Carteret County Leon Mann Jr. Enrichment Center Fire System Replacement RFP
Project Information
- Bid Title
- Carteret County Leon Mann Jr. Enrichment Center Fire System Replacement RFP
- Issuing Agency
- County of Carteret
- Location
- North Carolina
- Published Date
- May 26, 2026
- Closing Date
- Jun 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Carteret County Leon Mann Jr. Enrichment Center Fire System Replacement RFP
Category: General County Bids Status: Open Description: Please see attached / related document for all information.
Publication Date/Time: 5/26/2026 12:00 AM Closing Date/Time: 6/10/2026 10:00 AM Related Documents: - Attachment Preview
-
RFP NO. 052626SCRequest for ProposalCarteret County GovernmentLeon Mann Jr. Enrichment CenterFire Alarm System Replacement and MonitoringIssued: May 26, 2026Submission Deadline: June 10, 2026 by 10:00 AM, EST.RFP NO. 052626SCCARTERET COUNTY GOVERNMENTPhone: 252-648-7877REQUEST FOR PROPOSALDate:05/26/2026To:Interested ContractorsProject Name:Leon Mann Jr. Enrichment Center Fire Alarm Replacement and MonitoringScope of Work:Carteret County Government is seeking competitive proposals for the installation of a new Cellular-Enabled Fire Alarm Systemas well as an alternate proposal for monitoring, maintenance, repair and inspections for Carteret County Government’s LeonMann Jr. Enrichment Center located at 3820 Galantis Drive, Morehead City, NC 28557.The Contractor shall provide the services discussed in this scope of work with its own workforce. The Contractor may proposeto subcontract portions of the work provided that their proposals clearly indicate what work they plan to subcontract and towhom and that all information required about the prime contractor is also included for each proposed subcontractor. TheCounty reserves the right to approve and or deny all subcontractors. The Contractor shall provide all necessary labor andequipment for the following service.The Contractor shall abide by the details and shall refer to the diagrams and the provided shop drawings in addition to thescope of work specified within the documents provided below.General Scope of Work• The Contractor shall provide a proposal for the disposal of old system(s), which includes the abandoned securitysystem, all wiring, and devices, and the furnishing and installation of a new cellular-enabled fire alarm system. Thisincludes all associated equipment, devices, and hardware, such as but not limited to smoke detectors, horns, strobes,heat detectors, pull stations, key pads, fire alarm control panel(s) (FACP), transmitters, cellular communicators, backup batteries, wire, HVAC shutdown integration, door devices, cover plates, signage, and any other necessarycomponents.• All the existing intrusion detection devices and components shall be removed and abandoned. Any areas whereintrusion devices are removed shall be repaired, and have blank plates installed as required.• A sub-FACP shall be installed near the front entrance, preferably in the location of the existing.• The Contractor shall include submittals of equipment to be used. Please provide make, model and serial numberalong with any warranty information per device. Preferred manufacture is Fire Lite or an affiliated brand.• The awarded Contractor shall provide three (3) laminated hardcopies and one (1) digital PDF copy of the newsystem’s engineered scaled drawings with each device labeled on a new map as well as the devices themselves. Anyassociated engineering cost shall be included within the Contractors proposal. NTS floor plan is provided for referencebelow.• The Contractor shall adhere to NFPA and all other applicable codes to determine if additional devices are requiredwithin the facility. If additional devices are required for code compliance, all associated cost shall be included with theContractors proposal.RFP NO. 052626SC• All required test and certifications shall be the Contractors responsibility to obtain. Scheduling shall be coordinatedwith the County POC.• A training session shall be conducted with designated County staff after all necessary documentation is provided tothe County POC.Schedule• Interested Contractors shall contact the County POC (Point of Contract) listed below to schedule a site visit.• Work, regardless of when, shall be scheduled with the County POC. After-hours work may be required.Additional Provisions• All measurements and material quantities shall be field verified by the Contractor.• Submittals of new materials shall be submitted with the Contractor’s proposal. All new materials are subject toapproval by Carteret County.• Protect all surfaces below the ceiling and all ceiling accessories from damage, dust and debris while working. Allassociated debris shall be cleaned and hauled off at the end of each working day. The Contractor shall be responsiblefor providing all necessary cleaning equipment.• The Contractor shall ensure work areas are properly blocked off. Ladders and tools shall be stored in a safe mannerwhen not in use.• All new material shall be installed per the manufacture’s recommendations and instructions.• Any damages caused by the Contractor shall be repaired or replaced at the Contractor’s expense, subject to theCounty’s discretion.• All debris shall be removed and disposed offsite.• The awarded Contractor shall enter into a Contract with the County, adhering to the Terms and Conditions andAgreement for Services therein.• The Contractor shall obtain the required permits, if required, give all notices to the County POC (including a copy ofany permits), and comply with all laws, ordinances, codes, ADA requirements, rules and regulations bearing on theconduct of the work. Permits shall be posted onsite at project location. No time extensions shall be granted or financialconsideration given to the Contractor for time or monies lost due to violations of any such ordinance, code, law orregulations that may occur.Alternate Bid #1: The Contractor shall submit a separate proposal for 24/7 monitoring of the new system. The system shall beconfigured to notify local emergency agencies. All maintenance, repairs, and inspections shall also be included as a part of thisalternate bid at monthly rate, in compliance with all applicable codes.LEON MANN JR.SENIOR ENRICHMENT CENTER3820 GALANTIS DRIVEMOREHEAD CITY, NORTH CAROLINA 28557FIRE ALARM SYSTEMJRHFIRE DESIGN & CONSULTINGFIRE ALARM SYSTEM SYMBOL GUIDANCE (ADAPTED FROM NFPA 170 2018)1. THE INTENTION OF THIS GUIDANCE IS TO PROVIDE GREATER CLARITY TO FIRE ALARM SYSTEM DESIGN AND SHOP DRAWINGS.2. IT IS REQUESTED THAT FIRE ALARM DESIGNS BE SHOWN ON THEIR OWN SHEETS (AS OPPOSED TO BEING PRESENTED ON SHEETS WITH OTHER ELECTRICAL SYSTEMS).3. PLEASE USE THE SYMBOLS SHOWN IN THE CHART IN LIEU OF THE CORRESPONDING SYMBOL AS SHOWN IN NFPA 170.4. FOR SYMBOLS NOT SHOWN IN CHART BELOW, PLEASE USE THE SYMBOLS SHOWN IN NFPA 170.5. LETTERING HEIGHT SHALL BE AT LEAST 1/8" ON PLANS (SYMBOLS BELOW ARE TO THIS SCALE).6. NEW EQUIPMENT SHALL BE SHOWN USING A SOLID LINE. EXISTING EQUIPMENT SHALL BE SHOWN USING A DASHED LINE. EQUIPMENT TO BE DEMOLISHED SHALL BE NOTED ACCORDINGLY AND SPECIFICALLY.SYMBOLS MANUFACTURE MODULE NUMBERDEVICEFACPSP#cd#cd#cdCAIMH 135FFAAFACSRTSAOMDHFIRE LITEFIRE LITESYSTEMSENSORSYSTEMSENSORSYSTEMSENSORFIRE LITEFIRE LITEFIRE LITEFIRE LITENAPCO /STAIRLINKFIRE LITEFIRE LITEFIRE LITEFIRE LITEES-200XADDRESSABLE FIRE ALARM CONTROL PANELSD365ADDRESSABLE PHOTO SMOKE DETECTORSCWLEDWALL MOUNTED STROBE ONLYP2WLEDWALL MOUNTED HORN/STROBEPC2WLEDCEILING MOUNTED HORN/STROBEMMF-300ADDRESSABLE NON-RELAY DUCT DETECTOR w/SD365R SMK DETH365ADDRESSABLE HEAT DETECTOR FIXED 135BG12LXADDRESSABLE MANUAL FIRE ALARM PULL STATIONANN-80-WREMOTE FIRE ALARM ANNUNCIATORSLE-MAX2-FIRE FIRE ALARM DUAL PATH COMMUNICATORD355PLLOW-FLOW NON-RELAY DUCT-DETECTORRTS151KEYREMOTE TEST STATION w/KEY LOCKCRF-300FM SERIESADDRESSABLE FORM-C RELAY MODULEFM996 SURFACE MOUNT OR FM998 FLUSH MOUNTELECTROMAGNETIC DOOR HOLDERSHEET NO.FA-0.1FA-0.2FA-0.3SHEET LEGENDDESCRIPTIONCOVER SHEET, FIRE ALARM SYSTEM SYMBOL, AND SHEET LEGENDDETAIL - UL - 2-HOURS GYP WALL DETAIL, BUILDING TYPE AND CODES USED, FIRE ALARM NOTES, ANDFIRE ALARM TYPICAL RISER DIAGRAMFIRE ALARM EQUIPMENT WIRING DETAILSFA-1.1BUILDING FLOOR PLAN - AREA A - FIRE ALARM, AND SITE KEY PLANFA-1.2BUILDING FLOOR PLAN - AREA B - FIRE ALARM, AND SITE KEY PLANSHEET NOTES:ALL EQUIPMENT SHALL BE AS SPECIFIED OR AN APPROVED EQUAL. NOSUBSTITUTIONS SHALL BE ACCEPTED WITHOUT PRIOR WRITTENAPPROVAL FROM THE OWNER. COMBINATION PANELS SHALL NOT BEACCEPTED. ONLY FIRE ALARM SYSTEMS EQUAL TO OR EXCEEDING THEQUALITY, PERFORMANCE, AND FUNCTIONALITY OF FIRE-LITE AND SYSTEMSENSOR PRODUCTS SHALL BE ACCEPTED.JRHFIRE DESIGN & CONSULTINGJRH FIRE DESIGN & CONSULTING, LLC.N.I.C.E.T CERTIFICATIONLEVEL III FIRE ALARM SYSTEMSCERT. NUMBER 116117QUALIFIER: JODY RAY HUNTNICETEXP. DATER03/01/27CARTERET COUNTY - GSAFA-0.1CUSClassified byUnderwritersLaboratories, Inc.to UL 1479 andCAN/ULC-S115System No. W-L-1054ANSI/UL1479 (ASTM E814)F Ratings —1 and 2 Hr (See Items 1 and3)T Rating — 0 HrL Rating at Ambient — Less Than 1CFM/sq ftL Rating at 400 F — Less Than 1 CFM/sqftCAN/ULC S115F Ratings — 1 and 2 Hr (See Items 1 and3)FT Rating — 0 HrFH Ratings —1 and 2 Hr (See Items 1and 3)FTH Rating — 0 HrFTH Rating — 0 HrL Rating at Ambient — Less Than 1CFM/sq ft L Rating at 400 F — Less Than1 CFM/sq ft1AA321BASECTION A-A1. Wall Assembly — The 1 or 2 hr fire-rated gypsum wallboard/stud wall assembly shall be constructed of the materials and in the manner specifiedin the individual U300 or U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following constructionfeatures:A. Studs — Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm)lumber spaced 16 in. (406 mm) OC. Steel studs to be min 2-1/2 in. (64 mm) wide and spaced max 24 in. (610 mm) OC. When steel studs areused and the diam of opening exceeds the width of stud cavity, the opening shall be framed on all sides using lengths of steel stud installedbetween the vertical studs and screw-attached to the steel studs at each end. The framed opening in the wall shall be 4 to 6 in. (102 to 152mm) wider and 4 to 6 in. (102 to 152 mm) higher than the diam of the penetrating item such that, when the penetrating item is installed in theopening, a 2 to 3 in. (51 to 76 mm) clearance is present between the penetrating item and the framing on all four sides.B. Gypsum Board* — 5/8 in. (16 mm) thick, 4 ft (122 cm) wide with square or tapered edges. The gypsum board type, thickness, number oflayers, fastener type and sheet orientation shall be as specified in the individual U300 or U400 Series Design in the UL Fire ResistanceDirectory. Max diam of opening is 32-1/4 in. (819 mm) for steel stud walls. Max diam of opening is 14-1/2 in. (368 mm) for wood stud walls.The F and FH Ratings of the firestop system are equal to the fire rating of the wall assembly.2. Through-Penetrants — One metallic pipe, conduit or tubing to be installed either concentrically or eccentrically within the firestop system. Theannular space shall be min 0 in. to max 2-1/4 in. (57 mm). Pipe may be installed with continuous point contact. Pipe, conduit or tubing may beinstalled at an angle not greater than 45 degrees from perpendicular. Pipe, conduit or tubing to be rigidly supported on both sides of wallassembly. The following types and sizes of metallic pipes, conduits or tubing may be used:A. Steel Pipe — Nom 30 in. (762 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.B. Iron Pipe — Nom 30 in. (762 mm) diam (or smaller) cast or ductile iron pipe.C. Conduit — Nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing or 6 in. (152 mm) . diam steel conduit.D. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing.E. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) regular (or heavier) copper pipe.3. Fill, Void or Cavity Material* — Sealant — Min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces ofwall. At the point or continuous contact locations between pipe and wall, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at thepipe wall interface on both surfaces of wall.* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada),respectively.AFA-0.2NOT TO SCALEBuilding Code Year: 2018NFPA 72 Code Year: 2018Use Group: A-3 ASSEMBLYAlteration Level: (Required for renovationprojects using the NCBC)N/AChange of Use? Yes/No: NoConstruction Type: II-BOccupancy Load: N/AFIRE ALARM NOTES1. PROVIDE A COMPLETE NEW FIRE ALARM SYSTEM AS INDICATED ONTHE DRAWINGS AND SPECIFICATIONS. THE NEW SYSTEM SHALL BE FULLYINSTALLED, TESTED, CERTIFIED, AND PLACED INTO OPERATION PRIOR TOREMOVAL OF THE EXISTING FIRE ALARM SYSTEM.2. THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLYOPERATIONAL THROUGHOUT THE DURATION OF CONSTRUCTION UNTILTHE NEW SYSTEM HAS BEEN ACCEPTED BY THE AUTHORITY HAVINGJURISDICTION (AHJ) AND THE OWNER.3. UPON FINAL ACCEPTANCE, TESTING, AND CERTIFICATION OF THENEW FIRE ALARM SYSTEM, THE CONTRACTOR SHALL REMOVE ALLEXISTING FIRE ALARM EQUIPMENT, DEVICES, WIRING, CONDUIT, BACKBOXES, AND ASSOCIATED COMPONENTS THAT ARE NO LONGER REQUIREDFOR THE NEW SYSTEM. (NOTE: BACK BOXES THAT CAN'T BE REMOVEDNEEDS TO BE COVERED WITH A BLANK COVER PLATE.)4. ALL REMOVED EXISTING FIRE ALARM DEVICES, EQUIPMENT, ANDASSOCIATED MATERIALS SHALL BE TURNED OVER TO CARTERET COUNTYGSA.5. THE NEW FIRE ALARM SYSTEM SHALL BE INSTALLED IN ACCORDANCEWITH ALL APPLICABLE CODES AND STANDARDS, INCLUDING BUT NOTLIMITED TO THE 2018 NORTH CAROLINA FIRE CODE, NFPA 72, NFPA 70, ANDALL LOCAL AHJ REQUIREMENTS.6. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED SYSTEMCHANGEOVER ACTIVITIES TO MINIMIZE INTERRUPTION TO BUILDINGOPERATIONS AND LIFE SAFETY PROTECTION.7. THE CONTRACTOR SHALL BE REQUIRED TO HAVE ALL FIRE ALARMSHOP DRAWINGS, CALCULATIONS, BATTERY CALCULATIONS, AND RELATEDSUBMITTAL DOCUMENTS REVIEWED, SIGNED, AND SEALED BY A LICENSEDNORTH CAROLINA PROFESSIONAL ENGINEER PRIOR TO SUBMISSION TOTHE AUTHORITY HAVING JURISDICTION (AHJ) FOR REVIEW AND APPROVAL.#cd#cd#cdNAC4EOLC#cd#cd#cdNAC3EOLC#cd#cd#cdNAC2EOLC#cd#cd#cdNAC1EOLCANNFAA 02FACPSNAC1PWRDHFACSLCAIMSPFFACDHFSRTSBFA-0.2NOT TO SCALEN.I.C.E.T CERTIFICATIONLEVEL III FIRE ALARM SYSTEMSCERT. NUMBER 116117QUALIFIER: JODY RAY HUNTNICETEXP. DATER03/01/27JRHFIRE DESIGN & CONSULTINGJRH FIRE DESIGN & CONSULTING, LLC.FA-0.2
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Solicitation Number: 61-RFP25010 Project Title: Elevator Services Description: North Carolina Central University is
State Government of North Carolina
Bid Due: 7/21/2026
Traffic Signal Cabinet Assemb...
Project: Traffic Signal Cabinet Assemblies Ref. #: 269-2026-229 Department: City Procurement Type: RFP
City of Charlotte
Bid Due: 7/24/2026