ROCKEFELLER WATER BUILDING IMPROVEMENTS

Project Information

Bid Title
ROCKEFELLER WATER BUILDING IMPROVEMENTS
Issuing Agency
City of Ceres
Location
California
Published Date
Jan 30, 2026
Closing Date
Feb 26, 2026
Government Level
State & Local
Status
Closed
Ref. #
2402
Original Source
Join to Access Full Details
Project Description
Bid Number: 2402
Bid Title: ROCKEFELLER WATER BUILDING IMPROVEMENTS
Category: Bid & RFP Opportunities
Status: Open
Description:

The work to be performed includes, but is not limited to:

North Building: Provide tenant improvement to existing building for service space. Work to include demolition of interior walls, plumbing, and electrical. New work to include new walls, ceilings, finishes, new mechanical, plumbing, electrical, and structural to support space configuration.

South Building: Provide tenant improvement to existing building to provide warehouse space. Work to include demolition of interior walls, plumbing, and electrical. New work to include toilet fixture replacement and lighting to support new space configuration.

Sitework: Modify existing site to provide new water service to north building.

Such other items or details, not mentioned above, that are required by the Drawings and Technical Specifications Plans, City of Ceres Standard Specifications and Typical Details, and the Special Conditions shall be performed, placed, constructed, or installed.

The project is located at 1921 Rockefeller Drive, Ceres California. Bids are required for the entire work described herein.

Publication Date/Time:
1/30/2026 12:00 AM
Closing Date/Time:
2/26/2026 2:00 PM
Pre-bid Meeting:
02/12/2026 at 2:00 PM
Contact Person:
Kevin Silva (kevin.silva@ceres.gov)
Related Documents:
Attachment Preview
CITY OF CERES
DEPARTMENT OF ENGINEERING
CALIFORNIA
NOTICE INVITING BIDS
BID FORMS
SAMPLE CONTRACT DOCUMENTS
SPECIAL PROVISIONS
FOR
PROJECT NUMBER 2402
ROCKEFELLER WATER BULDING IMPOVEMENTS
Javier Lopez - Mayor
Daniel A. Martinez Vice Mayor
Rosalinda L. Vierra Council Member
James Casey Council Member
Otero Cerina Council Member
Douglas D. Dunford City Manager
Nubia Goldstein City Attorney
Michael R Beltran II, PE City Engineer
PREBID MEETING:
BID OPENING:
February 12, 2026 at 2:00 p.m.
February 26, 2026 at 2:00 p.m.
TABLE OF CONTENTS
ITEM
PAGE NO.
BID DOCUMENTS ........................................................................................................................... I
NOTICE INVITING BIDS ........................................................................................................... II
INSTRUCTIONS TO BIDDERS ................................................................................................. IV
SECURING DOCUMENTS .................................................................................................... IV
EXAMINATION OF SITE AND CONTRACT .......................................................................... IV
INTERPRETATION OF DRAWINGS AND DOCUMENTS .................................................... IV
PRE-BID CONFERENCE........................................................................................................ V
ADDENDA ............................................................................................................................... V
ALTERNATE BIDS .................................................................................................................. V
LOWEST RESPONSIBLE BIDDER: ....................................................................................... V
CONTRACT TIME................................................................................................................... V
COMPLETION OF BID FORMS............................................................................................. VI
MODIFICATIONS OF BIDS ................................................................................................... VI
SUBCONTRACTORS ............................................................................................................ VI
LICENSING REQUIREMENTS .............................................................................................. VI
BID GUARANTEE (BOND) .................................................................................................... VI
IRAN CONTRACTING ACT OF 2010 ................................................................................... VII
NONCOLLUSION DECLARATION ....................................................................................... VII
BIDDER INFORMATION AND EXPERIENCE FORM .......................................................... VII
WORKERS COMPENSATION CERTIFICATION ................................................................. VII
SIGNING OF BIDS ............................................................................................................... VIII
SUBMISSION OF SEALED BIDS ........................................................................................ VIII
OPENING OF BIDS ............................................................................................................. VIII
WITHDRAWAL OF BID.......................................................................................................... IX
BIDDERS INTERESTED IN MORE THAN ONE BID ............................................................ IX
SUBSTITUTION OF SECURITY............................................................................................ IX
PREVAILING WAGES ........................................................................................................... IX
DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS .......................................... X
INSURANCE REQUIREMENTS ............................................................................................. X
PEFORMANCE BOND AND PAYMENT BOND REQUIREMENTS ....................................... X
SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES.................. X
FILING OF BID PROTESTS ................................................................................................... X
BASIS OF AWARD; BALANCED BID .................................................................................... XI
AWARD PROCESS ............................................................................................................... XI
EXECUTION OF CONTRACT ............................................................................................... XI
INTERNET BASED CONSTRUCTION MANAGEMENT SYSTEM ...................................... XII
QUESTIONS ........................................................................................................................ XIII
BID FORMS .................................................................................................................................XIV
BID.............................................................................................................................................XV
1. BID BOND...................................................................................................................XX
2. LIST OF SUBCONTRACTORS ...............................................................................XXIII
3. NONCOLLUSION DECLARATION......................................................................... XXVI
4. IRAN CONTRACTING ACT CERTIFICATION ...................................................... XXVII
5. BIDDER INFORMATION AND EXPERIENCE FORM.......................................... XXVIII
SAMPLE CONTRACT DOCUMENTS ....................................................................................XXXVI
CONSTRUCTION CONTRACT .................................................................................................. 1
EXHIBIT “A” BID SCHEDULE ................................................................................................... 25
EXHIBIT “B” PLANS AND SPECIFICATIONS .......................................................................... 26
GENERAL ................................................................................................................................. 27
SCOPE OF WORK................................................................................................................ 27
PERFORMANCE .................................................................................................................. 27
SCHEDULE OF VALUES...................................................................................................... 27
COORDINATION/COOPERATION....................................................................................... 27
INSPECTION OF SITE ......................................................................................................... 27
DUST CONTROL .................................................................................................................. 27
PERMITS, BONDS, LICENSES AND INSURANCE ............................................................. 28
PUBLIC CONVENIENCE AND SAFETY .............................................................................. 28
WATER POLLUTION CONTROL ......................................................................................... 31
STREET SWEEPING ............................................................................................................ 46
CLEARING AND GRUBBING ............................................................................................... 48
SURVEYING SERVICES ...................................................................................................... 48
MONUMENTATION .............................................................................................................. 48
AS-BUILT DRAWINGS ......................................................................................................... 49
REMOVE CONCRETE.......................................................................................................... 49
INSTALL CONCRETE........................................................................................................... 49
TRAFFIC STRIPES AND PAVEMENT MARKINGS ............................................................. 50
RESTORATION .................................................................................................................... 51
EXHIBIT “C” SPECIAL CONDITIONS....................................................................................... 53
EXHIBIT “D” CERTIFICATION .................................................................................................. 54
EXHIBIT “E” PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION............... 55
EXHIBIT “F” PAYMENT AND PERFORMANCE BONDS......................................................... 56
PERFORMANCE BOND ....................................................................................................... 57
PAYMENT BOND.................................................................................................................. 62
APPENDIX ................................................................................................................................ 65
CITY OF CERES STANDARD DESIGNS............................................................................. 66
STATE GENERAL PREVAILING WAGE RATES ................................................................. 67
REGULATION VIII FUGITIVE PM10 PROHIBITIONS....................................................... 68
BID DOCUMENTS
I
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

RFP: Design - ORH Complete St...

Bid Title: RFP: Design - ORH Complete Streets - Arata to Windsor Rd

Town of Windsor, CA

Bid Due: 8/06/2026

RFP #26-04- DESIGN-BUILD SERV...

RFP #26-04- DESIGN-BUILD SERVICES AHS BLD F REPLACEMENT AND VARIOUS CAMPUS MODERNIZATIONS PROJECT

Martinez Unified School District

Bid Due: 8/05/2026