Bunten Road Park Improvement Project
Project Information
- Bid Title
- Bunten Road Park Improvement Project
- Issuing Agency
- City of Duluth
- Location
- Georgia
- Published Date
- Dec 23, 2025
- Closing Date
- Jan 22, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Bunten Road Park Improvement Project
RFP
December 23, 2025
2:50
January 22, 2026
11:00
AM
- Attachment Preview
-
Bunten Road Park Improvement ProjectAddendum #3 – Issued December 23, 2025NEW DUE DATE – THURSDAY, JANUARY 22, 2026 11:00amNEW DEADLINE FOR QUESTIONS – JANUARY 9, 2026 at 5:00p.FINAL ADDENDUM TO BE POSTED – JANUARY 15, 2026.Questions with Responses through 12/23/2025:12/19/20251. On the schedule of items list, item number 56 is repeated. Is this correct?a. RESPONSE: Yes, this is correct. There are 2 cultivars with different sizes, sothe line item appears twice intentionally.2. On the schedule of items list, item number 94 says PVC. Is this correct orshould it be RCP?a. RESPONSE: Yes, PVC is correct and is required per design.3. On the schedule of items list, item number 103 says 2 LS. Is it one (1) or two (2)lump sums?a. RESPONSE: LS is incorrect; the Unit should be listed as EA for Each. TheQuantity of 2 is correct. An updated bid form will be provided with the finaladdendum in January.4. On the schedule of items list, item number 207 says 2 LS. Is it one (1) or two (2)lump sums?a. RESPONSE: LS is incorrect; the Unit should be listed as EA for Each. TheQuantity of 2 is correct. An updated bid form will be provided with the finaladdendum in January.12/22/20251. Please let us know whether we need Design Build Irrigation system for thelandscape plan and there is no mention about the irrigation system in the plansor the Bid Schedule, kindly confirm.a. RESPONSE: Irrigation is not part of the scope.12/22/20251. The typical Asphalt sections shown make us wonder if all pavement is to beremoved, install fabric, GAB and new asphalt pavement. Is that correct? If notplease provide a new detail outlining scope of work.a. RESPONSE: There are two trail conditions included in the plans:(1) areas where the existing trail will be removed and replaced in the samealignment, and(2) areas where the trail will be removed, regraded, and constructed in a newalignment.In both cases, the existing asphalt is to be removed and the new trailconstructed per the Typical Trail Section on Sheet C-7.1, including fabric,GAB, and asphalt thickness as shown.• Any grading and subgrade adjustments associated with trailrealignment are included under the earthwork scope, not in theasphalt quantity.2. The typical asphalt sections show GAB and asphalt replacement (all new). Isthat correct? If it’s repair, mill & pave, what are the pavement details forparking lot, roadways, and trail? As you can see, we are having difficultygrasping the scope of work to price. 1. Asphalt trail 10,156 SY. Plans indicate aportion to trail is to be removed & replaced completely. This work would be 6”GAB and 4” 9.5mm placed in two lifts (see C-24). The remainder of trail is toreceive what scope of work? Mill & Pave 2”, 4” or what? 2. Asphalt parking Lot wgrading 2,007 SY is to receive 7” GAB, 2” 19mm and 1.5”9.5mm. 3. Asphaltroadway & parking lot 14,010 SY is to receive what treatment? Is it mill and pavewith 1.5” 9.5mm or what?a. RESPONSE:Trail Scope ClarificationThe 10,156 SY asphalt trail quantity represents full depth removal andreconstruction of the entire asphalt trail system. This applies to both trailsegments remaining in existing alignment and those being realigned andregraded.• All reconstructed trail segments shall follow the Typical Trail Sectionon Sheet C-7.1.• Locations and limits of trail work, including areas of realignment andgrading, are identified on the Hardscape Plans.• Any grading and subgrade adjustments associated with trailrealignment are included under the earthwork scope, not in theasphalt quantity.Parking Lots & Drives ClarificationRefer to Sheet G-4 for pavement treatment limits.• Areas identified for removal and grading shall be reconstructed perTypical Section C-7.2.• Areas not identified for removal/regrading are to receive overlay andrestriping only. No milling is required except where necessary for tie-ins.12/22/2025Please help me understand and clarify the scope of work intended for the followingwhen you only provide two typical sections for this work yet plans identify multiplescope of work.1. Trail repair typical shows 6” GAB and two layers of 2” 9.5mm. For example PlanSheet C-2.4 indicates two types of work. One is clearly full depth replacementper typical section provided. It is unclear regarding the scope of work forremainder of trial(if any). Please clarify.a. RESPONSE:Trail Scope ClarificationThe intent is full depth trail replacement for the entire trail system. Thisincludes:(1) segments remaining in existing alignment, and(2) segments that require grading and realignment• There is no partial trail repair scope. The intent is full depth replacementfor all trails.• All trail reconstruction shall follow the Typical Trail Section (Sheet C-7.1)with 6” GAB and two lifts of 2” 9.5mm asphalt.• Trail locations and alignment adjustments are shown on the HardscapePlans.• Any grading associated with realignment is included under earthwork, notasphalt quantity.2. Only one typical section is provided for roadway and parking lot repair. Thisindicates 7” GAB, 2” 19mm and 1.5” 9.5mm. For example Sheet C-2.6 show asmall section of roadway and parking replacement which is clearly per thistypical section. However the bid schedule indicate 14,010 SY for repave parkinglot and drive overlay. No typical or scope is provided for this work. Is it to bemilled and paved with 1.5” 9.5mm? Is milling to be edge milling for tie-ins formill the entire parking lot and roadway to remove reflective crackremoval? Please clarify.a. RESPONSE:Parking Lots & Drives ClarificationThere are two conditions for parking and drive pavements:(1) Full Depth Reconstruction: Where pavement replacement and grading isshown on the plans, reconstruct per Typical Section C-7.2(7” GAB, 2” 19mm, 1.5” 9.5mm)(2) Overlay & Restriping: The bid schedule quantity of 14,010 SY applies toareas identified as overlay and restripe only.• These locations and limits are shown on Sheet G-4.• This work is overlay and restriping only. No milling is required exceptwhere necessary for tie-ins.12/23/20251. This is regarding the estimated quantities on this project "934LF of thepedestrian guardrail". Would a substitution of Industrial Aluminum Fence work?Specs: Black Finish 42" Flush Top/Bottom Square 1 ½ Rails Square 2 ½ PostSquare 1" Pickets. Please let us know.a. RESPONSE: At this time, substitutions will not be considered during the bidphase. Please price the pedestrian guardrail in accordance with the plansand specifications so all bids remain comparable.Any substitution requests may be submitted for review after award, inaccordance with the contract documents.
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
26-272 Deans Bridge Road MSW ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-72155-NONST-2026-000000194
State Government of Georgia
Bid Due: 8/06/2026
160-172 Dalrymple Road Stormw...
Project: 160-172 Dalrymple Road Stormwater Improvement Ref. #: 26-053 Type: ITB Status: Open
City of Sandy Springs
Bid Due: 7/07/2026