Southeast Regional WWTP Upgrade and Expansion Progressive Design-Build

Project Information

Bid Title
Southeast Regional WWTP Upgrade and Expansion Progressive Design-Build
Issuing Agency
Onslow Water and Sewer Authority
Location
North Carolina
Published Date
May 28, 2025
Closing Date
Jul 3, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid Title: Southeast Regional WWTP Upgrade and Expansion Progressive Design-Build
Category: Professional Services
Status: Open
Description:

Request for Qualifications: Southeast Regional WWTP Upgrade and Expansion Progressive Design-Build

General

ONWASA owns and operates the Southeast Regional North Topsail Wastewater Treatment Plant (SER WWTP) (formally known as the North Topsail Wastewater Treatment Plant) located at 1095 State Hwy 210, Sneads Ferry, North Carolina in southeastern Onslow County. The SER WWTP serves approximately 6,000 residential and commercial customers and is permitted to process and discharge 1.542 million gallons per day (MGD) with a 0.542 MGD rating for the passive lagoon treatment train and 1.0 MGD for the membrane bioreactor (MBR) train and highrate infiltration basins.

ONWASA also owns and operates Holly Ridge WWTP and Summerhouse WWTP. In addition to accommodating growth in the service area, ONWASA also plans to decommission the Holly Ridge WWTP and convey flow to Summerhouse WWTP with excess flow to SER WWTP. Additional capacity is needed at SER WWTP, and the plant upgrade and expansion project are anticipated to expand the existing 1.5 MGD facility to a 3.5 MGD facility.

SOQ Due Date and Time

Proposer's SOQ shall be submitted no later than:

2:00 PM on Thursday, July 3, 2025

Scope of Work

The Design-Builder will work with ONWASA and their Owner’s Advisor (HDR) to determine the needed improvements, final layout, sizing, and specific facilities to meet the goals of ONWASA for this project. The Design-Builder will provide the resources and staff to deliver the final project that will include, but not be limited to:

a. Implement a robust safety program for all design and construction related activities.

b. Implement the “Onslow Water and Sewer Authority Guidelines for Recruitment and Selection of Minority

Businesses for Participation in Authority Construction Contracts” policy.

c. Deliver quality assurance and quality control of design and construction related activities.

d. Lead interactive design workshops with ONWASA and HDR, Owner’s Advisor.

e. Complete all preliminary and final design engineering efforts for the project with design document submittals

at 30%, 60%, and 100%.

f. Implement a project controls strategy that keeps ONWASA and HDR informed of all project components.

g. Develop an initial opinion of cost with submittal at the 30% design stage, updated cost at 60% design stage

and GMP(s). An updated cost opinion should be maintained throughout the Phase 1 effort in a format

acceptable to ONWASA.

h. Develop alternatives analysis including capital and life-cycle costs to assist ONWASA in making key

decisions.

i. Complete all surveying and geotechnical engineering required for successful design, construction and

development of construction pricing.

j. Work with ONWASA and HDR to finalize all permitting activities and obtain permits required for project

construction.

k. Develop and maintain a project risk register with costs in a format acceptable to ONWASA.

l. Provide all necessary project management, documentation, and progress reporting as required for a

successful project.

m. Implement an “Open-Book” and transparent progressive design-build process.

n. Work collaboratively with the ONWASA’s operations, maintenance, and management team to provide key

information to make decisions.

o. Provide engineering services during construction to include RFIs, shop drawing reviews, contractor change

order requests, factory witness equipment testing observation and reports, preparation of record drawings,

and project management support.

p. Construction management services.

q. Lead start-up, performance testing, and any necessary training of ONWASA staff in successful operation of

the Treatment Plant.

r. Complete project close-out activities including final punch-lists, operations and maintenance manual

production, training, project certifications, documentation for asset management, and warranty efforts.

For more details, see the Request for Qualifications below under "Related Documents."

NC Certified HUB Contractors are encouraged to submit proposals for all bid opportunities at ONWASA.

Publication Date/Time:
5/28/2025 12:00 AM
Closing Date/Time:
7/3/2025 2:00 PM
Contact Person:
Jeffrey T. Lohr, PE, Assoc. DBIA
Chief of Engineering
Onslow Water and Sewer Authority
228 Georgetown Rd, Jacksonville, NC 28540
Phone: (910) 937-7509
Email: jlohr@onwasa.com
Miscellaneous:
A pre-proposal meeting will be held June 1, 2025 at 1:00 PM at the Southeast Regional WWTP located at 1095 State Hwy 210, Sneads Ferry, NC.
Related Documents:
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

PRB.37212 - CONSTRUCTION OF D...

PRB.37212,51830.2.11.08,Helene POC PRB.37212 - CONSTRUCTION OF DESIGN BID BUILD BRIDGE REPLACEMENT ON PRIVATE

Division of Highways

Bid Due: 7/15/2026

Carmel and Mooreland Farms Ro...

Project: Carmel and Mooreland Farms Road Sidewalk Gap Ref. #: 269-2026-238 Department: City

City of Charlotte

Bid Due: 7/23/2026