Remodeling of Red Clay Theater
Project Information
- Bid Title
- Remodeling of Red Clay Theater
- Issuing Agency
- City of Duluth
- Location
- Georgia
- Published Date
- Nov 21, 2025
- Closing Date
- Jan 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Description Opening Date/Time Closing Date/Time
Remodeling of Red Clay Theater
PME
November 21, 2025
:
January 15, 2026
2:00
PM
- Attachment Preview
-
ABBREVIATIONSAAVA/CA/FAFF, AFGB/F, B/GBFPCDCONTCWDNETEWCex.FCOFDFHBFSFRHFWHGCOGIHBHDHWHWRAIR ADMITTANCE VALVEIMBABOVE CEILINGIEABOVE FLOORIWHABOVE FINISHED FLOOR/GRADE L, LAVBELOW FLOOR/GRADEMBHBACKFLOW PREVENTERMSCONDENSATE DRAINMVCONTINUATIONO/HCOLD WATERGDOWNPDEXPANSION TANKPRVELECTRIC WATER COOLERRPEXISTINGS, SANFLOOR CLEANOUTSHFLOOR DRAINSKFREEZEPROOF HOSE BIBBTPFLOOR SINKTYPFREEZEPROOF ROOF HYDRANT URFREEZEPROOF WALL HYDRANT VGRADE CLEANOUTVTRGREASE INTERCEPTORWCHOSE BIBBW.C.HUB DRAINWCOHOT WATERWHAHOT WATER RETURNWMBICE MACHINE BOXINVERT ELEVATIONINSTANTANEOUS WATER HEATERLAVATORY1000 BTU/HRMOP SINKMIXING VALVEOVERHEADNATURAL GASPUMPED DISCHARGEPRESSURE REDUCING VALVERECIRCULATION PUMPSANITARYSHOWERSINKTRAP PRIMERTYPICALURINALVENTVENT THROUGH ROOFWATER CLOSETWATER COLUMNWALL CLEANOUTWATER HAMMER ARRESTERWASHING MACHINE BOXLEGENDSGWFIWPDFWCOLD WATER PIPEHOT WATER PIPEHOT WATER RETURN PIPESANITARY PIPEVENT PIPEGREASE WASTE PIPEFIRE SPRINKLER PIPEINDIRECT WASTE PIPEPUMPED DISCHARGEFILTERED WATER PIPEPIPE UP / PIPE DOWNPIPE TEE FROM TOP / TEE FROM BOTTOMPIPE CAP / PIPE CONTINUATIONDIRECTIONAL FLOW ARROWBALL VALVE / CHECK VALVEMIXING VALVE / PRESSURE REDUCING VALVEBACKFLOW PREVENTER ASSEMBLYWALL HYDRANT / HOSE BIBBFLOOR DRAIN / FLOOR SINKWATER HAMMER ARRESTORGAS COCK / GAS SOLENOID VALVEP-TRAPHUB DRAINTRAP PRIMERFLOOR CLEANOUT / GRADE CLEANOUTVENT THROUGH ROOFPIPE CLEANOUT / WALL CLEANOUTSPECIFICATIONSGENERALALL WORK SHALL COMPLY WITH ALL STATE, CITY AND LOCAL CODES, RULES AND REGULATIONS. CONTRACTOR SHALLSECURE ALL REQUIRED PERMITS AND INSPECTIONS ASSOCIATED WITH THIS WORK, AND SHALL PAY ALL COSTS ANDFEES INVOLVED.ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE BEST RECOGNIZED PRACTICE IN THE FIELD CONCERNED.MANUFACTURED ITEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTEDDIRECTIONS, SPECIFICATIONS AND RECOMMENDATIONS.CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS AND SHALL BE FAMILIAR WITH THE SCOPE ANDREQUIREMENTS OF THIS PROJECT. ANY DISCREPANCIES OR LACK OF CLARITY IN THE DOCUMENTS SHALL BEIDENTIFIED TO THE ARCHITECT OR ENGINEER PRIOR TO THE SUBMISSION OF PRICING BIDS. WITH A SUBMITTED BID,CONTRACTOR IS ACCEPTING THESE DOCUMENTS AS SUFFICIENT DEFINITION OF THE SCOPE OF WORK, AND ANYADDITIONAL COSTS BASED ON UNCLARITY OF CONTRACT DOCUMENTS WILL NOT BE CONSIDERED.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS FOR EQUIPMENT INSTALLATION PRIOR TO THESUBMITTAL OF SHOP DRAWINGS. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED SUCH THAT THEY ARE EASILYACCESSIBLE AND SERVICABLE. THIS EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO: PLUMBING FIXTURES, WATERHEATERS, EXPANSION TANKS, PUMPS, BACKFLOW PREVENTERS, VALVES, MIXING VALVES, THERMOMETERS, GAUGES,TRAP PRIMERS AND CLEANOUTS.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE FULL SET OF CONSTRUCTION DOCUMENTS, INCLUDINGARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL & ELECTRICAL DRAWINGS (AS APPLICABLE) TO ENSURE ALLPLUMBING WORK IS COORDINATED WITH PHYSICAL CONDITIONS AND ALL OTHER TRADES.THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE ARCHITECTURAL DRAWINGS TO ENSURE THERE IS ADEQUATEWALL THICKNESS SUCH THAT ALL PIPING, FIXTURE CARRIERS, WALL CLEANOUTS, WALL BOXES, WALL HYDRANTS ANDACCESS PANELS WILL FIT IN THE WALL SPACE. CONTRACTOR SHALL NOTIFY THE ARCHITECT IF WALL SPACE ISINADEQUATE PRIOR TO COMMENCING WORK.THE CONTRACTOR SHALL OBTAIN EXACT WALL, FIXTURE, AND LAYOUT DIMENSIONS FROM THE ARCHITECTURALDRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ROUGH-IN AND INSTALLATION DRAWINGS FOR ALLPLUMBING FIXTURES, KITCHEN EQUIPMENT AND OWNER FURNISHED EQUIPMENT (AS APPLICABLE), AND SHALLCOORDINATE THE PLUMBING INSTALLATION PRIOR TO COMMENCING THE WORK. THE CONTRACTOR IS RESPONSIBLEFOR PROVIDING AND INSTALLING ALL NECESSARY VALVES, CONNECTIONS, TRAPS, ACCESS PANELS, UNIONS,ESCUTCHEONS, WATER HAMMER ARRESTORS, VACUUM BREAKERS, RELIEF VALVES, PIPE INSULATION, ANDEQUIPMENT SPECIALTY DEVICES AS REQUIRED TO FACILITATE COMPLETE AND OPERATIONAL CONDITIONS WHICH AREIN STRICT COMPLIANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.THESE DRAWINGS ARE DIAGRAMMATIC AND DO NOT REFLECT ALL POSSIBLE PHYSICAL CONDITIONS. REFER TOARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS AND EXACT LOCATIONS OF EQUIPMENT AND FIXTURES. PROVIDENECESSARY PIPING OFFSETS TO COORDINATE WITH THE BUILDING STRUCTURE, WORK OF OTHER TRADES, ANDCONNECTION TO SITE UTILITIES (AS APPLICABLE).COORDINATE THE ELECTRICAL REQUIREMENTS AND CHARACTERISTICS OF ALL PLUMBING EQUIPMENT WITH THEELECTRICAL CONTRACTOR PRIOR TO ISSUING SUBMITTALS OR PURCHASING EQUIPMENT.UNLESS NOTED OTHERWISE, ALL DRAINAGE PIPING SHALL BE SLOPED AT A MINIMUM OF 18" PER FOOT. 2" SANITARYPIPING AND ALL GREASE WASTE PIPING SHALL BE SLOPED AT 14" PER FOOT.DOMESTIC WATER PIPING SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION.PIPING TO BE FLUSHED AND STERILIZED IN ACCORDANCE WITH IPC 610.1 AND ALL APPLICABLE LOCAL AND STATEHEALTH DEPARTMENT STANDARDS.ALL DOMESTIC WATER PIPING, SANITARY P-TRAPS AND GREASE WASTE PIPING SUBJECT TO FREEZING SHALL BEINSULATED AND PROVIDED WITH HEAT TRACE. CONDENSATE PIPING SUBJECT TO FREEZING WITHIN WALK-IN FREEZERSSHALL BE INSULATED AND PROVIDED WITH HEAT TRACE. PIPING INSTALLED IN EXTERIOR WALLS SHALL BE WRAPPED IN1" THICK PIPE INSULATION AND BE LOCATED ON THE INTERIOR SIDE OF THE BUILDING INSULATION. IF INSTALLED INEXTERIOR BLOCK WALLS, INTERSTITIAL SPACES SHALL BE FILLED WITH FOAM INSULATION.IN CONCEALED LOCATIONS WHERE PIPING, OTHER THAN CAST-IRON OR GALVANIZED STEEL, IS INSTALLED THROUGHHOLES OR NOTCHES IN STUDS, JOISTS, OR SIMILAR MEMBERS LESS THAN 112" FROM THE NEAREST EDGE OFMEMBER, PIPE SHALL BE PROTECTED BY STEEL SHIELD PLATES IN ACCORDANCE WITH IPC 305.6.PIPE PENETRATIONS THROUGH FIRE RATED WALLS OR FLOORS SHALL HAVE EQUIVALENTLY RATED SLEEVES AND SHALLBE SEALED AND FIRE CAULKED WITH A U.L. LISTED FIRE STOPPING SYSTEM INSTALLED IN ACCORDANCE WITH THEMANUFACTURER'S LISTED DETAILS AND SPECIFICATIONS.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE REQUIREMENTS OF THE COUNTY HEALTHDEPARTMENT AND OTHER LOCAL AUTHORITIES HAVING JURISDICTION REGARDING CROSS CONNECTION CONTROL OROBTAINING A FOOD SERVICE PERMIT (AS APPLICABLE). REPORT ANY OBSERVED DISCREPANCIES TO THE ARCHITECTOR ENGINEER PRIOR TO COMMENCING WITH THE WORK.CONTRACTOR SHALL CONFIRM PLUMBING FIXTURE FINISHES WITH THE ARCHITECTURAL SCHEDULES & DETAILS (ASAPPLICABLE).PROFICIENT ENGINEERING WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROMFAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND THE DESIGN INTENT THEY CONVEY, OR PROBLEMS WHICHARISE FROM OTHER'S FAILURE TO OBTAIN AND/OR FOLLOW PROFICIENT'S GUIDANCE WITH RESPECT TO ANY ERRORS,OMISSIONS, INCONSISTENCIES, AMBIGUITIES OR CONFLICTS WHICH ARE ALLEGED. THE DRAWINGS ARE GENERALLYDIAGRAMMATIC IN NATURE.SUBMITTALSFURNISH SHOP DRAWINGS FOR MANUFACTURED PRODUCTS. ALL ITEMS SHALL BE CLEARLY MARKED TO MATCHEQUIPMENT MARKS ON THE PLUMBING DRAWINGS. ALL OPTIONS MUST BE CLEARLY MARKED ON THE SUBMITTALSHEET. A MODEL NUMBER LISTING ON A COVER SHEET IS NOT AN ACCEPTABLE SUBSTITUTE FOR MARKING THEACTUAL SUBMITTAL SHEET. ELECTRICAL DATA FOR POWERED EQUIPMENT MUST BE INDICATED ON THE SUBMITTALSHEET FOR THAT ITEM.SUBMITTAL REVIEW IS CONSIDERED A GENERAL ACCEPTANCE OF THE BASIC APPLICABILITY OF THE EQUIPMENT.CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND/OR ALTERNATE ARRANGEMENT OF THE EQUIPMENT WITHINA GIVEN SPACE. WHEN SUBSTITUTED EQUIPMENT IS INSTALLED, CONTRACTOR SHALL BE RESPONSIBLE FOR ANYCOORDINATION OR ADDITIONAL COST BROUGHT ON BY THE USE OF THIS EQUIPMENT.HANGERS AND SUPPORTSHANGERS SHALL BE COMPLETE WITH RODS AND SUPPORTS PROPORTIONED TO THE SIZE OF PIPE TO BE SUPPORTED,IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.SIZE HANGERS FOR INSULATED PIPING TO BEAR ON OUTSIDE OF INSULATION. PROVIDE INSULATION PROTECTORS ATHANGERS BEARING ON THE OUTSIDE OF INSULATION. PROVIDE A RIGID INSERT OR RIGID INSULATION AT EACHINSULATION PROTECTOR.WHERE SEVERAL PIPES 212" AND SMALLER RUN PARALLEL AND IN THE SAME PLANE, THEY MAY BE SUPPORTED ONGANG OR MULTIPLE HANGERS. LARGER PIPING SHALL BE INDEPENDENTLY HUNG, RUN PARALLEL AND BE EQUALLYSPACED.PIPING SHALL BE SUPPORTED IN ACCORDANCE WITH IPC SECTION 308, AND SPACING OF HANGERS SHALL NOTEXCEED THE LIMITS SET FORTH IN TABLE 308.5. PIPES SHALL BE SUPPORTED WITHIN 1'-0" OF EACH ELBOW.VERTICAL PIPE SUBJECT TO MOVEMENT SHALL BE SUPPORTED FROM THE WALL BY MEANS OF A PIPE CLAMP.SUPPORT DOMESTIC WATER PIPING IN SPACES BEHIND PLUMBING FIXTURES BY BRACKETS AND U-BOLTS SECURED TOWASTE AND VENT STACKS. SIZE U-BOLTS TO BEAR ON THE PIPING.AFTER HANGER RODS ARE INSTALLED IN FINISHED CONCRETE CEILING, FILL THE REMAINING OPENING WITH CEMENT SOTHAT NO HOLE SHOWS AT THE CEILING.WHERE COPPER PIPING IS USED, NONFERROUS METAL SUPPORT(S) OR PROPER ISOLATION BETWEEN DISSIMILARMATERIALS SHALL BE PROVIDED.PIPE HANGERS AND SUPPORTS SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH RECOMMENDATIONS SETFORTH IN MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICES NO. SP-69 AND SP-58.SPECIFICATIONSDOMESTIC WATER SYSTEMS AND ACCESSORIESTHE PRIMARY SPECIFICATION FOR DOMESTIC WATER PIPING SHALL BE AS FOLLOWS: WATER PIPING ABOVE FLOOR: TYPE 'L' HARDDRAWN COPPER TUBING, ASTM B88, WROUGHT SOLDER JOINTS, ANSI B16.22. WATER PIPING BELOW FLOOR: TYPE 'K SOFT DRAWNCOPPER TUBING, WITH NO JOINTS BELOW SLAB, ASTM B88.AS AN ALTERNATE TO THE PRIMARY SPECIFICATION FOR WATER PIPING, THE FOLLOWING MAY BE USED IN WHOLE OR IN PART. THEPLUMBING CONTRACTOR SHALL LIST EACH SYSTEM AS A SEPARATE LINE ITEM AS AN ALTERNATE FOR THE OWNER'S SELECTION. USEOF ANY ALTERNATE SHALL BE AT THE SOLE DISCRETION OF THE OWNER. SERVICE PIPING BELOW GRADE: CPVC (CHLORINATEDPOLYVINYL CHLORIDE) SCHEDULE 40 WHEN APPROVED BY THE AUTHORITY HAVING JURISDICTION. SHALL MEET ASTM D2846 ANDASTM F 441. HOT AND COLD WATER PIPING ABOVE FLOOR: CPVC (CHLORINATED POLYVINYL CHLORIDE) SCHEDULE 40 WITH SOLVENTWELD JOINTS WHEN APPROVED BY THE AUTHORITY HAVING JURISDICTION. PIPING SHALL MEET ASTM D 2848 AND SHALL BECERTIFIED BY THE NSF INTERNATIONAL FOR USE WITH POTABLE WATER SYSTEMS. SOLVENT CEMENTS FOR CPVC PLASTIC PIPINGSHALL MEET ASTM F437, ASTM F438 AND ASTM F439. WATER PIPING ABOVE FLOOR: CROSS-LINKED POLYETHYLENE (PEX) TUBING,SHALL COMPLY WITH ASTM F 876, ASTM F 877; CSA B137.5. HOT AND COLD WATER PIPING ABOVE FLOOR: CROSS-LINKEDPOLYETHYLENE (PEX) TUBING, SHALL COMPLY WITH ASTM F 876, ASTM F 877; CSA B137.5.ALL DOMESTIC HOT WATER PIPING SHALL HAVE A MINIMUM PRESSURE RATING OF 100PSI AT 180°F.DOMESTIC WATER PIPING SHALL BE TESTED IN ACCORDANCE WITH ALL GOVERNING CODES. PIPING SHALL BE PURGED OFDELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. PIPING TO BE FLUSHED AND STERILIZED IN ACCORDANCE WITH IPC610.1 AND ALL APPLICABLE LOCAL AND STATE HEALTH DEPARTMENT STANDARDS.BALL VALVES SHALL BE TWO-PIECE BRONZE BODY, LARGE PORT WITH SOLID, SMOOTH BORE CHROME PLATED BRASS BALL. SEATSSHALL BE REINFORCED TFE WITH TEFLON PACKING RING AND THREADED ADJUSTABLE PACKING NUT. PROVIDE STEM EXTENSION ASNEEDED TO PROVIDE HANDLE ON OUTSIDE OF PIPE INSULATION. VALVES SHALL BE APOLLO 70 OR EQUAL.BACKFLOW PREVENTERS SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS FOR EASE OF TESTING AND SERVICING. FOR BACKFLOWPREVENTERS WITH VENT CONNECTIONS, ROUTE VENT LINE TO NEAREST DRAIN AND DISCHARGE WITH AIR GAP. BACKFLOWPREVENTERS SHALL BE TESTED IN ACCORDANCE WITH IPC 312.10.2. CONTRACTOR SHALL PROVIDE CERTIFICATIONS THAT STATEDEVICES HAVE BEEN TESTED AND APPROVED.THERMOMETERS SHALL BE 9" ADJUSTABLE ANGLE, 30°-180°F RANGE (TRERICE BX9 OR EQUAL). PRESSURE GAUGES SHALL BE 412"DIAL SIZE, 0-160PSI (TRERICE 600CB OR EQUAL).CONTRACTOR SHALL FIELD VERIFY INCOMING DOMESTIC WATER PRESSURE TO CONFIRM ADEQUATE PRESSURE TO SERVE THEDOMESTIC WATER SYSTEM. CONTRACTOR SHALL ALERT ENGINEER TO A POTENTIAL LOW PRESSURE CONDITION. WHERE PRESSUREEXCEEDS 80PSI, PROVIDE PRESSURE REGULATING VALVE (WATTS LF223) AND UPSTREAM STRAINER (WATTS LSF777).CONTRACTOR SHALL FIELD COORDINATE LOCATION OF ACCESSIBLE ISOLATION VALVES ON DOMESTIC HOT & COLD WATER SUPPLIESTO FIXTURES OR GROUPS OF FIXTURES SUCH THAT THEY MAY BE SHUT OFF FOR SERVICING. SERVICE AND HOSE BIBB VALVES SHALLBE IDENTIFIED. ALL OTHER VALVES INSTALLED IN LOCATIONS THAT ARE NOT ADJACENT TO THE FIXTURE(S) SHALL BE IDENTIFIED,INDICATING THE FIXTURE(S) SERVED.RETURN AIR PLENUMSALL EXPOSED MATERIALS WITHIN RETURN AIR PLENUMS SHALL BE NONCOMBUSTIBLE OR HAVE A FLAME SPREAD INDEX OF NOT MORETHAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50, AS DETERMINED IN ACCORDANCE WITH ASTM E84/UL723.COPPER AND CAST IRON PIPING IS APPROVED. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL RETURN AIR PLENUMLOCATIONS WITH THE MECHANICAL CONTRACTOR.INSULATIONINSULATE ALL DOMESTIC HOT WATER AND HOT WATER RECIRCULATION PIPING IN ACCORDANCE WITH IECC TABLE C403.2.10. PIPE UPTO 114": 1" THICK INSULATION. PIPE 112" OR LARGER: 112" THICK INSULATIONINSULATE ALL HORIZONTAL COLD WATER PIPING LOCATED ABOVE CEILING, VERTICAL PIPING LOCATED IN AN EXTERIOR WALL, EXPOSEDPIPING (I.E. MECH ROOMS). PIPE UP TO 1": 12" THICK. PIPING 114" AND OVER: 1" THICK INSULATION. ALL WATER AND DRAINAGE PIPINGINSTALLED IN EXTERIOR WALLS SHALL BE WRAPPED IN 1" THICK PIPE INSULATION AND BE LOCATED ON THE INTERIOR SIDE OF THEBUILDING INSULATION. IF INSTALLED IN EXTERIOR BLOCK WALLS, INTERSTITIAL SPACES SHALL BE FILLED WITH FOAM INSULATION.ALL JOINTS SHALL BE SEALED WITH MATCHING VAPOR BARRIER TAPE.INSULATION SHALL HAVE A K-FACTOR (AVERAGE THERMAL CONDUCTIVITY) NOT TO EXCEED 0.27 BTU-IN/HR x SQFT x °F.PROTECTION OF PIPINGPIPING PASSING UNDER FOOTINGS OR THROUGH FOUNDATION WALLS SHALL BE PROVIDED WITH A SLEEVE TWO PIPE SIZES LARGERTHAN THE PIPE. OPEN ENDS OF SLEEVES SHALL BE SEALED. PIPING PASSING THROUGH CONCRETE OR CINDER WALLS AND FLOORSOR OTHER CORROSIVE MATERIAL SHALL BE PROTECTED IN ACCORDANCE WITH IPC 305.1. ALL PIPING INSTALLED THROUGH HOLES ORNOTCHES IN STUDS, JOISTS, RAFTERS OR SIMILAR MEMBERS SHALL BE PROTECTED BY STEEL SHIELD PLATES IN ACCORDANCE WITHIPC 305.6. VERTICAL STACKS IN WOOD CONSTRUCTION SHALL BE PROTECTED FROM BUILDING SETTLING WITHCOMPRESSION/EXPANSION FITTINGS AND PIPE CLAMPS INSTALLED PER MANUFACTURER'S RECOMMENDATIONS (FERNCO XJ SERIES OREQUAL).SLEEVES AND PENETRATIONSSLEEVES SHALL BE PROVIDED WHERE PIPES PASS THROUGH WALLS, FLOORS AND ROOFS.PROVIDE STANDARD WEIGHT STEEL SLEEVES IN CONCRETE AND MASONRY CONSTRUCTION, PROVIDE 26GA GALVANIZED SHEET METALSLEEVES IN INTERIOR DRYWALL CONSTRUCTION. SLEEVES SHALL BE THE FULL THICKNESS OF WALLS AND SHALL ALLOW FOR THE FULLTHICKNESS OF PIPE INSULATION, WHERE APPLICABLE.SLEEVES MAY BE OMITTED WHEN OPENINGS ARE CORE DRILLED FOR CONCEALED VERTICAL AND HORIZONTAL PIPING. SLEEVES ARENOT REQUIRED AT INDIVIDUAL PLUMBING FIXTURES OR IN CONCRETE FLOOR SLABS ON GRADE, UNLESS OTHERWISE NOTED.SLEEVES FOR ALL PIPING PENETRATING FIRE RATED WALLS AND FLOORS SHALL BE PROVIDED WITH 3M PIPE BARRIER NO. CP-25 FIREPROOFING CAULKING, OR EQUAL, IN ANNULAR SPACE BETWEEN SLEEVE AND PIPING. CONTRACTOR SHALL VERIFY THE RATING OF THEWALL AND CONFIRM THE PENETRATION PROTECTION PROVIDED MEETS THAT RATING.PENETRATIONS THROUGH OUTSIDE WALLS SHALL BE WATERTIGHT. CAULK BETWEEN PLUMBING PIPE AND SLEEVE. PACK WITHFIBERGLASS AND CAULK, 1" DEEP AT EACH FACE WITH NON-HARDENING SEALANT BETWEEN PIPE AND SLEEVE.IN EXTERIOR WALLS AND BEARING PARTITIONS, WOOD STUDS ARE PERMITTED TO BE CUT OR NOTCHED TO A DEPTH NOT EXCEEDING25 PERCENT OF THE WIDTH OF THE STUD. CUTTING OR NOTCHING OF STUDS TO A DEPTH NOT GREATER THAN 40 PERCENT OF THEWIDTH OF THE STUD IS PERMITTED IN NONBEARING PARTITIONS NOT SUPPORTING LOADS OTHER THAN THE WEIGHT OF THE PARTITION.BORED HOLES NOT GREATER THAN 40 PERCENT OF THE STUD WIDTH ARE PERMITTED TO BE BORED IN ANY WOOD STUD. BOREDHOLES NOT GREATER THAN 60 PERCENT OF THE STUD WIDTH ARE PERMITTED IN NONBEARING PARTITIONS IN ANY WALL WHERE EACHBORED STUD IS DOUBLED, PROVIDED THAT NOT MORE THAN TWO SUCH SUCCESIVE DOUBLED STUDS ARE SO BORED. THE EDGE OFA BORED HOLE SHALL NOT BE NEARER THAN 58 INCH (15.9 mm) TO THE EDGE OF THE STUD. BORED HOLES SHALL NOT BE LOCATED ATTHE SAME SECTION OF STUD AS A CUT OR NOTCH.WASTE AND VENT PIPING SYSTEMS AND ACCESSORIESSANITARY PIPING SHALL BE PVC SCHEDULE 40 SOLID WALL PIPE AND DWV FITTING SYSTEM.PIPE AND FITTINGS SHALL BE MANUFACTURED FROM PVC COMPOUND WITH A CELL CLASS OF 12454 PER ASTM D-1784 ANDCONFORM WITH NATIONAL SANITATION FOUNDATION (NSF) STANDARD 14. PIPE SHALL BE IRON PIPE SIZE (IPS) CONFORMING TOASTM D-1785 AND ASTM D-2665. INJECTION MOLDED FITTINGS SHALL CONFORM TO ASTM D-2665. FABRICATED FITTINGS SHALLCONFORM TO ASTM F-1866. SOLVENT CEMENTS SHALL CONFORM TO ASTM D-2564. PRIMER SHALL CONFORM TO ASTM F-656.BURIED PIPE SHALL CONFORM TO ASTM D-2321.WASTE AND VENT PIPING SHALL BE TESTED IN ACCORDANCE WITH THE GOVERNING CODES. AT A MINIMUM, WASTE PIPING SHALL BETESTED WITH AT LEAST 10 FOOT OF WATER HEAD PRESSURE APPLIED.ALL VENTS THROUGH ROOF SHALL BE LOCATED AT LEAST 10'-0" AWAY FROM ANY AIR INTAKE, EVAPORATIVE COOLER, OR ANY OTHERDEVICE THAT WOULD DRAW AIR FROM THE VENT. FLASH AROUND ALL PIPES PENETRATING THROUGH ROOF WITH STANDARDMANUFACTURED FLASHINGS. FLASHING SHALL BE SHEET METAL WITH RUBBER GASKETS AND SHALL EXTEND INTO ROOFING AND UPPIPE DISTANCES IN ACCORDANCE WITH THE LOCAL CODE.NO DOUBLE COMBINATION FITTINGS MAY BE UTILIZED IN THE HORIZONTAL.WHERE TWO HORIZONTAL PIPES (BACK-TO-BACK WATER CLOSETS OR TWO SANITARY BRANCHES) COMBINE IN THE VERTICAL, ADOUBLE COMBINATION WYE EIGHTH BEND FITTING SHALL BE INSTALLED. DOUBLE SANITARY TEE OR SANITARY CROSS IS NOTACCEPTABLE.WHERE DRAWINGS REQUIRE CONNECTION TO EXISTING SANITARY SEWER PIPING IN BUILDING, IT IS THE CONTRACTOR'S RESPONSIBILITYTO FIELD DETERMINE EXACT LOCATION, DEPTH AND DIRECTION OF FLOW PRIOR TO COMMENCING WORK. CONTRACTOR SHALL ALERTARCHITECT/ENGINEER IF THERE IS A POTENTIAL ISSUE MAINTAINING PROPER SLOPE IN CONNECTING TO EXISTING, OR IF THERE IS AMORE DIRECT CONNECTION POSSIBLE. CONTRACTOR SHALL CONFIRM THAT ANY EXISTING PIPING TO BE REUSED IS CLEAN, FREE OFDEFECTS, ADEQUATELY SLOPED (18"/FT MINIMUM) AND THAT THERE ARE NO DIPS THAT COULD HOLD WATER. PROVIDE CAMERASCOPING TO DOCUMENT THIS INFORMATION. CONTRACTOR SHALL ALERT ARCHITECT/ENGINEER OF ANY DEFICIENCIES.3150 Holcomb Bridge RoadNorcross, Georgia 30071404.330.9798PROJECT # 125297SOGOARCHITECTURE & INTERIORSATLANTA, GA TEL 678.271.8054 STUDIOSOGO.COMISSUANCE SCHEDULE06.27.25 PERMITREVISION SCHEDULEMARK DATEDESCRIPTIONProject IDDrawn ByChecked BySheet Title2428PGMRGENERALDrawingNo.P-0.1Paper Size:24" x 36"INDIRECT WASTE DETAILNO SCALESLOPE INDIRECTWASTE PIPING @ 14"/FTMINIMUMDISCHARGE INTOFLOOR SINK W/AIR GAP(GAP TO BE TWICE THEDIAMETER OF PIPE ANDNOT LESS THAN 2").PROVIDE CHAMFER ATPIPE END.PROVIDE 12OR34GRATE ON FLOORSINK, BASED ONNUMBER OF INDIRECTWASTE LINES.INDIRECT WASTE FROMPLUMBING FIXTURE(RUN FULL SIZE OFUNIT CONNECTIONSUPPORTHORIZONTAL PIPINGFROM FLOOR WITHPIPE STANDFLOOR SINK OR HUBDRAIN (REFER TOPLANS FOR REQUIREDDRAIN TYPE)INDIRECT WASTE PIPING THAT DRAINS ICE MAKERS OR CONDENSATE FROM ANYAIR CONDITIONING OR REFRIGERATION EQUIPMENT SHALL BE INSULATEDPOINT OF USE MIXING VALVENO SCALE110°HW OUTLET38" COMPRESSIONFITTING (TYP)MIXING VALVE (SEEPLUMBING FIXTURESCHEDULE)38" FAUCETCONNECTIONSKEYNOTES1 3" P-TRAP AT BASE OF TRENCH DRAIN.2 112" CW & 34" HW A/C & CONNECT NEW DISTRIBUTION TO EXISTING HOT &COLD WATER SUPPLIES IN THIS AREA, FIELD VERIFY SIZES AND EXACTLOCATIONS.3 2" V DN.4 4" S B/F & CONNECT TO EXISTING SANITARY PIPING IN BUILDING. FIELDVERIFY EXACT LOCATION, DEPTH AND DIRECTION OF FLOW PRIOR TOCOMMENCING WORK.5 2" V A/C & CONNECT TO EXISTING VENT PIPING. FIELD VERIFY EXACTLOCATION PRIOR TO COMMENCING WORK.6 3" FLOOR SINK FS-1. DISCHARGE ALL NEARBY INDIRECT WASTECONNECTIONS FULL SIZE W/AIR GAP AT LEAST TWICE THE DIAMETER OFINDIRECT WASTE PIPE (SEE DETAIL). FIELD COORDINATE WITHINSTALLED EQUIPMENT.7 2" VENT TO AIR ADMITTANCE VALVE AAV-1 UNDER COUNTER.8 12" CW & 12" 140°HW TO FIXTURE.9 12" CW & 12" 140°HW TO FIXTURE, PROVIDE MIXING VALVE MV-1 TOTEMPER HW TO 110°.10 12" CW & 12" HW UP FROM B/F. 12" CW & 12" 140°HW TO FIXTURE,PROVIDE MIXING VALVE MV-1 TO TEMPER HW TO 110°.11 12" CW TO WSB-1, PROVIDE IN-LINE BACKFLOW PREVENTER (WATTS'SD3,' ASSE 1022).12 12" CW & 12" HW DN & B/F.13 12" CW & 12" HW DN.14 114" CW DN TO WATER CLOSET, PROVIDE WHA-A AT BASE OF DROP.GENERAL NOTESCONTRACTOR TO ENSURE 140° SETPOINT FOR EXISTING WATER HEATER.CONTRACTOR TO ENSURE THERMOSTATIC MIXING VALVES ARE PROVIDED TOLAVATORIES AND HAND WASHING SINKS TO TEMPER HOT WATER DOWN TO110°.HW INLETCW INLETWALL SUPPLIESWITH ANGLE STOPS12x24 (304.8 x 609.6)1012" CW & 12" HW B/F11ICE9FRIDGE12"12"1212" 12"12"12"814WC-114WC-1114"3 4"L-1112"114"L-13 4"213 13112"2 1/4" = 1'-0" FIRST FLOOR PLAN - SUPPLY3150 Holcomb Bridge RoadNorcross, Georgia 30071404.330.9798PROJECT # 125297SOGOARCHITECTURE & INTERIORSATLANTA, GA TEL 678.271.8054 STUDIOSOGO.COMWASTE/VENT ISOMETRICNO SCALESK FSAAV3" FCO3"FD4"2"2"FS3"3"4"SKFS2"S4"3"4" 3"2" 2"FD4"3"FS3"4"LAV2"2"FD4"2" 3" S3" 3"WC4"2"4"2"4"2"2"WCLAVFD 4" 4"2" 3" 4"3"3" 4"6FCO12x24 (304.8 x 609.6)76FD-231SICETD-1FRIDGEFD-263WC-1SFD-1L-1WC-1FD-1L-135431 1/4" = 1'-0" FIRST FLOOR PLAN - DRAINAGE0' 2' 4'N8'12'ISSUANCE SCHEDULE06.27.25 PERMITREVISION SCHEDULEMARK DATEDESCRIPTIONProject IDDrawn ByChecked BySheet Title2428PGMRFLOOR PLANSDrawingNo.P-1.0Paper Size:24" x 36"SPECIFICATIONSGENERAL NOTES:REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF ALL CEILINGMOUNTED EQUIPMENT.ALL DUCT DIMENSIONS INDICATED IN THESE DOCUMENTS ARE INSIDE-CLEAR DIMENSIONS.PORTIONS OF DUCTWORK OR PIPING VISIBLE THROUGH GRILLES AND REGISTERS IN FINISHEDAREAS SHALL BE PAINTED FLAT BLACK. PAINT BLACK BEHIND ALL GRILLES.ALL WIRING IN THE CEILING PLENUM SHALL BE PLENUM RATED CABLE.MOUNTING FRAME OF CEILING MOUNTED AIR DISTRIBUTION DEVICES SHALL BE COMPATIBLEWITH CEILING TYPE. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPE.ALL FIRE SEPARATIONS MUST BE PROTECTED WHEN APPLICABLE.PROVIDE NEW FILTERS (MERV 7 OR BETTER PER OWNER) FOR ALL APPLICABLE HVACEQUIPMENT AT THE END OF CONSTRUCTION.ALL MATERIAL IN PLENUM MUST MEET FIRE AND SMOKE SPREAD AS REQUIRED BY NFPA 90A.ALL ROOF PENETRATIONS TO BE 12" APART AND AT LEAST 12" AWAY FROM CURBS, WALLS,AND DRAIN SUMPS TO PROVIDE ROOFING CONTRACTOR WITH SUFFICIENT ACCESS FORFLASHING EACH ROOF PENETRATION.SUBSTITUTIONS MUST BE APPROVED IN WRITING BY ARCHITECT PRIOR TO BID SUBMISSION.CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS AND SHALL BE FAMILIAR WITH THESCOPE AND REQUIREMENTS OF THIS PROJECT. ANY DISCREPANCIES OR LACK OF CLARITY INTHE DOCUMENTS SHALL BE IDENTIFIED TO THE ARCHITECT OR ENGINEER PRIOR TO THESUBMISSION OF PRICING BIDS. WITH A SUBMITTED BID, CONTRACTOR IS ACCEPTING THESEDOCUMENTS AS SUFFICIENT DEFINITION OF THE SCOPE OF WORK, AND ANY ADDITIONALCOSTS BASED ON UNCLARITY OF CONTRACT DOCUMENTS WILL NOT BE CONSIDERED.THE CONTRACTOR SHALL REFERENCE THE FULL SET OF CONSTRUCTION DOCUMENTS DURINGPRICING AND CONSTRUCTION FOR COORDINATION BETWEEN DISCIPLINES RELATIVE TO THEMECHANICAL SCOPE.GUARANTEE:GUARANTEE THAT EACH PIECE OF APPARATUS SHALL BE OF THE CUSTOMARY STANDARD ANDQUALITY FURNISHED BY THE DESIGNED MANUFACTURER FOR THAT CATALOG NUMBER.GUARANTEE THAT THE AIR SYSTEMS SHALL OPERATE WITHOUT AERODYNAMIC NOISEGENERATED FROM THE FAULTY INSTALLATION OF DUCT WORK OR ANY COMPONENT OF THEAIR DISTRIBUTION SYSTEM.GUARANTEE THAT ALL SYSTEMS AND COMPONENTS SHALL BE PROVIDED WITH A ONE YEARWARRANTY FROM THE TIME OF DATE OF SUBSTANTIAL COMPLETION. THE WARRANTY SHALLCOVER ALL MATERIALS AND WORKMANSHIP. DURING THIS WARRANTY PERIOD, ALL DEFECTS INMATERIALS AND WORKMANSHIP SHALL BE CORRECTED BY REPAIR OR REPLACEMENT WITHOUTINCURRING ADDITIONS TO THE CONTRACT.EXISTING CONDITIONS:CONTRACTOR SHALL VISIT THE SITE AND UNDERSTAND JOB CONDITIONS BEFORE SUBMITTINGA PROPOSAL. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY LOCATIONS ANDSIZES OF ALL EXISTING UTILITY SERVICES PRIOR TO SUBMITTING HIS PROPOSAL. NOCONSIDERATION WILL BE GIVEN TO CLAIMS FOR EXTRA COST ARISING FROM CONTRACTOR'SFAILURE TO BE FULLY COGNIZANT OF JOB OR SITE CONDITIONS EXISTING AT TIME OFACCEPTANCE OF BID.ACTIVE SERVICES: WHEN ENCOUNTERED IN WORK, PROTECT, BRACE, SUPPORT EXISTINGACTIVE SEWERS, GAS AND OTHER SERVICES REQUIRED FOR PROPER EXECUTION OF WORK. IFEXISTING ACTIVE SERVICES ARE ENCOUNTERED THAT REQUIRE RELOCATION, RELOCATE ASAPPROVED. DO NOT PREVENT OR DISTURB OPERATION OF ACTIVE SERVICES THAT ARE TOREMAIN.INACTIVE SERVICES: WHEN ENCOUNTERED IN WORK, REMOVE, CAP OR PLUG INACTIVESERVICES, AS INDICATED.INTERRUPTION OF SERVICES: WHERE WORK MAKES TEMPORARY SHUT-DOWNS OF SERVICESUNAVOIDABLE, SHUT DOWN AT NIGHT, OR AT SUCH TIMES AS APPROVED BY OWNER, WHICHWILL CAUSE LEAST INTERFERENCE WITH ESTABLISHED OPERATING ROUTINE. ARRANGE WORKTO ASSURE THAT SERVICES WILL BE SHUT DOWN ONLY DURING TIME ACTUALLY REQUIRED TOMAKE NECESSARY CONNECTION TO EXISTING WORK.WHERE EXISTING WALLS, CEILINGS, FLOORS, ETC., ARE CUT OR OTHERWISE DAMAGED DURINGCONSTRUCTION, REPAIR ALL SURFACES TO THEIR ORIGINAL CONDITION.TEST AND BALANCE:TEST AND BALANCE (TAB) CONTRACTOR SHALL HOLD A CURRENT NATIONAL BALANCINGCOUNCIL (NBC) CERTIFICATION AND POSSESS ACCURATE AND CALIBRATED INSTRUMENTS.TAB WORK AND REPORTS SHALL BE PER NBC PRACTICAL STANDARDS, PROCEDURES ANDFORMS. ACCEPTIBLE ALTERNATIVE TAB FIRM CERTIFICATIONS/PROCEDURES: NEBB, AABC, ORTABB.PRIOR TO COMMENCEMENT OF THE TAB WORK, THE MECHANICAL SYSTEMS ARE TO BESTARTED AND FULLY FUNCTIONING. A CHECKLIST PRIOR TAB WORK IS TO BE SENT TO THEINSTALLING CONTRACTOR AND RETURNED ATTESTING TO THE READINESS OF THE SYSTEMSFOR BALANCING.PREFERRED TAB FIRM: P-TAB.COMCEILING FAN:CEILING MOUNTED EXHAUST FANS SHALL BE OF THE CENTRIFUGAL DIRECT DRIVE TYPE. THEFAN HOUSING SHALL BE CONSTRUCTED OF STEEL. THE PLASTIC DUCT COLLAR SHALL BE ATAPERED SLEEVE FOR EASE OF CONNECTION TO 3 IN AND 4 IN ROUND DUCTWORK AND SHALLINCLUDE A BACKDRAFT DAMPER. THE GRILLE SHALL BE CONSTRUCTED OF NON-YELLOWINGHIGH STRENGTH POLYMER AND ATTACHED TO THE HOUSING WITH TORSION SPRINGS. THEWHEELS SHALL BE CONSTRUCTED OF HIGH STRENGTH POLYMER. THE ACCESS FOR WIRINGSHALL BE EXTERNAL. THE MOTOR DISCONNECT SHALL BE INTERNAL AND OF THE PLUG IN TYPE.ALL FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEALS FOR SOUND AND AIRPERFORMANCE AND SHALL BE U.L. LISTED.SPECIFICATIONSDUCTWORK AND ACCESSORIES:INDUSTRY STANDARDS: COMPLY WITH SMACNA (SHEET METAL AND AIR CONDITIONINGCONTRACTORS' NATIONAL ASSOCIATION) HVAC DUCT CONSTRUCTION STANDARDS,RECOMMENDATIONS FOR FABRICATION, GAUGES, CONSTRUCTION AND DETAILS, ANDINSTALLATION PROCEDURES, EXCEPT AS OTHERWISE INDICATED.COMPLY WITH ASHRAE (AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIRCONDITIONING ENGINEERS) FUNDAMENTALS HANDBOOK RECOMMENDATIONS, EXCEPT ASOTHERWISE INDICATED.DUCTWORK METAL AND GAUGES: EXCEPT AS OTHERWISE INDICATED, FABRICATE DUCTWORKFROM GALVANIZED SHEET STEEL COMPLYING WITH ASTM A527, LOCKFORMING QUALITY, WITHASTM A525 G90 ZINC COATING, MILL PHOSPHATIZED. GAUGES TO COMPLY WITH SMACNASTANDARDS.DUCT SEALANT: NON-HARDENING, NON-MIGRATING MASTIC OR LIQUID ELASTIC SEALANT (TYPEAPPLICABLE FOR THE FABRICATION/INSTALLATION DETAIL) AS COMPOUNDED ANDRECOMMENDED BY THE MANUFACTURER SPECIFICALLY FOR SEALING JOINTS AND SEAMS INDUCTWORK.DUCTWORK SUPPORT MATERIALS: EXCEPT AS OTHERWISE INDICATED, PROVIDE UPPERATTACHMENT, HANGERS OF GALVANIZED STEEL STRAPS, OR STEEL RODS AND LOWERATTACHMENT FOR SUPPORT OF DUCTWORK. HANGING/SUPPORT SYSTEMS SHALL BE INACCORDANCE WITH SMACNA REQUIREMENTS.EXPOSED DUCTWORK SHALL BE DOUBLE-WALL SPIRAL PIPE WITH PAINT GRIP UNLESSOTHERWISE NOTED OR SUBSTITUTION APPROVED BY OWNER.VOLUNTARY ALTERNATE EXPOSED DUCTWORK SHALL BE SINGLE-WALL SPIRAL PIPE UNLESSOTHERWISE NOTED OR SUBSTITUTION APPROVED BY OWNER. ALL EXPOSED DUCTWORKSHALL BE LINED IN LIEU OF WRAPPED. DUCT LINER THERMAL RESISTANCE SHALL MEET THEMINIMUM VALUES SPECIFIED IN PARAGRAPH 'DUCT INSULATION' BELOW.DUCTWORK LOCATED OUTSIDE OF THE BUILDING ENVELOPE SHALL BE THERMADUCTPRODUCTS OR COVERED WITH 3M VENTURECLAD JACKETING, OR EQUAL PRODUCT, ANDSEALED WEATHER-TIGHT.DUCT INSULATION:R-6 SUPPLY, OUTSIDE AND RETURN AIR DUCT INSULATION IN CONDITIONED ANDUNCONDITIONED SPACESR-8 SUPPLY AND RETURN AIR DUCT INSULATION OUTSIDE THE BUILDINGR-8 INSULATION BETWEEN DUCTS AND THE BUILDING EXTERIOR WHEN DUCTS ARE PART OF ABUILDING ASSEMBLYDIFFUSERS, GRILLES, & REGISTERS:EGGCRATE GRILLE:RETURN GRILLES SHALL BE TITUS MODEL 50F FOR THE SIZES AND MOUNTING TYPES ASSHOWN ON THE PLANS AND OUTLET SCHEDULE. RETURN GRILLES MUST PROVIDE A FREE AREAOF AT LEAST 90%. OUTER BORDERS SHALL BE CONSTRUCTED OF HEAVY EXTRUDEDALUMINUM WITH A THICKNESS OF 0.040-0.050 INCH AND SHALL HAVE COUNTERSUNKSCREW HOLES FOR A NEAT APPEARANCE. BORDER WIDTH SHALL BE 1¼ INCHES ON ALL SIDESAND SHALL BE INTERLOCKED AT THE FOUR CORNERS AND MECHANICALLY STAKED TO FORM ARIGID FRAME. CHOICE OF THREE SIZES OF ALUMINUM GRID: ½ X ½ X ½ INCH, ½ X ½ X 1INCH, OR 1 X 1 X 1 INCH SHALL BE AVAILABLE.OPTIONAL OPPOSED-BLADE VOLUME DAMPER SHALL BE CONSTRUCTED OF HEAVY GAUGESTEEL OR ALUMINUM. DAMPER MUST BE OPERABLE FROM THE FACE OF THE GRILLE.SLOT AND LINEAR DIFFUSERS:DIFFUSERS SHALL BE OF THE SIZES AND MOUNTING TYPES SHOWN ON THE PLANS ANDOUTLET SCHEDULE. DIFFUSERS SHALL HAVE 3/4-,1-, OR 1 1/2-INCH SLOT WIDTH WITH 1 TO 4PARALLEL SLOTS, AS SHOWN ON THE PLANS AND OUTLET SCHEDULE. LENGTH SHALL BE ASSHOWN ON THE PLANS AND OUTLET SCHEDULE. DIFFUSERS SHALL BE CONSTRUCTED OF24-GAUGE STEEL OR 0.040 ALUMINUM.EACH DIFFUSER SHALL HAVE A PATTERN CONTROLLER WITH TIGHT SEALING GASKET EDGE ANDPROVIDES FULL HORIZONTAL FLOW. THE PATTERN CONTROLLER MUST BE FIELD ADJUSTABLEFROM THE FACE OF THE DIFFUSER TO CHANGE THE DISCHARGE PATTERN FROM HORIZONTALTO VERTICAL.THE FINISH SHALL BE #26 WHITE. THE FINISH SHALL BE AN ANODIC ACRYLIC PAINT, BAKED AT315°F FOR 30 MINUTES. THE PENCIL HARDNESS MUST BE HB TO H. THE PAINT MUST PASS A100-HOUR ASTM B117 CORROSIVE ENVIRONMENTS SALT SPRAY TEST WITHOUT CREEPAGE,BLISTERING OR DETERIORATION OF FILM. THE PAINT MUST PASS A 250-HOUR ASTM D870WATER IMMERSION TEST. THE PAINT MUST ALSO PASS THE ASTM D2794 REVERSE IMPACTCRACKING TEST WITH A 50-INCH POUND FORCE APPLIED.OPTIONAL DAMPER SHALL BE CONSTRUCTED OF HEAVY GAUGE STEEL. DAMPER MUST BEOPERABLE FROM THE FACE OF THE DIFFUSER.OPTIONAL MOLDED INSULATION BLANKET SHALL BE AVAILABLE. THE INSULATION SHALL BE R-6,FOIL-BACKED AND PROVIDED AN ADDITIONAL 1-INCH GAP AROUND THE NECK TO INSTALLINSULATED FLEX DUCT.THE MANUFACTURER SHALL PROVIDE PUBLISHED PERFORMANCE DATA FOR THE SLOT/LINEARDIFFUSER. THE DIFFUSER SHALL BE TESTED IN ACCORDANCE WITH ANSI/ASHRAE STANDARD70-2006.LOUVERED FACE DIFFUSERS:CEILING DIFFUSERS SHALL BE OF THE SIZES AND MOUNTING TYPES SHOWN ON THE PLANSAND OUTLET SCHEDULE. A UNIFORM FACE SIZE AND APPEARANCE WHEN DIFFERENT NECKSIZES ARE USED IN THE SAME AREA. ALL CONES SHALL BE ONE PIECE PRECISIONDIE-STAMPED; THE BACK CONE SHALL ALSO INCLUDE AN INTEGRALLY DRAWN INLET (WELDED-ININLETS AND CORNER JOINTS ARE NOT ACCEPTABLE). THE TWO INNER CONES SHALL BECONSTRUCTED AS A SINGLE, REMOVABLE INNER CONE ASSEMBLY FOR EASY INSTALLATIONAND CLEANING. THE INNER CONE ASSEMBLY MUST HAVE A HOLE WITH REMOVABLE PLUG INTHE CENTER TO ALLOW QUICK ADJUSTMENT OF AN OPTIONAL INLET DAMPER WITHOUTREMOVING THE INNER CONE ASSEMBLY. DIFFUSERS SHALL BE CONSTRUCTED OF 24-GAUGESTEEL OR 0.040 ALUMINUM.THE FINISH SHALL BE #26 WHITE. THE FINISH SHALL BE AN ANODIC ACRYLIC PAINT, BAKED AT315°F FOR 30 MINUTES. THE PENCIL HARDNESS MUST BE HB TO H. THE PAINT MUST PASS A100-HOUR ASTM B117 CORROSIVE ENVIRONMENTS SALT SPRAY TEST WITHOUT CREEPAGE,BLISTERING OR DETERIORATION OF FILM. THE PAINT MUST PASS A 250-HOUR ASTM D870WATER IMMERSION TEST. THE PAINT MUST ALSO PASS THE ASTM D2794 REVERSE IMPACTCRACKING TEST WITH A 50-INCH POUND FORCE APPLIED.OPTIONAL ROUND DAMPER SHALL BE CONSTRUCTED OF HEAVY GAUGE STEEL. DAMPER MUSTBE OPERABLE FROM THE FACE OF THE DIFFUSER. OPTIONAL SECTORIZING BAFFLES SHALL BEAVAILABLE TO RESTRICT THE DISCHARGE AIR IN CERTAIN DIRECTIONS.OPTIONAL MOLDED INSULATION BLANKET SHALL BE AVAILABLE. THE INSULATION WILL BE R-6,FOIL-BACKED AND PROVIDED AN ADDITIONAL 1-INCH GAP AROUND THE NECK TO INSTALLINSULATED FLEX DUCT.THE MANUFACTURER SHALL PROVIDE PUBLISHED PERFORMANCE DATA FOR THE SQUAREDIFFUSER. THE DIFFUSER SHALL BE TESTED IN ACCORDANCE WITH ANSI/ASHRAE STANDARD70-2006.LEGENDSYMBOLSX1X2FDFSDFDFSDTHSUNIT#3150 Holcomb Bridge RoadNorcross, Georgia 30071404.330.9798PROJECT # 125297SOGOARCHITECTURE & INTERIORSATLANTA, GA TEL 678.271.8054 STUDIOSOGO.COMDESCRIPTIONDIFFUSER, GRILLE, REGISTER OR LOUVER TAGX1 = TYPE, X2 = CFMPOSITIVE PRESSURE (AIR GOES OUT) DIFFUSER OR REGISTER, 4-WAYAIR PATTERN (UNLESS OTHERWISE NOTED)NEGATIVE PRESSURE (AIR GOES IN) GRILLEPOSITIVE PRESSURE AIRFLOW (TYP. SUPPLY)NEGATIVE PRESSURE AIRFLOW (TYP. RETURN/EXHAUST)FLEXIBLE DUCTMANUAL VOLUME DAMPER (MVD)BACKDRAFT DAMPER (BDD)VERTICAL (TYP. WALL) FIRE DAMPERVERTICAL (TYP. WALL) COMBINATION FIRE/SMOKE DAMPERHORIZONTAL (TYP. FLOOR/CEILING) FIRE DAMPERHORIZONTAL (TYP. FLOOR/CEILING) COMBINATION FIRE/SMOKEDAMPERTHERMOSTATHUMIDISTATREMOTE TEMPERATURE SENSORINTERNALLY LINED DUCTDUCT UPDUCT UPDUCT DOWNSUPPLY DUCTEQUIPMENT TYPEEQUIPMENT NUMBER. WHERE A LETTER IS USED, THERE ARE MULTIPLEINSTANCES.ABBREVIATIONSAFFBDDAHUCO2CUDDBDHEAEATEDHEFESPEWHFFCUFDFSDFURNHIHLATLWTABOVE FINISHED FLOORMBACKDRAFT DAMPERMAAIR HANDLING UNITCARBON DIOXIDECONDENSING UNITCONDENSATE DRAINMAUMAVMBHMFCUDRY BULBMHPDEHUMIDIFIERMVDEXHAUST AIRNCENTERING AIR TEMPERATURENOELECTRIC DUCT HEATEROAEXHAUST FANOBDEXTERNAL STATIC PRESSUREPIUELECTRIC WALL HEATERRADEGREES FAHRENHEITRHFAN COIL UNITRTUFIRE DAMPERSACOMBINATION FIRE/SMOKE DAMPER SPFURNACEHUMIDISTATU.N.OUCINTAKE HOODVAVLEAVING AIR TEMPERATUREWBLEAVING WATER TEMPERATUREWLMOTORMAKE-UP AIRMAKE-UP AIR UNITMANUAL AIR VENT1,000 BTU PER HRMINI FAN COIL UNITMINI HEAT PUMPMANUAL VOLUME DAMPERNORMALLY CLOSEDNORMALLY OPENOUTSIDE AIROPPOSED BLADE DAMPERPOWER INDUCTION UNITRETURN AIRRELIEF HOODROOFTOP UNITSUPPLY AIRSTATIC PRESSUREUNLESS NOTED OTHERWISEUNDER CUT DOORVARIABLE AIR VOLUMEWET BULBWALL LOUVERISSUANCE SCHEDULE06.27.25 PERMITREVISION SCHEDULEMARK DATEDESCRIPTIONProject IDDrawn ByChecked BySheet Title2428SCJDGENERALDrawingNo.M-0.1Paper Size:24" x 36"3150 Holcomb Bridge RoadNorcross, Georgia 30071404.330.9798PROJECT # 125297SOGOARCHITECTURE & INTERIORSATLANTA, GA TEL 678.271.8054 STUDIOSOGO.COMDIFFUSER, GRILLE, AND REGISTER SCHEDULECALLOUTDESCRIPTIONRC1818EGGCRATE GRILLEFACE SIZE(IN)18x18INLET SIZE(IN)18x18NOISECRITERIA @MAX CFM25MODELTITUS 50FS2S406PLENUM SLOT 4' (2) 1" SLOTS 6" NECK48x46Ø25TITUS TBD 80S2S408PLENUM SLOT 4' (2) 1" SLOTS 8" NECK48x48Ø25TITUS TBD 80SCEC2424 EGGCRATE GRILLE24x2424x2425TITUS 50FSCL06LOUVERED FACE SUPPLY12x126Ø25TITUS TMSA. REFER TO ARCHITECTURAL DRAWINGS FOR COLOR SELECTIONS. CONTRACTOR SHALL SUBMIT COLOR/FINISH CHARTS FORARCHITECTURAL REVIEW AND SELECTION.B. THE CONTRACTOR SHALL COORDINATE AIR DEVICE FRAME AND/OR SUSPENSION TYPE WITH THE ARCHITECTURAL REFLECTED CEILINGPLAN.DIFFUSER TAKE-OFF DETAILNO SCALEROUND SHEETMETAL DUCTDIAMETER ASINDICATED ONPLANS.TRUNK DUCTSPIN-IN FITTINGWITH SCOOPDAMPER HERE FORACCESSIBLE CEILINGSNYLON TIE ON EXTERIOR INSULATIONNYLON TIE ON INTERNAL LINERINTERIOR LINERPREINSULATED FLEXIBLEDUCTWORK. SEESPECIFICATIONS. LENGTHSHALL NOT EXCEED 8'-0".PROVIDE SUPPORT PERSMACNA STANDARDS.INSTALL FREE OF KINKS &SAGS.DAMPER HERE FORINACCESSIBLE CEILINGS(I.E. HARD CEILINGS)PROVIDE FACTORY,PRE-MOLDED INSULATIONBLANKET ON DIFFUSERBACKPLATENOTE:CONNECT FLEX DUCT ENDS TOSHEET METAL DUCT AND DIFFUSERNECK WITH NYLON TIES. INTERIORLINER AND EXTERIOR INSULATION OFFLEX DUCT TO BE TIED INDIVIDUALLY.INSTALL USING TENSIONING TOOL ASPER MANUFACTURER'SRECOMMENDATIONS.SUPPLY DIFFUSER CEILINGSEE ARCH.WHERE BRANCH DUCT SIZE DIFFERS FROMSCHEDULED DIFFUSER NECK SIZE, CONTRACTORSHALL PROVIDE NECESSARY TRANSITION.PLENUM SLOT DIFFUSER DETAILNO SCALENYLON TIE ON EXTERIOR INSULATIONNYLON TIE ON INTERNAL LINERINTERIOR LINERROUND SHEETMETAL DUCTDIAMETER ASINDICATED ONPLANS.BRANCH DUCTNOTE:CONNECT FLEX DUCT ENDS TOCEILINGSEE ARCH.SHEET METAL DUCT AND DIFFUSERNECK WITH NYLON TIES. INTERIORLINER AND EXTERIOR INSULATION OFFLEX DUCT TO BE TIED INDIVIDUALLY.INSTALL USING TENSIONING TOOL ASPER MANUFACTURER'S RECOMMENDATIONS.PREINSULATED FLEXIBLEDUCTWORK. SEESPECIFICATIONS. LENGTHSHALL NOT EXCEED 8'-0".PROVIDE SUPPORT PERSMACNA STANDARDS.INSTALL FREE OF KINKS &SAGS.DAMPER HERE FORINACCESSIBLE CEILINGS(I.E. HARD CEILINGS)SUPPLY DIFFUSERWITH ADJUSTABLEAIR PATTERN CONTROLAND ACCESSIBLE INLETDAMPER CONTROLDUCTWORK DETAILSCOPYRIGHT - PROFICIENT ENGINEERING, INC. - 2009 - WWW.PROFICIENTENGINEERING.COMNO SCALES-CLIP JOINT ORADHESIVE GASKETFITTING45°LATERALTEEROUND - ROUNDCONICAL TEEAIRFLOWM.V.D.RECTANGULAR - ROUNDM.V.D.AIRFLOWX1X2WHERE:X2 = (1/4)*(X1), 4" MIN.RECTANGULAR - RECTANGULARISSUANCE SCHEDULE06.27.25 PERMITREVISION SCHEDULEMARK DATEDESCRIPTIONProject IDDrawn ByChecked BySheet Title2428SCJDDETAILS &SCHEDULESDrawingNo.M-0.2Paper Size:24" x 36"24" x 36"Paper Size:12'8'0' 2' 4'1 1/4" = 1'-0" FIRST FLOOR PLAN - MECHANICALDrawingNo.M-1.0NFLOOR PLANMECHANICAL2428SCJDProject IDDrawn ByChecked BySheet TitleDESCRIPTIONMARK DATEREVISION SCHEDULEISSUANCE SCHEDULE06.27.25 PERMITSOGOARCHITECTURE & INTERIORSATLANTA, GA TEL 678.271.8054 STUDIOSOGO.COM3150 Holcomb Bridge RoadNorcross, Georgia 30071404.330.9798PROJECT # 125297
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
MSW Cell No. 6 - Geosynthetic...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-64300-NONST-2026-000000029
State Government of Georgia
Bid Due: 7/15/2026
Description Opening Date/Time Closing Date/Time Red Clay Theatre Mural RFQ June 16, 2026
City of Duluth
Bid Due: 9/01/2026