Sanitary Sewer Master Plan Update
Project Information
- Bid Title
- Sanitary Sewer Master Plan Update
- Issuing Agency
- City of San Mateo
- Location
- California
- Published Date
- Mar 31, 2026
- Closing Date
- May 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Sanitary Sewer Master Plan Update
Category: ALL OPEN RFPs Status: Open Description: The City is requesting proposals from qualified engineering firms (Consultant) to provide professional engineering services for the Sanitary Sewer Master Plan Update.
Please note it is the proposer's responsibility to check back on the website for any addenda that may have been issued.
Publication Date/Time: 3/31/2026 3:00 PM Closing Date/Time: 5/5/2026 4:00 PM Related Documents: - Attachment Preview
-
REQUEST FOR PROPOSALSCity of San MateoPublic Works DepartmentSanitary Sewer Master Plan UpdateCITY OF SAN MATEO, CALIFORNIAMarch 2026CITY OF SAN MATEOPublic Works Department330 West 20th AvenueSan Mateo, CA 94403650-522-7300TABLE OF CONTENTSI. BACKGROUND AND INTRODUCTION3II. SCOPE OF SERVICES3III. PROPOSAL9A. SUBMITTAL COVER FORM AND COVER LETTER10B. PROJECT APPROACH AND PROPOSED SCOPE OF WORK10C. EXPERIENCE AND QUALIFICATIONS10D. TEAM ORGANIZATIONAL STRUCTURE11E. RESUMES AND QUALIFICATIONS OF PROPOSED PERSONNEL11F. FEE SCHEDULE11G. CONFLICT OF INTEREST:11H. TERMS AND CONDITIONS:11IV. AGREEMENT AND PAYMENT11A. AGREEMENT11B. PAYMENT12V. SUBMISSION OF THE PROPOSAL12VI. SELECTION PROCESS12VII. SELECTION TIMELINE12VIII. DOCUMENTS AND QUESTIONS13IX. ATTACHMENTS:13March 2026On-Call Consultant Services RFPPage 2 of 13REQUEST FOR PROPOSALSCity of San Mateo, CAPublic Works DepartmentOn-Call Consultant ServicesI. BACKGROUND AND INTRODUCTIONThe City of San Mateo (City) is currently under a Regional Water Quality Control Board (RWQCB) Ceaseand Desist Order (CDO) requiring improvements to its collection and treatment systems to eliminatesanitary sewer overflows and unauthorized discharges. The Clean Water Program (CWP) was establishedto replace aging infrastructure, enhance reliability, reduce inflow and infiltration, provide capacity for wetweather flows, and enhance the treatment processes in the City’s system. The CWP is expected to becompleted by the end of fiscal year 26-27, and a new master planning effort is needed to determineexisting deficiencies in the system, look at future capacity needs, and provide a complete sewer model forthe City’s ongoing needs for analysis of development impacts.San Mateo’s wastewater collection system includes a network of 234 miles of pipe, 5,555 sewer manholes,and 26 sewer pump stations, divided into five major sewer basins labeled A, B, C, D, and E (refer to ExhibitA). To rehabilitate all sewer infrastructure, the City of San Mateo has an overall rehabilitation schedule,which shows a rotating schedule of the five basins’ different phases (i.e. CCTV, Evaluation, Design, andRehabilitation).The City is requesting proposals from qualified engineering firms (Consultant) to provide professionalengineering services for the Sanitary Sewer Master Plan Update (Master Plan Update). The finaldeliverable will include a prioritized short- and long-term Capital Improvement Program (CIP) plan withdetailed descriptions, planning-level cost estimates, and specific recommended order of implementation.An analysis of the current funding mechanisms and how to maximize existing funding will also be part ofthis Master Plan Update, as well as recommendations for developing long-term, sustainable fundingstrategies to maintain the City’s sanitary sewer system infrastructure based on a review of the state ofthe practice in California.Proposals shall be submitted to Tom Williams no later than 4:00 P.M. on Tuesday, May 5, 2026. Eachproposer shall submit copies of the proposal(s) in accordance with Section III, “Proposal,” of this notice.II. SCOPE OF SERVICESThe following Scope of Services describes the specific tasks to be performed by the Consultant. If theConsultant believes that the project can be enhanced in any way by the addition of other tasks or thedeletion of any specified tasks, such information should be included in the proposal.Task 1 – Project Management and CoordinationThis task will include project monitoring and administration, preparation of meeting agendas andminutes, attendance at meetings, preparation of progress and cost summaries, and other QA/QCactivities:March 2026On-Call Consultant Services RFPPage 3 of 13Kickoff MeetingsThe Consultant will conduct a kickoff meeting with City staff to discuss the project scope,approach, schedule and assumptions, communications protocol, and data needs for the SewerMaster Plan.Progress MeetingsIn addition to frequent contact via email and telephone, Consultant will participate in periodicprogress meetings with the City to discuss progress to date, findings, and outstanding issues.Deliverables: Agendas and meeting minutes from the kick-off meeting and project progress meetings Monthly invoices and project progress reportsTask 2 – Data Collection and ReviewReview City’s sewer system information, including: Relevant reports, studies, master plans, maps, facility information, and other required data. Sewer System Maps. Interview of engineering and maintenance staff, and tour of critical system infrastructure. Capital Improvement Program (CIP). Pump station as-built drawings, operating information, and SCADA data. Clean Water Program documentation, project as-built drawings, and current design andconstruction project drawings. Wastewater Treatment Plant (WWTP) flow and processing data, available operations andmaintenance documentation, and ongoing study and analysis documentation assessingplant capacity. Available customer billing or recent water use data. Maintenance logs, maintenance management system data, sewer blockages, and sanitarysewer overflow records. Any smoke test, inspection, and video inspection reports and data. Review of current sewer model data. Proposed or planned development projects, and potential growth projections to be includedin the Sewer Master Plan.- Meet with Planning Department staff to discuss planning issues and expected zoningchanges, and obtain pertinent land use planning maps, data, and documents thatprovide required information.- Meet with Development Review Board staff to discuss current and upcomingdevelopment projects under review, to better understand potential impacts to thesystem.March 2026On-Call Consultant Services RFPPage 4 of 13- Develop loading information for the Foster City, Hillsborough, County of San Mateo, andCollege of San Mateo sewer districts discharging into the City’s collection System. Thisinformation may be available from the individual district sewer master planningdocumentation, but additional investigation and interviews of district staff may berequired.Deliverables: Key findings, listings, and descriptions of available information, and analysis of land useplanning criteria.Task 3 – Flow Monitoring Develop a flow monitoring plan for the sewer system. The monitoring plan will be designedto isolate major sewer basins and subbasins in the system and confirm flows in major trunksewers. Confirm the locations are appropriate for monitoring from the standpoint of hydraulicconditions, safety, and access. Optional – Calibrate and maintain the flow meters and rain gauges during the rainy season. Optional – Review the flow monitoring data during the flow monitoring period to ensuredata quality and consistency.Deliverables: Technical Memo detailing the basis of approach and implementation strategy for effectiveflow monitoring, including maps. Optional – Draft and Final flow monitoring reports.Task 4 – Hydraulic Model Development Develop design criteria to be used to estimate wastewater flows, including wastewater flowfactors for residential and non-residential land uses, diurnal base wastewater flow patterns,and infiltration/inflow (I/I) parameters. Develop a hydraulic model to quantify flows in the sewer system and identify capacitydeficiencies and improvement needs. Review existing parcel, customer billing and water use data, land use type, number ofdwelling units, etc. to determine if the information is sufficient to estimate existingwastewater flows. Estimate future flows based on Task 2 data for development and potential growth projectionprojects to be included in the Sewer Master Plan. Assess potential capacity constraints under the model loads developed. Calibrate the hydraulic model and compare the dry weather and wet weather flowhydrographs with the flow monitoring data and SCADA data. Optional – Assist the City in obtaining the necessary model software for City use.- Evaluate and propose the model software for City consideration.- Acquisition of the model software on behalf of the City.March 2026On-Call Consultant Services RFPPage 5 of 13
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 541310Architectural Services
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Request for Proposals (RFP) f...
Project ID: P40353 Title: Request for Proposals (RFP) for Civil Engineering Services for
Santa Cruz County
Bid Due: 7/28/2026
RFSQ - QUARTERLY PRE-QUALIFIC...
RFx Name: BPM013174 RFx Begin Date (UTC+0): RFSQ - QUARTERLY PRE-QUALIFICATION FOR PUBLIC
San Diego County
Bid Due: 7/27/2026