Well No. 12 Booster Pump Assembly Replacements

Project Information

Bid Title
Well No. 12 Booster Pump Assembly Replacements
Issuing Agency
Cary village
Location
Illinois
Published Date
Jun 10, 2026
Closing Date
Jun 25, 2026
Government Level
State & Local
Status
Closed
Ref. #
06-01-2026
Original Source
Join to Access Full Details
Project Description
Bid Number: 06-01-2026
Bid Title: Well No. 12 Booster Pump Assembly Replacements
Category: Public Works
Status: Open
Description:

This Request for Sealed Bids (RFB) is for the purpose of contracting with a qualified firm to Provide all labor, equipment, appurtenances, and materials necessary for the removal and replacement of two (2) booster pump assemblies including the pumps, motors, automatic control valves, electrical disconnects, and power connections. This work may include securing permits; site restoration; traffic control; testing and all other work necessary for installation of complete and functional booster pumps and motors meeting IEPA and Village standards as shown, specified, or required.

Bid details can be found here: DemandStar.com Â

Publication Date/Time:
6/10/2026 12:00 PM
Publication Information:
Northwest Herald 6/11/2026
Closing Date/Time:
6/25/2026 11:00 AM
Contact Person:
Caty Ward
Capital Projects Manager
cward@caryillinois.com
847-639-0003 x 8106
Miscellaneous:
This is a Request for Sealed Bids. Bids will be opened and read publicly. The Village reserves the right to evaluate bids for completeness and qualifications. One (1) original copy is to be submitted at the address below. No electronic submission is allowed.
Mailing/Shipping Address:
Village of Cary
Attn: Caty Ward, Capital Projects Manager
755 Georgetown Drive
Cary, IL 60013
Drop-Off In-Person:
Same as Mailing Address.
8:30 am to 5:00 pm, Monday-Thursday, excluding holidays
8:30 am to 12:00 pm, Friday, excluding holidays
Related Documents:
Attachment Preview
Request for Bids
Village of Cary
Well No. 12 Booster Pump Assembly Replacements
June 10, 2026
This Request for Sealed Bids (RFB) is for the purpose of contracting with a qualified firm to
Provide all labor, equipment, appurtenances, and materials necessary for the removal and
replacement of two (2) booster pump assemblies including the pumps, motors, automatic
control valves, electrical disconnects, and power connections. This work may include securing
permits; site restoration; traffic control; testing and all other work necessary for installation of
complete and functional booster pumps and motors meeting IEPA and Village standards as
shown, specified, or required.
Any communication regarding this RFB between the date of issue and the date of award is
required to go through the Contact Person listed below. Unauthorized contact with other
Village staff is strictly forbidden.
GENERAL REQUIREMENT:
This is a Request for Sealed Bids. Bids will be opened and read publicly. The Village reserves the
right to evaluate bids for completeness and qualifications. One (1) original copy is to be
submitted at the address below. No electronic submission is allowed.
Mailing/Shipping Address:
Village of Cary
Attn: Caty Ward, Capital Projects Manager
755 Georgetown Drive
Cary, IL 60013
Drop-Off In-Person:
Same as Mailing Address.
8:30 am to 5:00 pm, Monday-Thursday, excluding holidays
8:30 am to 12:00 pm, Friday, excluding holidays
Page 1 of 23
Contact Person:
Caty Ward
Capital Projects Manager
cward@caryillinois.com | (847) 639-0003 x 8106
SUBMISSION DATE AND TIME:
By 11:00 AM (CST), Thursday, June 25, 2026
Bids received after the submittal time will be rejected and returned unopened to the sender.
06/10/2026
06/18/2026
06/19/2026
06/22/2026
06/25/2026
Schedule of Events
RFB Available on DemandStar/Euna OpenBids
Mandatory Contractor Site Visit at 286 Moders Road, Cary, IL 60013 at 10:00 AM
Contractor Questions Submitted via Email to cward@caryillinois.com by 12:00 PM.
Vendor Questions Answered via Addendum on DemandStar/Euna OpenBids by 5:00
PM
Bids Due by 11:00 AM (CST) and Public Bid Opening at the Cary Municipal Center
GENERAL INFORMATION
TERMS AND CONDITIONS
RESERVED RIGHTS
The Village reserves the right at any time and for any reason to cancel this RFB and to reject any
or all bids, or to accept a portion of the bid or any alternate bid. The Village reserves the right to
waive any immaterial defect in any bid. Unless otherwise specified by the offeror, the Village has
no less than one hundred and twenty (120) days to accept. The Village may seek clarification
from the Contractor at any time and failure to respond promptly is cause for rejection. The Village
may require submission of the best and final offers.
INCURRED COSTS
The Village will not be liable in any way for any costs incurred by respondents in replying to this
RFB.
AWARD
Award shall be made by the Village to the most responsive and responsible Contractor whose bid
is determined to be the most advantageous, taking into consideration price and the evaluation
criteria set forth herein below.
Page 2 of 23
NON-DISCRIMINATION
Contractor shall comply with the Illinois Human Rights Act, 775 ILCS 5/1-101 et seq., as amended
and any rules and regulations promulgated in accordance therewith. Including, but not limited to
the Equal Employment Opportunity Clause, Illinois Administrative Code, Title 44, Part 750 (Appendix
A), 775 ILCS 5/1-102, which is incorporated herein by reference, and constituting of a written EEO
Policy and a workforce profile that demonstrates its EEO practices. Furthermore, the Contractor shall
comply with the Public Works Employment Discrimination Act, 775 ILCS 10/0.01 et seq., as
amended. The Contractor must have a written sexual harassment policy, which meets Illinois State
Statutes, 775 ILCS, 15/3.
SECURITY
The Contractor represents and warrants to the Village that neither it nor any of its principals,
shareholders, members, partners or affiliates, as applicable, is a person or entity named as a Specially
Designated National and Blocked Person (as defined in Presidential Executive Order 13224) and that
it is not acting, directly or indirectly, for or on behalf of a Specially Designated National and Blocked
Person. The Contractor further represents and warrants to the Village that the Contractor and its
principals, shareholders, members, partners, or affiliates, as applicable, are not directly or indirectly,
engaged in, and are not facilitating, the transactions contemplated by this Agreement on behalf of
any person or entity named as Specially Designated National and Blocked Person. The Contractor
hereby agrees to defend, indemnify and hold harmless the Village, the Corporate Authorities, and
all Village elected or appointed officials, officers, employees, agents, representatives, engineers and
attorneys, from and against any and all claims, damages, losses, risks, liabilities, and expenses
(including reasonable attorneys’ fees and costs) arising from or related to any breach of the foregoing
representation and warranties.
OSHA REQUIREMENTS
The Occupational Safety and Health Act of 1970 (OSHA) “guarantees workers the right to a safe
and healthful workplace”. Under Section 5(a) (1) of the OSHA Act, the employer must “furnish to
each of his employees’ employment and a place of employment which are free from recognized
hazards that are causing or likely to cause death or serious physical harm to his employees.”
There are times when the Village must hire entities and individuals (contractors) to perform
services. To this end, Contractors hired by the Village must perform their duties in a manner that
is compliant with all state and federal health and safety laws and industry guidelines. It is the
responsibility of the Contractor to ensure that their personnel and subcontractors comply with
all state and federal health and safety laws and regulations and industry guidelines, including, but
not limited to those set forth by: OSHA and related regulations, the Safety Inspection and
Education Act, the Health and Safety Act, the National Institute of Occupational Safety and Health,
Page 3 of 23
the National Fire Protection Association, the Centers for Disease Control, American Industrial
Hygiene Association, the American Council of Governmental Industrial Hygienists, the
Environmental Protection Agency, and the Department of Transportation.
RIGHT TO PROTEST
Any actual or prospective bidder or Contractor who is aggrieved in connection with the solicitation
or award of a Contract may protest to the Contact Person. Any protest must be submitted in writing
within ten (10) calendar days from the issuance of the solicitation, addendum, and notice of award
or other decision by the Public Works Department.
PRE-BID SITE VISIT
A pre-bid site visit to Well No. 12, located at 286 Moders Road, Cary, IL 60013 is being held on June
18, 2026, at 10:00 AM. Attendance at the pre-bid site visit is mandatory. Bids from contractors not
represented at the site visit will be deemed non-responsive and rejected. Contractors will be
required to sign in at the site visit. Bidders shall submit any questions resulting from the site visit to
the Contact Person. An addendum will be issued by the deadline as outlined in the schedule of
events including, but not limited to, questions or clarifications resulting from the site visit.
Contractor acknowledges that existing conditions may vary from available records and shall verify
field conditions prior to bidding. No additional compensation shall be granted for conditions
reasonably observable during the mandatory site visit.
ADDENDUM
Should the Contractor require any additional information about this Bid, please contact the Contact
Person with any questions by the deadline as outlined in the schedule of events. The Contractor is
solely responsible for ensuring that any question submitted to the Contact Person via email has been
received. If the Contact Person does not provide written confirmation of receipt within twenty-four
(24) hours after the Contractor's email submission, the Contractor shall take appropriate action to
verify receipt. The Contractor shall not assume that a question has been received by the Contact
Person unless and until the Contact Person provides confirmation of receipt. ANY AND ALL changes
to these specifications are valid only if they are included by Written Addendum to All Bidders. No
interpretation of the meaning of the plans, specifications, or other contract documents will be made
orally. Failure of the bidder to receive any such addendum or interpretation shall not relieve the
bidder from obligation under this Bid as submitted. All addenda so issued shall become part of the
bid documents. Failure to request an interpretation constitutes a waiver to later claim that
ambiguities or misunderstandings caused by a bidder to improperly submit a bid.
Page 4 of 23
Response to these questions will be made by means of an addendum and posted on OpenBids-
DemandStar. Only the Director of Public Works or someone designated by the Director of Public
Works has the authority to issue an addendum.
Addenda are written instruments issued by the Village prior to the date for receipt of bids, which
modify or interpret the Bid by addition, deletions, clarifications or corrections.
Prior to the receipt of bids, addenda will be posted. Each Contractor shall ascertain prior to
submitting a bid that all addenda issued have been received and, by submission of a bid, such act
shall be taken to mean that such Contractor has received all addenda and that the Contractor is
familiar with the terms thereof and understands fully the contents of the addenda.
TAXES
The Village is exempt from paying Illinois Use Tax, Illinois Retailers Occupation Tax, and Federal
Excise Tax.
PAYMENTS
Bidders are advised that this Project is subject to the requirements of the Employment of Illinois
Workers on Public Works Act (30 ILCS 570/) and the Illinois Prevailing Wage Act (820 ILCS 130/1-
12).
The Contractor shall furnish the Village, upon request, with an itemized invoice with IDOL certified
transcript of payroll, certifying prevailing wage requirements are met. Payment shall be made in
accordance with applicable provisions of the "Local Government Prompt Payment Act."
No extra work shall be performed and no additional compensation shall be due unless authorized
by written change order executed by the Village.
The bid price shall include all labor, supervision, equipment, materials, tools, mobilization,
transportation, testing, startup, commissioning, permits, bonds, insurance, restoration, disposal,
freight, overhead, profit, and all other work necessary to complete the project as specified. No
separate payment will be made for any item of work unless specifically identified as a separate
pay item in the Bid Form. All costs not specifically identified as a separate pay item shall be
considered incidental to the Contract and included in the Contractor's bid price.
The Village will hold 10% retainage on all progress payments until completion of 50% of the
contract. Upon 50% completion, the Village will reduce retainage on future progress payments to
5%.
CONTRACTOR RESPONSIBILITIES
Page 5 of 23
Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Well No. 12 Booster Pump Asse...

Bid Number: 06-01-2026 Bid Title: Well No. 12 Booster Pump Assembly Replacements Category:

Cary village

Bid Due: 7/09/2026

Hibbard ES - Domestic Booster...

Project: Hibbard ES - Domestic Booster Pump Replacement - Open to contracted pre-qualified

Chicago Public Schools

Bid Due: 7/14/2026