Concrete Bid#26-96-10
Project Information
- Bid Title
- Concrete Bid#26-96-10
- Issuing Agency
- City of Ada
- Location
- Oklahoma
- Published Date
- Nov 7, 2025
- Closing Date
- Dec 5, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid/RFP Title Open Until Concrete Bid#26-96-10 12/5/2025 - Attachment Preview
-
CITY OF ADA, PURCHASING512 North Stockton StreetAda, Oklahoma 74820580/436-6300 x256 Fax 580/436-8044BID PROPOSALNovember 5, 2025Bid Proposal:Bid Due:Bid Opening:Mailing Address:Published:26-96-10 Service: READY MIX CONCRETEDecember 4th, 2025 @ 9:00 a.m. CST at City of Ada Purchasing Dept, 512 N. Stockton St.,Ada, OK 74820December 4th, 2025 @ 9:30a.m. CST at City of Ada Irving Community Center, 530 West 5th St.,Ada, OK.City of Ada – Purchasing, 512 N. Stockton, Ada, OK 74820Ada Evening News, November 8 & 13, 2025NOTICE IS HEREBY GIVEN THAT:The City of Ada, Oklahoma and its agencies/authorities herein called (BUYER) will receive SEALED BIDS as listed above atwhich time said bids will be opened and read aloud.GENERAL CONDITIONS01. Bidders must complete and submit bid on the provided bid documents. Duplication of bid documents is authorized.02. Bids must be submitted in a sealed envelope clearly marked "SEALED BID" and bear the bid number, item, andbidder's name. Bids improperly marked, submitted, and/or received after the bid opening may be rejected unlesslateness is due to other than the bidder's fault -- such as mail or delivery errors. FAX bids are not acceptable.03. The BUYER is an Equal Opportunity Employer and purchases only from those that comply with applicable EqualOpportunity Provisions. Non-compliance will result in rejection of bids and/or breach of contract.04. The bid amount must be FOB -- Ada, OK and exclude all taxes.05. Unless so stated, bids will be evaluated by Life Cycle Cost and will be awarded on a "Best Buy" basis as determined bythe BUYER.06. Offer Period – 30 days after the bid opening unless so stated. Formal acceptance will be by receipt of a valid purchaseorder issued by the BUYER within the offer period.07. PAYMENT -- Full payment will be made approximately 3 weeks AFTER receipt and acceptance of the goods/servicesand required documents.08. The BUYER reserves the right to negotiate changes/alterations/quantities to the base bid with the low bidder.09. The BUYER reserves the right to waive any informality in the bidding process and/or reject all bids.10. Mistakes, Errors, Bid Withdrawal, or Adjustments.A. Prior to bid opening, bidders may withdraw or alter their bids or submit adjustments or attachments provided thetotal bid amount is not revealed and it does not provide an unfair advantage to the bidder.B. After bid opening, only corrections of obvious errors will be accepted.11. Bond Requirements: None12. Insurance Requirements: Within 10 work days of awarding of this contract, theSuccessful bidder must:A. Provide evidence of Workman’s Compensation Insurance per Oklahoma statues.B. Provide evidence of Vehicle Liability Insurance per Oklahoma statues.C. Provide evidence of $1,000,000 liability insurance naming the City of Ada as co-insured.13. Bid Documents: Bid Notice, Bid Proposal Form, and Detailed Specifications.Pamela McKinzie, Purchasing DirectorBid#26-96-10Page 1 of 10BID PROPOSAL: READY-MIXED CONCRETEBid #26-96-10Submitted by: ______________________________________________________________________Submitted to:Bid Opening:CITY OF ADA, OKLAHOMA, Purchasing Department, 512 North Stockton, Ada, OK 74820Before 9:00 a.m. CST, December 4th, 2025December 4th, 2025 @ 9:30 a.m. CST, at City of Ada Irving Community Center, 530 West5th St., Ada, OKThis is a formal bid proposal submitted by the bidder to the City of Ada, Oklahoma and its agencies/authoritiesherein called (BUYER), as a legal offer. When properly accepted by an authorized agent of the BUYER, it shallconstitute a firm and binding contract between these two parties in accordance to the conditions and specificationsstated and/or implied within the bid documents.PURPOSE:This bid is intended to provide FIXED prices for various mixes of Ready Mixed Concrete for a six-month period,commencing upon January 1, 2026, and ending on June 30, 2026, or at which time the next 6 month contract isawarded and approved by council.Mix design and Prices are listed on the attached form. This form must be completed. The mix portion of thisform will be confidential and used by BUYER personnel for official purposes only the price portion will bepublic record.SPECIFICATIONS:1. Contract Period: Six-month period, commencing upon January 1, 2026 and ending on June 30, 2026, orat which time the next 6 month contract is awarded and approved by council.2. Concrete will be ordered by quantity, class, slump, additives (if any) and required delivery time. Thesupplier must advise the buyer if delivery can not be provided as requested.3. Concrete will be ordered in quantities of 3 cubic yard or greater for delivery between 7 a.m. and 5 p.m.Monday through Friday, except for emergencies or prior arrangements.4. WHEN POSSIBLE, concrete will be ordered a minimum of 2 days prior to required delivery.5. Late deliveries and/or incorrect orders (class, slump, quantity, etc.) are just cause to cancel or reject ordersand/or remove the supplier from the bidder’s list for future services.6. Concrete will be purchased from the supplier that offers the best products/services at best price. Includeany fees in the concrete price given on the price form (Does not include Below (3) yd³ Minimum OrderFee). Concrete mix designs shall be proportioned to insure acceptable workability and meet strength,durability, and uniformity requirements of ODOT specifications or standard practices.7. Concrete not meeting the specifications will be subject to legal recourse and removal from the bidder’s list.8. The buyer reserves the right to purchase concrete from other suppliers when considered in the best interestof the buyer if delivery can not be provided as requested; in the event the primary supplier(s) can notprovide the required product or service.9. Complete the attached form. The mix design portions will be held in confidence. The dollar amounts willbe public record.Bid#26-96-10Page 2 of 10PORTLAND CEMENT CONCRETEThese specifications cover materials, classifications, mix designs, proportioning, and testing of Portland cementconcrete. All concrete shall be air entrained unless otherwise shown on the plans.The 2009 Edition of the Oklahoma Department of Transportation Standard Specifications for Highway Constructiongovern, approved by the U.S. Department of Transportation, Federal Highway Administration, January 4, 2010. Allreferences to the Oklahoma Department of Transportation Commission pertaining to the 2009 Specifications andStandards shall be interpreted to mean the City of Ada. All references to the “Engineer” in the OklahomaDepartment of Transportation specifications shall be revised to read the “City of Ada - Public Works Director”, orhis designee. All references to the “State”, “Department”, “Highway Department” or “Transportation Commission”shall be interpreted to be “the City of Ada - Public Works Division” or “City of Ada” as applicable. Within thesespecifications the 2009 Edition of the Oklahoma Department of Transportation Standard Specifications for HighwayConstruction shall hereinafter be referred to as the “2009 ODOT Specs”, and the City of Ada shall hereinafter bereferred to as the “City”.Mix Design and ProportioningA) Classes of ConcreteThe following 2009 ODOT Specs classes of concrete shall be used by the City:Table 1: Concrete ClassesMinimumMinimum28-dayCementCompressiveContentStrengthlb/yd3Class(psi)(sacks/yd3)Class AA 4000Class A 3000Class C 2400*Class A(HES) 3000(3-day)*Class A 3000(5 +/- 1 Slump)564 (6.0)517 (5.5)395 (4.25)611 (6.5)517 (5.5)Air Content(%)6.5 +/- 1.56 +/- 1.56 +/- 1.5MaximumWater/CementRatio,(lb/lb)0.25-0.440.25-0.480.25-0.626 +/- 1.56 +/- 1.50.25-0.480.25-0.48Slump(inches)2 +/- 12 +/- 13 +/- 15 +/- 15 +/- 1Note: Fly ash meeting the requirements of the 2009 ODOT Specs Section 702, “SupplementaryCementitious Materials” may be substituted for up to 20% of the required cement. Make cementsubstitutions on a one-to-one basis by weight [mass].1) Use the weight of each material to calculate the water to cement ratio (W/C) using the following equation:W/C=Water/(Cement + Fly Ash)Determine the water use by adding the water measured into the batch, the water used in admixtures, and thefree water on wet aggregate and subtracting the water absorbed by dry aggregate.2) Ensure the slump reflects a workability appropriate for the application. If using a high-range water-reducing admixture, limit the slump to a maximum of 9 in [230 mm]. A specified concrete slump to bedelivered to the site shall be ordered by a city representative that is within the range in Table 1 for the classordered. A minimal amount of water may be added once on site to achieve the needed slump for the workto be performed. Water shall not be added in large amounts to achieve the slump ordered.3) Compressive strength shall be based on the average of the results of three test cylinders. Table 2 lists theproper uses for each class of concrete:Bid#26-96-10Page 3 of 10Table 2: Designated Concrete UsesConcrete Class (psi)Designated UsesClass AA 4000Concrete in superstructuresClass A 3000Pavements and substructures (pier caps, columns, abutments, retainingwalls, and reinforced concrete not requiring Class AA concrete)Class C 2400*Class A (HES) 3000(3-day)*Class A 3000(5 +/- 1 Slump)Soil erosion control structuresPavementsPavementsB) ProportioningDesign and produce concrete mixtures in accordance with Table 1, “Concrete Classes”. The mix design shallbe based on the absolute volume for the class of concrete specified and the consistency suitable for satisfactoryplacement of the concrete. Proportioning of the coarse and fine aggregate shall comply with ACI 211.1. Fineaggregate and the mixing water shall be kept to a minimum to ensure concrete of the required workability forplacement.High early strength concrete shall be 3000 psi concrete that meets the minimum strength requirement within 72hours of placement.The following information is required for each mix design:1) City identification included with each mix design designation2) Name and address of producer3) Mix design designation4) Aggregate sources, gradation, moisture content, and saturated surface dry batch mass5) Water source and test reports required by 2009 ODOT Specs Subsection 701.4, “Water”6) Fine aggregate fineness modulus7) Cement type and sources8) Fly ash source, if used9) Type of admixtures and sources10) High Range Water Reducer, if used in accordance with 2009 ODOT Specs Subsection 701.03.C, “HighRange Water Reducer (HRWR) Concrete Mixture11) Material proportions12) Unit weight13) Air content14) Slump15) Water to cement ratio16) Compressive strengths at 7 days and 28 days17) Compressive strengths at 72 hr for high early strength concrete18) Flexural strength at 28 days or 56 days for Class A used for concrete pavingSubmit new mix designs if:• The City rejects the mix design• Material sources change• The mix design produces unacceptable workability or production test resultsWith the extended bids that the City uses, source substitutions are allowed, but the substitutions must besubmitted to the City for approval before using a new source.Bid#26-96-10Page 4 of 10C) Tests and SamplesFor concrete sampling and testing, use the procedures in Table 3.Table 3: Concrete Sampling and TestingProperty TestedAASHTO TestProcedureSampling(a)T 141SlumpT 119AirT 152 or T 196Curing of Specimens(b)T 23Strength:Compressive(c)T 22Flexural(d)T 97(a) Sample pumped concrete after it isdischarged from the pump.(b) Maintain the initial curing temperature at40°F [4°C] or greater. The City will notrequire a recording thermometer.Maintain the final cure from 40°F to 85°F[4°C to 29°C] until tested.(c) Base compressive strengths on theaverage of three test cylinders.(d) Base flexural strengths on the average oftwo test beams.D) Mix Identification - Reference authorized mix identifications on batch tickets, test results, reports, andcorrespondence.Portland CementProvide cement that meets the requirements of the 2009 ODOT Specs Subsection 701.02, “Portland Cement”.AdmixturesOnly admixtures approved in the mix design and included in the bid price shall be used in any concrete. Noadmixtures shall be used to replace cement within the mix design. In using admixtures the producer shall:• Accurately measure admixtures into each batch,• Dispense admixtures in liquid form. Provide dispensers large enough to measure the quantity for eachbatch. Unless liquid admixtures are added to pre-measured water, arrange the discharge to uniformly flowinto the water stream.• Store admixtures to prevent freezing. Agitate admixtures to prevent solids from separating or settling. Donot use air agitation.• If more than one liquid admixture, use separate equipment to provide and dispense each admixture. Ensurethat admixtures are compatible when used in combination.• Air entraining admixtures shall be added during batching only.Bid#26-96-10Page 5 of 10
- Commodity Codes
-
- NAICS 238110Poured Concrete Foundation and Structure Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Solicitation A10-05-26-9170- ...
Procurement #164706 Title Solicitation A10-05-26-9170- Bid 2- Housing Rehab- Delaware County Status Active
Cherokee Nation
Bid Due: 7/09/2026
Solicitation A10-01-26-8939- ...
Procurement #164696 Title Solicitation A10-01-26-8939- Bid 2- Housing Replacement- Ottawa County Status Active
Cherokee Nation
Bid Due: 7/13/2026