................................................10A. MANDATORY PROPOSAL CONFERENCE .............................................................10B. OPTIONAL SITE WALK.........................................................................................11III. DISTRICT PROCEDURES, TERMS, AND CONDITIONS................................................12A. RFP ACCEPTANCE AND AWARD .........................................................................12B. EVALUATION CRITERIA/SELECTION COMMITTEE.................................................12C. PRICING ...........................................................................................................15D. NOTICE OF INTENT TO AWARD AND PROTESTS ...................................................16E. WARRANTY ........................................................................................................18F. INVOICING ........................................................................................................18IV. RFP RESPONSE SUBMITTAL INSTRUCTIONS AND INFORMATION..............................18A. DISTRICT CONTACTS .........................................................................................18B. SUBMITTAL OF RFP RESPONSE...........................................................................19C. RESPONSE FORMAT...........................................................................................20ATTACHMENTSEXHIBIT A – RFP RESPONSE PACKETEXHIBIT B – INSURANCE REQUIREMENTSEXHIBIT C – GENERAL REQUIREMENTSEXHIBIT D – IRAN CONTRACTING ACT CERTIFICATIONEXHIBIT E – BOND FORMSEXHIBIT F – INFORMATION TECHNOLOGY SECURITY INFORMATION TO BE EXCLUDEDFROM PUBLIC RECORDS ACT REQUESTSEXHIBIT G – DATA CONFIDENTIALITY AGREEMENTEXHIBIT H – INVASIVE SPECIES CONTROL PROCEDURES FOR DIVE GEAR EQUIPMENT,ROVS, VESSELS, AND OTHER AQUATIC DEVICESEXHIBIT I – UNDERWATER OPERATIONS PERMIT (SAMPLE)EXHIBIT J – DECLARATION OF NONCOLLUSIONREV 3/26/25RFP No. WRD-2026-01Page 1RFP for Camanche Dam Outlet Works and Pardee Dam Diving and ROV InspectionsWRD-2026-01IV. STATEMENT OF WORKA. SCOPEThese specifications, terms, and conditions establish the requirements for underwaterdiving and remote-operated-vehicle (ROV) inspection services to inspect theCamanche Dam Low-Level Outlet Conduits, Camanche Dam High-Level OutletConduit, upstream face of Pardee Dam, and Pardee Dam Penstock & SluicewayGatewells. The inspection services will observe general structural integrity andphysical condition with special attention to weak areas such as at connections, cracks,corrosion, defects, and signs of stress or degradation. The Proposers will furnishmedia files of the inspections. The details of tasks are described in the SPECIFICREQUIREMENTS section below.East Bay Municipal Utility District (District) intends to award a 1-year contract to theProposer(s) who best meets the District’s requirements.B. PROPOSER QUALIFICATIONS1. Proposer Minimum Qualificationsa. Proposer, Proposer’s principal, or Proposer’s staff shall have beenregularly engaged in the business of providing diving and underwaterremote-operated-vehicle inspection services for at least five (5) years.b. Proposed divers shall be ANSI/ACDE 01-2015 [or recognized equivalent]certified as a commercial diver.c. Proposed ROV operators shall have all necessary training to safelyoperate underwater ROVs.d. Proposer shall be able to certify that all underwater equipment is free ofharmful biological matter, specifically free of invasive species (such aszebra mussels, golden mussels, and/or quagga mussels) prior toconducting field work per Exhibit H.e. Proposer shall possess all permits, licenses, and professionalcredentials necessary to perform services as specified under this RFP.C. SPECIFIC REQUIREMENTSThe documents and reports developed by the District for the Project may containCritical Energy Infrastructure Information (CEII). These documents are only availabledigitally for Proposers to review, upon request, to support development of a responseREV 3/26/25RFP No. WRD-2026-01Page 2RFP for Camanche Dam Outlet Works and Pardee Dam Diving and ROV InspectionsWRD-2026-01to the RFP. For access, proposers will need to submit a signed nondisclosureagreement contained in Exhibit G – Data Confidentiality Agreement.1. Underwater Inspection Sites: The following are details of the four sites that theContractor will inspect with underwater ROV equipment. Refer to C.2 below forminimum ROV requirements. The Camanche reservoir level can vary betweenelevation 200 feet and elevation 235 feet (local datum)/ 202.2 and 237.2 feet(NAVD88) and is anticipated to be between elevation 230 feet and elevation 215 feet(local datum)/ 232.2 and 217.2 feet (NAVD88) at the time of inspection. The Pardeereservoir level is controlled by a spillway with a crest elevation at elevation 567.65feet (local datum)/ 569.65 feet (NAVD88 datum) and the bottom of the reservoir, atthe lowest point at the upstream toe of the dam, is elevation 225 feet (local datum)/227 feet (NAVD88). The Pardee reservoir level is anticipated to be betweenelevation 564 feet and elevation 539 feet (local datum)/ 566 feet and elevation 541feet (NAVD88) at the time of inspection. The anticipated elevations of the Pardeeand Camanche reservoir levels are not guaranteed and are subject to change.i. Camanche Low-Level Outlet (North Conduit) and (South Conduit): TheCamanche Low-Level Outlet is a twin-conduit system founded on rock at thebase of the Camanche embankment dam. These concrete conduits are roughlycircular with minor horseshoe-shape characteristics with a nominal insidediameter of 13 feet and slope of 0.010. The conduits are connected to aconcrete intake structure, located at the upstream toe of the dam, with metaltrash racks that are 21 feet wide by 33.5 feet tall and are inclined at a 1H:4V(Horizontal : Vertical).Each of the two conduit trash racks has a metal-bar access door that is 3 feetwide by 5 feet-4.25 inches tall. The as-built drawings note that access doorhas a positive latch-type fastener on top and bottom and two loose-pin hingeson the side. This access door has not been opened since it was installed in1964 and therefore the effort required to remove the trash rack access doorsis an unknown risk. Additionally, as the trash rack doors are located at thebase of the reservoir/intake structure, there may be significant debris thatneeds to be removed before the access door can be opened. The Proposershould consider these risk factors and assess feasible options/methodsavailable to gain access to the conduits and include in their price/proposal.The invert of the conduits is at elevation 98.63 feet (local datum)/ 100.83 feet(NAVD88) at Station 0+72.2 near the trash racks. The conduits continue to thebutterfly valve chamber at Station 3+99. Therefore, the required inspectionlength is approximately 328 feet for each of the two conduits.REV 3/26/25The District will close the butterfly valves at the valve chamber for theinspection and there is expected to be no flow to minimal leakage flow at theRFP No. WRD-2026-01Page 3RFP for Camanche Dam Outlet Works and Pardee Dam Diving and ROV InspectionsWRD-2026-01butterfly valves. Proposer should consider the risk for leakage flow at thebutterfly valves on the ROV mobility.The contractor will collect videographic records of the condition of both theNorth and South Conduit surfaces (complete visual of 360 degrees) along theentire length listed herein. The inspection must have coordinate controloverlain on the final video and photographic products per C.2.iii and -iv ofSpecific Requirements. Upon completion of the ROV inspection, thecontractor will reattach or close the trash rack access door.ii. Camanche High-Level Outlet: The Camanche High-Level Outlet is a singleconcrete conduit founded on rock at the northern end of Camancheembankment dam. The conduit is circular and has an inside diameter of 4 feet.The High-Level outlet is connected to an intake structure, located at theupstream toe of the dam, with a 66-inch x 66-inch slide gate and 10 foot – 10inches wide by 14 foot tall trash racks (built out of 3 modules, each 4 foot – 7inches tall x 10 foot – 10 inches wide). The top of the trash rack is at elevation213 feet (local datum)/ 215.2 feet (NAVD88) and the invert of the conduit intakeis at elevation 199 feet (local datum)/ 201.2 feet (NAVD88). There is also a 15-inch wide access point at the stoplog slot; however, this is likely to be toosmall to insert a ROV. Therefore, it is likely that the contractor will have toremove the trash rack to provide access for an ROV.Once the contractor has established access for the ROV, the conduit runsfrom Station 5+00 to Station 11+23, or 623 feet of inspectable length. Theconduit features a bend at Station 9+27. The conduit slope is 0.067 for the first427 feet, followed by a slope of 0.4 for 196. The downstream slide gate will beclosed during the inspection and there is expected to be no flow to minimalleakage flow. Proposer should consider the risk for leakage-level flows.REV 3/26/25The contractor will collect videographic records of the condition of theconduit surfaces (complete visual of 360 degrees) along the entire length listedherein. The inspection must have coordinate control overlain on the finalvideo and photographic products per C.2.iii and -iv of Specific Requirements.Upon completion of the ROV inspection, the contractor will replace the trashracks (if removed).iii. Pardee Dam Underwater Upstream Face: Pardee Dam is a large gently curvedconcrete gravity dam located over a triangular valley with 35-degree sideslopes. The upstream face is nearly vertical with a gentle batter of 3 horizontalto 100 vertical. The contractor will be tasked to collect video/photographicrecord of the entire upstream underwater face of the dam for evidence ofconcrete defects, damage, degradation, stress, or other signs of distress. TheROV may be deployed from the gate house located at the middle of PardeeRFP No. WRD-2026-01Page 4
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 541330Engineering Services
- NAICS 561990All Other Support Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Notice of Intent to Award a S...
Follow Notice of Intent to Award a Sole Source Contract -Shipboard Decontamination Station
DEPT OF DEFENSE
Bid Due: 7/15/2026
Description Fire Hydrants and...
Bid Solicitation # UD-26-342 Bid Solicitation # UD-26-342 Organization Name Long Beach Utilities
City of Long Beach
Bid Due: 7/23/2026