Building Renovation & HVAC Installation at RWP Gateway Garage Addendum 3
Project Information
- Bid Title
- Building Renovation & HVAC Installation at RWP Gateway Garage Addendum 3
- Issuing Agency
- City of Providence
- Location
- Rhode Island
- Published Date
- Dec 19, 2025
- Closing Date
- Dec 29, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Building Renovation & HVAC Installation at RWP Gateway Garage Addendum 3
- Attachment Preview
-
Procurement #: 51231>CITY OF PROVIDENCE, RHODE ISLANDDepartment: ParksRFP Title: BUILDING RENOVATIONS & HVAC INSTALLATION AT RWP GATEWAY GARAGEOpening Date: 12/29/2025Addendum #: 3Issue Date: 12/18/2025The purpose of this addendum is:See attachmentsProvidence City Hall25 Dorrance StreetProvidence, RI 02903WENDY NILSSONSuperintendent of ParksBRETT P. SMILEYMayorAddendum # 3Building Renovations & HVAC Installation at RWP Gateway GarageDECEMBER 18, 2025Total Pages Including Cover (18 Pages)Acknowledge Addenda on Bid Form** BID DUE DATE MONDAY, DECEMBER 29, 2025 AT 2:15PM **Attachments:1. Addendum Cover Sheet (4 Pages)2. Image of Existing Electrical Panel (1 Page)3. Fire Alarm Control Panel Spec Sheet (4 Pages)4. Metal Awning Drawing (1 Page)5. Garage Door Lintel Photo (1 page)6. Revised Plan Sheets (7 Pages)Questions/Clarifications:1. Q: Detail 1/L-2 references haunch dimensions indicating the finish grade may vary between 1 ½"and 12". Please confirm the intended finish grade elevation for pricing purposes, or advisewhere the grade transition occursA: See Grading Plan on sheet L-1 (#24) for finished grade adjacent to walk2. Q: Are there are liquidated damages associated with the contract?A: No, there will be no liquidated damages in the contract terms3. Q: Is the existing ACT ceiling is to remain in place or be removed?A: The existing ceiling is to be removed4. Q: Should the existing plywood & drywall on the existing CMU walls be removed and disposedof?A: Yes, although the existing plywood panels will be salvaged if they are in satisfactory condition.5. Q: Are the existing interior walls in the current storage room constructed with metal studs??PROVIDENCE PARKS DEPARTMENT1000 Elmwood Avenue, Providence, RI 02905Phone: 401-680-7201WENDY NILSSONSuperintendent of ParksBRETT P. SMILEYMayorA: No, they are wooden studs6. Q: Please advise on the best means of access for delivering materials to the building. Should anyadditional costs be included, such as temporary removal/reinstallation of fencing, siterestoration, re-loaming, etc.?A: See question 8 on Addendum 1, contractor is responsible for restoring site to pre-constructioncondition in any areas disturbed by construction or vehicles.7. Q: Is the ceiling required to receive gypsum board fireproofing? Note A-114 mentions gypsumfireproofing under reflected ceiling notes, but no locations are indicated on the drawings. Pleaseclarify.A: No, the ceiling only receives Closed Cell Spray Foam Ceiling Insulation R-49.8. Q: Is drywall penetration barrier mesh is required at all drywall partitions? Additionally, providethe required gauge and preferred manufacturer.A: Barrier Mesh is not required at any partitions, Please strike Item 3.5 in Section 09 22 16 of theSpecifications.9. Q: Has the owner verified that the existing electrical service could support an upgrade to a 200Amain circuit breaker? Should the contractor assume the existing panel is capable of a 200Acircuit breaker and not include any additional costs to upgrading the existing panel?A: Yes, it is rated for 225A, no upgrades to the panel are needed. (see attached photo)10. Q: Sheet E210 (riser diagram) notes that the electrical contractor is to make secondaryconnections to the new transformer. Is there an anticipated transformer being installed that thecontractor should be aware of?A: No, this is a standard note and not specific to the project.11. Q: Please verify whether the tilt-up doors require power. The electrical drawings do not showcircuitry at these locations.A: No power, the doors are manual.12. Q: Will the Owner remove all existing items currently inside the building prior tocommencement of construction?A: Yes, all items not fixed to the walls, floor, or ceiling will be removed13. Q: Is there any required work related to the existing exterior security camera system?A: No.14. Q: Does the owner require the GC to paint the exterior wood fascia as part of this project?PROVIDENCE PARKS DEPARTMENT1000 Elmwood Avenue, Providence, RI 02905Phone: 401-680-7201WENDY NILSSONSuperintendent of ParksBRETT P. SMILEYMayorA: No.15. Q: What is the existing FACP (Fire Alarm Control Panel) make and model?A: Upon investigation, there is no existing FACP, please carry a cost for installing a new panel.Basis-of-design product: Fire-Lite MS-5UD-3. See attached spec sheet.16. Q: Please provide specifications for metal awnings.A: Basis-of-design is ‘Fortress’ Awning by Rustica, see attached product sheet.17. Q: Is air & water testing required for new windows?A: No.18. Q: Is the HVAC system is fully design-build by the contractor?Which governs for bidding if thereis a conflict between H-101 and the RFP/specs.A: HVAC is fully design-build, with H-101 provided as a framework for the design, H-101 takesprecedent over the Specs.19. Q: Are the listed Carrier units mandatory, or basis-of-design only? If equals are allowed, pleaseconfirm minimum capacity/efficiency requirements.A: They are not mandatory, any substitute must match or exceed the capacity and efficiency of thespecified Carrier Units. (Efficiency 16.0 SEER2 Cooling/8.1 EER2 Heating)20. Q: Is the HVAC system stand-alone or must it tie into an existing BMS?A: It is a stand-alone system21. Q: Please confirm final locations and sizes for the FC-1 access panel and return grille, andrequired service clearances?A: Locations shown are final. Required clearance between unit and service panel is 24” ifadjustments to walls are needed to accommodate this clearance, the cost will be covered by theallowance.22. Q: Is there any service or panel upgrade required beyond what is shown?A: See Question 923. Q: For the unit price 'F&I HVAC System, complete,' define what is included (mechanical only oralso electrical, controls, patching, etc.). Also confirm how SF items (ceilings, flooring, insulation)will be measured for changes.A: This would include all work required to install the system, including the mechanical, electrical,controls, & patching. the only item not included would be the concrete pad for the exterior units.Any changes to SF materials will be calculated as the actual square footage needed +10%PROVIDENCE PARKS DEPARTMENT1000 Elmwood Avenue, Providence, RI 02905Phone: 401-680-7201WENDY NILSSONSuperintendent of ParksBRETT P. SMILEYMayor24. Q: What does the allowance amount cover?A: The allowance covers any additions made to the project, whether it be additional quantities ofbase bid items, new items requested by the owner, or alterations based on unforeseen siteconditions25. Q: Are hazardous materials testing and abatement included in the base bid? Will any requiredabatement be handled by change order or separate contract?A: They are not included, the allowance will cover any testing or abatement required.26. Q: Please confirm that the 10% MBE / 10% WBE are goals, not strict minimums, and that asigned waiver plus good-faith effort keeps the bid responsive?A: Correct27. Q: Please list any items to be salvaged and turned over to the OwnerA: Salvaged items may include exterior doors and any undamaged interior plywood, stockpilesalvaged items for Owner to review, any unwanted items shall be disposed of by Contractor.28. Q: Provide direction/markup indicating which existing utilities must remain active duringconstruction?A: The solar array must remain active during construction, with brief interruptions acceptableduring electrical work29. Q: Are all railings shown are included in the base bid and related unit price(s), what is therequired finish system and color?A: Yes, railings shown are base bid, see Detail 2, Sheet L-2 for finish30. Q: Is fire alarm work limited to device additions/relocations in the project area, or are panelupgrades/new circuits expected?A: All work required is covered in the notes on sheet E-12031. Q: What is the product for sealing the concrete and how many coats are required?A: the basis-of-design product is Prosoco LS Guard, a minimum of 2 coats should be applied32. Q: For new door and window openings in existing walls, please confirm if steel lintels/angles arerequired. If so, provide sizes, bearing, and details, and confirm whether the Engineer of Recordwill design them?A: New Steel Lintels are not specified in the Architectural drawings. Existing steel lintels are in placeover the current garage door and a 2nd door opening that was closed off. (see photo)PROVIDENCE PARKS DEPARTMENT1000 Elmwood Avenue, Providence, RI 02905Phone: 401-680-7201
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Franklin Farm Long Barn Rehab...
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 7/15/2026
N4008526R0177, Design Bid Bui...
Follow N4008526R0177, Design Bid Build - Building 114 Crane 64 Replacement, Naval Undersea
DEPT OF DEFENSE
Bid Due: 7/31/2026