IFB - Reseal Joints at Nervino Airport and Rogers Field
Project Information
- Bid Title
- IFB - Reseal Joints at Nervino Airport and Rogers Field
- Issuing Agency
- Plumas County Government
- Location
- California
- Published Date
- Mar 13, 2026
- Closing Date
- Apr 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: IFB - Reseal Joints at Nervino Airport and Rogers Field
Category: Plumas County Bids Status: Open Description: See the related documents for the full IFB and additional information.Â
Publication Date/Time: 3/13/2026 12:00 AM Closing Date/Time: 4/15/2026 4:00 PM Related Documents: - Attachment Preview
-
COUNTY OF PLUMASPLUMAS COUNTY AIRPORTSCONSTRUCTION PLANS FOR:RESEAL JOINTS IN AIRFIELD PAVEMENTSSCHEDULE ANERVINO AIRPORTRESEAL JOINTS IN PAVEMENTS - TAXIWAYS, APRON 1, AND HANGAR TAXILANESAIP No. 3-06-0020-___-2026SCHEDULE BROGERS FIELDRESEAL JOINTS IN TAXIWAY A PAVEMENTSAIP No. 3-06-0040-___-2026MARCH 2026COUNTY OF PLUMASAPPROVED FOR CONSTRUCTION:RECORD DRAWINGSREVIEWED BY:DATE:DATE:DESIGNED BY:6125 KING ROAD, SUITE 201 · LOOMIS, CALIFORNIA 95650 · (916) 652-4725ED APMROOFNEBSRSAIONNALNo. C 66558Exp. 6-30-2026ATECOFIVILCALIFORN11COUNTY OF PLUMASAPPROVED FOR CONSTRUCTION:RECORD DRAWINGSREVIEWED BY:COUNTY OF PLUMASCONSTRUCTION PLANS FOR:BECKWOURTH - NERVINO AIRPORTBECKWOURTH, CALIFORNIAAIP No. 3-06-0020-__-2026SHEDULE ARESEAL JOINTS IN PAVEMENTS - TAXIWAYS,APRON 1, AND HANGAR TAXILANESMARCH 2026SHEET INDEXA1COVER SHEET AND INDEXA2CONSTRUCTION SAFETY AND PHASING PLANA4JOINT SEAL PLAN - TW AND APRONA5JOINT SEAL PLAN - TW AND APRONA6JOINT SEAL PLAN - TW AND APRONA7JOINT SEAL DETAILSA8MARKING PLAN - TW AND APRONA9MARKING PLAN - TW AND APRONA10MARKING PLAN - TW AA11MARKING PLAN - TW A AND MARKING DETAILSDATE:DATE:DESIGNED BY:6125 KING ROAD, SUITE 201 · LOOMIS, CALIFORNIA 95650 · (916) 652-4725ED APMROOFNEBSRSAIONNALNo. C 66558Exp. 6-30-2026ATECOFIVILCALIFORNA1SCHEDULE A11XXXXXXXXNERVINO CTAF: 122.800WINDCONEROFARSAROFARSAROFARSAROFARSAXXROFARSAROFARSAROFARSAROFARSAROFAROFARSARSARUNWAY 8-26ROFARSAROFARSAROFARSAROFARSAAWOSROFARSA2000 100 200SCALE: 1"=200'ROFARSAROFARSAAIRPORT SERVICEROADB23 XXXXROFABEACON3ROFA3C53 XXXXROFA3 TOFAXXXXXXXXXXXXXX33ROFATOFA26D X X X28ROFA2ROFA2TOFAROFATOFA2ROFATOFA1 TOFAROFAE 9 1 XXX11TOFAROFAROFATOFAROFA2TOFATAXIWAY ATOFACONTRACTOR'S STAGING& STORAGE AREATOFAROFA1TOFAROFATOFAROFATOFAPAPITOFAROFAF 12XXXXXX 1ROFATOFAXXXXXXXXXXXXXXXXXXXXXCA HWY 70HAUL ROUTE ELECTRICAL VAULTFUEL ISLANDCONTRACTOR'S GATE& TANKSENDGLIENYEERSTAPHASE1A2A3AWORK PHASING SCHEDULECONTRACTOR'S WORK AREACRACK SEALTAXIWAY A EAST OF TEE HANGAR TAXILANESFACILITY CLOSURETAXIWAY A EAST OF TEE HANGAR TAXILANES, TAXIWAYE AND F.CRACK SEALTAXIWAY A WEST OF TAXIWAY D TO TAXIWAY E AND TEE HANGAR TAXILANESTAXIWAY A FROM TAXIWAY D TO TAXIWAY E, TAXIWAY DAND TEE HANGAR TAXILANESCRACK SEALTIEDOWN APRON WEST OF FUEL ISLANDTAXIWAY A AND APRON FROM FUEL FARM TO WESTEND OF APRON AND TAXIWAYS B & C.1BREMARK PAVEMENTSTAXIWAY A EAST OF TEE HANGAR TAXILANES2BREMARK PAVEMENTSTAXIWAY A WEST OF TAXIWAY D TO TAXIWAY E AND TEE HANGAR TAXILANES3BREMARK PAVEMENTSTIEDOWN APRON WEST OF FUEL ISLANDTAXIWAY A EAST OF TEE HANGAR TAXILANES, TAXIWAYE AND F.TAXIWAY A FROM TAXIWAY C TO TAXIWAY E, TAXIWAY DAND TEE HANGAR TAXILANESTAXIWAY A AND APRON FROM FUEL FARM TO WESTEND OF APRON AND TAXIWAYS B & C.RESTRICTIONSMINIMUM NOTICE OF 2 WEEKS PRIOR TO CLOSURE. WORK IN PHASE 1ACOMPLETED BEFORE CLOSING PHASE 2A. AIRCRAFT BACK TAXI ONRUNWAY FROM TAXIWAY D FOR RW 26 DEPARTURE.COMPLETE WORK PHASE 2A BEFORE MOVING TO PHASE 3A. AIRCRAFT BACKTAXI ON RUNWAY BETWEEN TAXIWAY C AND E.COMPLETE WORK PHASE 3A BEFORE MOVING TO PHASE 1B. AIRCRAFT BACKTAXI ON RUNWAY FROM TAXIWAY D TO RW 8. NO VEHICLE ACCESS TO WESTPORTION OF APRON. TEMPORARILY RELOCATE MEDIVAC HELICOPTER TO EASTPORTION OF APRON.MINIMUM NOTICE OF 2 WEEKS PRIOR TO CLOSURE. WORK IN PHASE 1BCOMPLETED BEFORE CLOSING PHASE 2B. AIRCRAFT BACK TAXI ONRUNWAY FROM TAXIWAY D FOR RW 26 DEPARTURE.COMPLETE WORK PHASE 2B BEFORE MOVING TO PHASE 3B. AIRCRAFT BACKTAXI ON RUNWAY BETWEEN TAXIWAY C AND E.AIRCRAFT BACK TAXI ON RUNWAY FROM TAXIWAY D TO RW 8. NO VEHICLEACCESS TO WEST PORTION OF APRON. TEMPORARILY RELOCATE MEDIVACHELICOPTER TO EAST PORTION OF APRON.NOTES:1. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE SECURITY, SAFETY ANDCLEANLINESS OF THE CONTRACTOR'S STORAGE AREA AT ALL TIMES.2. CONTRACTOR SHALL MAINTAIN HAUL ROAD AND PAVED SURFACES CLEAR OFDEBRIS AT ALL TIMES. RUNWAY AND TAXIWAYS SHALL BE MAINTAINED BROOMCLEAN.3. AIRPORT OWNER WILL PROVIDE A QUALIFIED FLAGGER TO MONITOR AIRPORTFREQUENCY 122.80 MHZ AND OBSERVE AIRCRAFT OPERATIONS WHENCONTRACTOR IS WORKING NEAR ACTIVE TAXIWAYS AND RUNWAYS.4. THIS PROJECT IS BID WITH A SIMILAR SCOPE PROJECT AT ROGERS FIELD.CONTRACTOR SHALL COMPLETE EACH PHASE OF WORK AT ROGERS FIELDPRIOR TO STARTING WORK AT BECKWOURTH NERVINO AIRPORT. IF A FIREEVENT OCCURS WHICH REQUIRES USFS FIRE FIGHTING OPERATIONS AT ROGERSFIELD, WORK MAY BE REQUIRED TO BE SHIFTED TO BECKWOURTH NERVINOAIRPORT. CONTRACTOR WILL BE ALLOWED 10 WORKING DAYS TO COMPLETEWORK AT BECKWOURTH NERVINO AIRPORT. ALL WORKING DAYS MUST BECONSECUTIVE UNLESS WORK IS SHIFTED TO ROGERS FIELD. NO WORK WILL BEPERFORMED ON SATURDAY OR SUNDAY.5. TAXIWAY AND APRON CLOSURE SHALL OCCUR FOR EACH PHASE OF WORK.WORK OPERATIONS ARE:(1) JOINT SEAL(2) REMARK PAVEMENT MARKINGSPAVEMENT MARKING WILL OCCUR AFTER THE COMPLETION OF ALL JOINTSEALING. ALL SEALING, RESEALING AND SEALING TOP-OFF WILL BE COMPLETEDPRIOR TO CONTRACTOR MOVING TO NEXT WORK PHASE. CONTRACTOR SHALLSUBMIT WORK SCHEDULE AT PRE-CONSTRUCTION MEETING OR TWO WEEKSPRIOR TO START OF WORK, WHICHEVER IS GREATER. AIRPORT MANAGER WILLISSUE THE APPROPRIATE NOTAMS FOR THE TAXIWAYS AND APRON CLOSURES.6. RUNWAY SHALL BE OPEN AND FULLY OPERATIONAL AT ALL TIMES.7. CONTRACTOR SHALL FURNISH, ERECT & MAINTAIN LIGHTED BARRICADES ATTHE BOUNDARY OF EACH WORK AREA ONLY WHEN AN AREA IS CLOSED TOKEEP AIRCRAFT OR VEHICLES FROM ENTERING THE CONTRACTOR'S WORKAREAS AND THE CONTRACTOR'S PERSONNEL & EQUIPMENT FROM OCCUPYINGANY OF THE AREAS OPEN FOR AIRCRAFT OPERATIONS. CONTRACTOR SHALLSUPPLY SUFFICIENT AMOUNT OF BARRICADES TO MAINTAIN A MAXIMUMDISTANCE BETWEEN BARRICADES OF 4 FEET. NO WORK SHALL BEGIN UNTILBARRICADES ARE ERECTED IN AREA CONTRACTOR IS WORKING.8. CONTRACTOR SHALL VERIFY LOCATION AND PROTECT EXISTING UTILITIES.SHOULD CONTRACTOR ENCOUNTER & DAMAGE A WATERLINE ON THEAIRPORT THEY SHALL IMMEDIATELY NOTIFY THE LOCAL FIRE DEPARTMENT.9. IN CASE OF AN AIRCRAFT EMERGENCY THE AREA AROUND THE AIRCRAFT SHALLBE EVACUATED AND NOT REENTERED BY THE CONTRACTOR WITHOUT GIVENPERMISSION EXCEPT FOR LIFESAVING ACTIVITIES10. ALL GATES USED BY THE CONTRACTOR SHALL REMAIN CLOSED AT ALL TIMESEXCEPT WHEN AUTHORIZED EQUIPMENT IS ACTUALLY ENTERING THE AIRPORTOR GATE IS CONTINUOUSLY GUARDED TO KEEP UNAUTHORIZED PERSONNELAND WILDLIFE FROM ENTERING THE AIRPORT.11. ALL EQUIPMENT OPERATING DURING DAYLIGHT HOURS SHALL BE EQUIPPEDWITH AN ORANGE AND WHITE CHECKERED FLAG OR FLASHING AMBERBEACON.12. CONTRACTOR WILL BE RESPONSIBLE FOR DUST AND EROSION CONTROLDURING THE DURATION OF THE PROJECT. ALL TRASH SHALL BE PLACED INWASTE CONTAINERS TO PREVENT THE ATTRACTION OF WILDLIFE. WASTECONTAINERS SHALL BE EQUIPPED WITH LIDS AND SECURED AT ALL TIMES. NOTRASH OR DEBRIS SHALL BE LEFT ONSITE BY CONTRACTOR.13. TAXIING AIRCRAFT WILL HAVE RIGHT OF WAY OVER CONTRACTOR'S VEHICLESAT ALL TIMES.CLOSED FACILITY SIGNAGE TABLESIGNNUMBER2SIGN FACEEASTWESTBCLOSUREPHASE33C35C36D28D29E111E112F1LEGENDXRSAROFATOFA2 XXXXXX3123CONTRACTOR'S STORAGE AREAEXISTING PAVEMENTEXISTING FENCERUNWAY SAFETY AREARUNWAY OBJECT FREE AREATAXIWAY OBJECT FREE AREAHAUL ROADARFF ACCESS ROUTEBARRICADE, PHASE IDENTIFICATIONCOVER EXISTING SIGN (SEE TABLE)TAXIWAY A - PHASE 1TAXIWAY A AND TEE HANGAR TAXIWAYS - PHASE 2TAXIWAY A AND WEST APRON - PHASE 3PHASING NOTES:1. CONTRACTOR SHALL FURNISH, PLACE, MAINTAIN & REMOVEBARRICADES AS NEEDED.2. THERE ARE THREE WORK AREAS FOR THIS PROJECT.WORK AREA 1 IS TAXIWAY A AS SHOW ON THE PLANS.WORK AREA 2 IS TAXIWAY A AND TEE HANGAR TAXILANESWORK AREA 3 IS APRON FROM FUEL FARM TO WEST END3. NO WORK SHALL BEGIN UNTIL ALL BARRICADES HAVE BEEN INSTALLEDTO CLOSE THE WORK AREA AS SHOWN ON THE PLAN FOR EACH PHASE.4. PHASE 1A, 1B, 2A, 2B, 3A, AND 3B WILL REQUIRE CLOSURE OF PORTIONOF TAXIWAY A AND CROSS TAXIWAYS. CLOSURE OF TAXIWAY A MAYREQUIRE AIRCRAFT TO BACK TAXI ON THE RUNWAY IN ORDER TORELOCATE FROM ONE END OF THE AIRPORT TO THE OTHER.5. CONTRACTOR SHALL GIVE AIRPORT 2 WEEKS NOTICE PRIOR TO STARTOF CONSTRUCTION.6. PHASES 1, 2, OR 3 MUST BE CLOSED AND BARRICADED AT THE START OFEACH DAY'S WORK AND REOPENED WITH BARRICADES REMOVED ATTHE END OF EACH DAY'S WORK. ONLY ONE PHASE MAY BE CLOSED AT ATIME.96" (84" WHEN CONNECTED)SAFETY ORANGE PRISMATIC REFLECTORWHITE PRISMATIC REFLECTORSOLAR WARNING LIGHTFORK LIFT GROOVESAFETY ORANGEWATER RELEASE PLUG10" WATER-FILLED BARRICADENOT TO SCALEBARRICADE NOTES:1. CONTRACTOR WILL FURNISH, INSTALL, AND MAINTAIN PLASTIC WATER-FILLED LIGHTEDBARRICADES.2. EACH BARRICADE SHALL HAVE 2 SOLAR-POWERED LIGHTS WITH RED LENSES EACH CONTROLLEDBY PHOTOCELLS SUCH THAT THEY ARE ON CONTINUOUS AT NIGHT AND OFF BY DAY.3. BARRICADES SHALL BE SECURED IF NECESSARY TO RESIST MOVEMENT FROM JET BLASTS ORPROP BLAST.4. LOCATE BARRICADES AS SHOWN ON THE PLAN AND DIRECTED BY RESIDENT PROJECTREPRESENTATIVE. SPACING BETWEEN BARRICADES SHALL NOT EXCEED 4 FEET. SEE THIS SHEETFOR LOCATIONS.5. AT THE COMPLETION OF EACH WORK SHIFT, ALL BARRICADES SHALL BE DRAINED OF WATERAND REMOVED FROM THE AIRPORT.SCHEDULE ADATE3/11/26DRAWNRBCHECKEDDBPROJECT No.02.15FILE0214.02.CSPPSCALE1"=200'SHEET No.A2 OF 112000 100 200SCALE: 1"=200'XXXXXXPACSPID DF5269NAVD88 EL. 4899.2N10187.33E9990.24XXXNOTES:1. THE BASIS OF THE BEARING FOR THIS PROJECT IS THE CENTERLINE OF RUNWAY 8-26WHICH BEARS WEST-EAST. END OF RUNWAY 8 IS HELD AS N10,000, E9,983.06.2. ALL MEASUREMENTS, PROJECT COORDINATES, AND STATION VALUES SHOWN AREGROUND DISTANCES, UNITS ARE IN US SURVEY FEET.LEGENDXRSAROFARPZTOFACONTRACTOR'S STORAGE AREAEXISTING PAVEMENTEXISTING FENCERUNWAY SAFETY AREARUNWAY OBJECT FREE AREARUNWAY PROTECTION ZONETAXIWAY OBJECT FREE AREATAXIWAY A - PHASE 1TAXIWAY A AND TEE HANGAR TAXIWAYS - PHASE 2TAXIWAY A AND WEST APRON - PHASE 3ENDGLIENYEERSTASACSEND RUNWAYPID DF5270RPZN10000.00E9983.06WINDCONEN10000.00NAVD88 EL. 4892.7N9882.30N10000.00RPZE10460.67E11113.77E11247.37N10000.00E12600.45AWOSEND RUNWAYN10000.00E14635.34ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFARSARSARSARSARSARSARSARSARSARSARSARSARSARSARSARSARSARUNWAY 8-26BCDEFTOFATOFATOFATOFATOFATOFATOFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFATOFATOFARPZAIRPORT SERVICEROADBEACONTOFATOFATOFASACSTAXTOFIAWAY ATOFATOFAPAPITOFAPID DF5271NAVD88 EL. 4891.5CONTRACTOR'S STAGING& STORAGE AREAN9901.72E12491.62XXXXXXXXXXXXXXXXXXXXCA HWY 70ELECTRICAL VAULTCONTRACTOR'S GATEFUEL ISLAND& TANKSBENCHMARK DISKG 143 1932NAVD88 EL. 4890.70N9581.15E12816.63RPZXSCHEDULE ADATE3/11/26DRAWNRBCHECKEDDBPROJECT No.02.15FILE0214.03.CoordSCALE1"=200'SHEET No.A3 OF 11LEGEND:N6000.000E5000.000AIRPORT GRID COORDINATEEXISTING EDGE OF PAVEMENTEXISTING JOINTSEXISTING JOINTS TO BE RESEALED(TYPE A, B OR C, SEE SHEET A7 FOR DETAILS)GENERAL NOTES:1. SEE SHEET NO. A7 FOR JOINT RESEALING DETAILS.2. RESIDENT PROJECT REPRESENTATIVE(RPR) WILL DESIGNATE IN THE FIELD WHICHJOINTS ARE TO BE RESEALED AS TYPE A, B, C, OR D.3. IT IS ESTIMATED THAT THE JOINT TYPE A (ASTM D8260 TYPE 2) WILL REQUIRE A 5"WIDE APPLICATION SPREADER BOX.4. ALL SINK HOLES OR LOW AREAS MUST BE RESEALED OR TOPPED OFF BYCONTRACTOR SUCH THAT THERE ARE NO LOW AREAS OF SEALANT AT THE END OFTHE PROJECT.5. CONTRACTOR WILL COMPLETE ALL SEALING, RESEALING AND TOP OFF BEFOREREMOVING BARRICADES AND ESTABLISHING THE NEXT PHASE OF WORK. SEE SHEETA2 FOR PHASING DETAILS.6. ALL WORK AREAS SHALL BE CLEANED OF ALL DEBRIS AND OPENED TO AIRCRAFTTRAFFIC EACH NIGHT. BARRICADES SHALL BE REMOVED AT THE END OF EACH DAYAND REPLACED PRIOR TO THE NEXT DAYS WORK.X400 20 40SCALE: 1"=40'THIS SHEETXXNXRUNWAY 8-26ENDGLIENYEERSTA52.00'4 SPACES@ 13.00'60.70'4 SPACES@ 15.18'28.32'2 SPACES@ 14.16'45.30'3 SPACES@ 15.10'40.00'3 SPACES @ 13.33'179.16'12 SPACES@ 14.93'67.54'4 SPACES@ 16.89'52.00'4 SPACES@ 13.00'15.49'40.00'3 SPACES@ 13.33'16.56'TAXIWAY A58.56'4 SPACES@ 14.64'49.82'8 SPACES@ 14.18'60.74'4 SPACES@ 15.18'120.87'8 SPACES@ 15.10'XXXXXXXXXXXXX10.49'XSCHEDULE ADATE3/11/26DRAWNRBCHECKEDDBPROJECT No.02.15FILE0214.04.JointsSCALE1"=40'SHEET No.A4 OF 11
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PROJECT NO.: 1801: MEDIAN LAN...
TITLE RFP/BID DUE DATE PROJECT NO.: 1801: MEDIAN LANDSCAPE: AVALON BLVD. FROM I-405
City of Carson
Bid Due: 7/07/2026
Whittier Narrows Recreation A...
Solicitation Number: BRC0000679 Title: Whittier Narrows Recreation Area Splash Pad Project - REBID
County of Los Angeles
Bid Due: 7/07/2026