Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
Project Information
- Bid Title
- Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
- Issuing Agency
- City of Sanford
- Location
- Florida
- Published Date
- Jan 28, 2026
- Closing Date
- Mar 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IFB 25/26-02
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Main
Agency
City of Sanford
Status
Active
Fiscal Year
2026
Title
Hidden Lakes Floridan Aquifer Well 10 Replacement Construction and Testing Program
Number
IFB 25/26-02
Type
Invitation to Bid
Department
Utilities-Plants
Online Submissions
No
Project EstimatePiggyback Solicitation
No
Insurance Required
No
Bid Bond Required
Yes
Bid Bond Amount
5%
Performance Bond Required
No
Performance Bond Amount
Construction Bond Required
No
Construction Bond Amount
Scope of Services
The replacement water supply well will be located at the former site of the Hidden Lakes wellfield well 10 in Lee P. Moore Park at 106 Sweet Bay Drive in Sanford.
Dates(All times are listed as EST )
Broadcast Date
12/16/2025 4:00 PM EST
Question End Date
2/19/2026 2:00 PM EST
Sample Due DateDue Date
3/5/2026 2:00 PM EST
Bid Opening Date
Question End Date Reminder Notification
2 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
Due Date Reminder Notification
0 Day(s)
Pre-Bid Meetings
Total: 0 (All times are listed as EST )
Date Time Mandatory Location Shortlist Meeting
Total: 0 (All times are listed as EST )
Date Time Location Documents
Total: 9Questions & Answers
Total: 20Question Date Asked Answer Date Answered 1. Website shows no bid bond, but the specs states a 5% bond- please confirm.
2. Please confirm bid is due in person at 300 N. Park Avenue STE 236 Sanford, FL 32771?12/17/2025 6:32:35 AM You are correct tere is a bid bond required. Address is also correct. Addendum #1 has been uploaded. 12/17/2025 4:35:35 PM The specifications indicate that the contractor shall furnish and install a vertical turbine pump assembly and appurtenances. It seems the specifications are missing the information related to this work. Please provide drawings as well. 12/19/2025 12:39:36 PM Awaiting response from the user department. 1/12/2026 3:25:24 PM 1. 00010-2 Division 11 Equipment. Section 11213
Vertical Turbine Pump. There is no section in the
Specifications. Can You please provide this?
2. Can a site visit be set up?
3. Is water Available onsite for construction Use? Is
there a cost?
4. Specifications state the bid is Lump Sum, but also
states will be paid per quantities used. Is it Lump
Sum, or Quantity?
12/23/2025 11:04:29 AM Awaiting response from the user department. 1/12/2026 3:25:32 PM Section 02444 Cain Link Fence And Gate. The specifications do not give gate dimensions. it states as shown on figure-2 but there is no figure-2. Can you please provide drawing for gate? 12/23/2025 11:44:55 AM Awaiting response from the user department. 1/12/2026 3:25:40 PM the newest addendum states " DUE DATE
This Addendum does not change the solicitation due date. As such, the solicitation response is due no later than January 8, 2026 at 2:00PM Local Time."
This is very misleading - is the solicitation response now due for January 8th? Or will it remain January 15th??1/6/2026 10:01:03 AM We apologize for the confusion. The due date is January 15, 2026 @ 2:00pm Local Time. 1/6/2026 1:51:32 PM There is no figure-2 to show us the chain link fence as requested? 1/6/2026 10:02:20 AM Awaiting response from the user department. 1/12/2026 3:26:00 PM There are no vertical turbine pump assembly and appurtenances specification? Although it requests it and is not specified? 1/6/2026 10:03:24 AM Awaiting response from the user department. 1/12/2026 3:26:08 PM There does not appear to be any answers to any questions dating back to 12/19, we request the question deadline be extended as well as the bid solicitation due date be extended as well. 1/6/2026 10:04:33 AM Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time. 1/6/2026 2:08:44 PM On 1/06 the City answered: "Unfortunately, there will be no extension to the question deadline, at this time. We are awaiting end-user’s response. The answers will be posted no later than 1/8/26 @ 2:00pm Local Time." but what if there are questions that arise after the answers are given? If there`s added specification regarding that turbine pump being requested and added drawings on the gate (which both were not initially included), then there may be further questions needed answered - unless it is the city`s intent to remove those conditions. 1/8/2026 11:33:09 AM Please note... Addendum #3 has been updated to with extension. 1/12/2026 3:25:00 PM Can you please clarify the sampling 02522-18 3.12
states which samples are to be field and lad, however the last set does not state, can we assume the TDS, bicarbonate, calcium, sulfide, total alkalinity, total hardness, TOC, and dissolved Organic Carbon are lab only?1/15/2026 2:30:09 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:00 AM Will contractor be required to re-sod all disturbed areas? 1/15/2026 2:35:11 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:13 AM the specifications states to plan up to 1000-feet of discharge hose. Can the Owner tell Contractor, where it was planned to discharge too from well site? also will the route require crossing roadways, sidewalks etc. 1/15/2026 2:37:15 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:24 AM Can the owner give an exact location of replacement 10R in Park? 1/15/2026 2:41:12 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:34 AM Will the owner trim trees if required to bring in drilling equipment? 1/15/2026 2:41:39 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:48 AM The specifications do not state working days and times. This site is located in a residential area, and Gated City Park. Please provide working days and hours 1/15/2026 4:45:27 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:50:56 AM Will bidders receive answers to all of the questions? 1/15/2026 4:46:05 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:51:07 AM Is a fence required around construction area, also where can Contractor stage material and equipment 1/15/2026 5:23:57 PM Addendum#4 has been posted. Please see the addendum and updated solicitation attached in VendorLink. 1/28/2026 11:51:32 AM When can we expect the answers to all the questions? 1/20/2026 7:26:43 AM We are still awaiting the user department's response. Please allow 3 business days for follow up. 1/22/2026 2:29:19 PM Can you give a date and time to meet for a site visit? 1/28/2026 2:11:56 PM Per "Section IV. Instructions to Bidders: Additional Instructions See Section 0200. A.) Pre-Bid Conference. There will be no pre-bid conference for this project. Change if there is a pre-bid
meeting."1/28/2026 4:59:21 PM Don`t see updated bid sheet. Is one going to be sent? 1/28/2026 2:16:35 PM Please see page 35 for Bid Form. 1/28/2026 5:01:17 PM Commodity Codes
Total: 9
Code Description [890-89] Well Pointing Systems, Accessories and Parts [962-96] Well Services (Including Oil, Gas, and Water): Drilling, Plugging, Consulting, Maintenance, Repair, etc. [967-92] Well Equipment and Supply Manufacturing Services (Oil, Gas, Water, etc.) [968-93] Well Pointing Services (Dewatering) [210-29] Culverts, Corrugated Metal (Incl. Well Casing Pipe) [545-96] Water Well Drilling Equipment [720-84] Water Well Accessories: Drive Points, Foot Valves and Strainers, Leather Cups, Sucker Rods, Well Cylinders, etc. [962-92] Video Scanning of Sewers, Water Wells, etc. [981-84] Water and Sewer Equipment (Including Well Pointing Equipment) Rental or Lease Publications
Total: 0
Publication Date - Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
- NAICS 541380Testing Laboratories
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Orange County Corrections Dep...
Project ID: Y25-790-RC Title: Orange County Corrections Department Female Detention Center Two Cell
Orange County
Bid Due: 7/14/2026
Drainage Repair and/or New Pu...
Project ID: 25/26-094 Title: Drainage Repair and/or New Public Works Construction Addenda: 0
Clay County
Bid Due: 7/09/2026