Bid - Sourdough WTP Interim Optimization

Project Information

Bid Title
Bid - Sourdough WTP Interim Optimization
Issuing Agency
City of Bozeman
Location
Montana
Published Date
Mar 17, 2025
Closing Date
Apr 3, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid - Sourdough WTP Interim Optimization
  • Department: City%20Clerk%2C%20Water%20And%20Sewer%2C%20Water%20Treatment%2C%20Utilities
  • Category: Bids \ RFPs \ RFQs
  • Start Date: 03/16/2025 6:00 AM
  • Close Date: 04/03/2025 2:30 PM
ADVERTISEMENT FOR BIDS

CITY OF BOZEMAN

BOZEMAN, MONTANA

SOURDOUGH WTP INTERIM OPTIMIZATION

General Construction

Sealed Bids for the construction of the Sourdough Water Treatment Plant Interim Optimization in Bozeman will be received by City of Bozeman (Owner), at the office of the City Clerk located at 121 N Rouse, Suite 202, Bozeman, MT 59771-1230 or mailed to P.O. Box 1230, Bozeman, MT 59771-1230 until April 3, 2025 at 2:30 PM local time. At that time the Bids received will publicly opened and read aloud.

Project Description:

The Project includes furnishing all labor, skill, equipment, and construction materials to improve safety, accessibility, operational efficiency, and process functionality at the Bozeman WTP. The scope includes:

  1. BID PACKAGE A: Fluoride Transfer Pump Spill Containment Improvements: Modifications to the fluoride transfer pump containment area to enhance operator accessibility, safety, and movement during maintenance. Work is defined in the Construction Drawings and Specifications.
  2. BID PACKAGE B: Membrane Backwash Recycle Improvements: Installing cross-connection process piping and valves to redirect backwash waste directly to the recycle lift station, bypassing the DAFT feed wet well. Work is defined in the Construction Drawings and Specifications.
  3. BID PACKAGE C: Pretreatment Basin Underflow Baffle Curb Modifications: Removing a concrete curb from underflow baffles to streamline sludge cleaning operations in the pretreatment basin. Work is defined in the Construction Drawings and Specifications.
  4. BID PACKAGE D: Headtower Recycle Flow Improvements: Improve discharge piping at the headtower to better integrate recycle flows with raw water streams, to improve reuse water capture and treatment. Work is defined in the Construction Drawings and Specifications.

Bids are requested for the following Contract:

  • Contract No. 1 – General Construction

Owner anticipates that the Project’s total bid price will be approximately $204,999.00. Contractors will be given approximately 260 days to complete the project – the Contract Times can be found in the Agreement.

Issuing Office

The Issuin

* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Menu Software

Menu Software Montana State University - Bozeman Culinary Services is seeking contractors to

State Government of Montana

Bid Due: 7/08/2026

Bid - Bike-Ped Paths - Bozeman

Bid - Bike-Ped Paths - Bozeman Department: Administration Category: Bids \ RFPs \

City of Bozeman

Bid Due: 7/23/2026